Project Overview

The DataVita dv2 facility at Unit 1, York Road, in Chapelhall, Scotland, serves as the corporate headquarters and secondary edge data center for DataVita Ltd, complementing the company’s primary dv1 megacampus at nearby Fortis Park. The facility is designed to provide enterprise customers with secure and resilient digital infrastructure for a range of workloads, including edge colocation, cloud backup, disaster recovery, business continuity, and technology staging environments. Its strategic location within Chapelhall enables dv2 to operate as an important secondary infrastructure node within DataVita’s broader Scottish data center network, providing customers with additional options for geographically distributed deployments and resilient IT architectures. The facility incorporates strict environmental and operational controls designed to maintain stable conditions for mission-critical computing equipment while supporting reliable service delivery. Sustainability is also a central element of the site’s operational strategy, with the facility powered by 100% renewable energy, helping customers reduce the carbon impact associated with their digital infrastructure requirements. A major advantage of the York Road facility is its direct integration with DataVita’s high-speed Scottish metropolitan fiber ring, providing efficient connectivity to other DataVita facilities and regional network infrastructure. This connectivity supports rapid data replication, backup transfers, disaster recovery operations, and low-latency access between distributed enterprise environments. The proximity of dv2 to the larger dv1 campus also enables the two facilities to complement one another, allowing customers to develop resilient infrastructure strategies across multiple locations. By combining secure edge colocation, renewable energy sourcing, disaster recovery capabilities, and integration with a high-speed regional fiber network, DataVita dv2 provides a flexible infrastructure platform for businesses seeking reliable secondary data center capacity in Scotland. The facility strengthens DataVita’s regional presence while supporting enterprises that require secure, sustainable, and geographically resilient digital infrastructure.


Quick Facts

FieldValue
Project NameDataVita dv2 Data Centre Chapelhall: York Road Edge Hub Scotland Specs
LocationUnit 1, York Road, Chapelhall Industrial Estate, Chapelhall, Airdrie, ML6 8NW, Scotland, United Kingdom
StatusOperational
CommissioningActive Operating Facility / Corporate HQ
Total IT Load~1.5 MW – 3.0 MW Critical IT Load Capacity
Total Capacity~20,000 sq ft gross floor area (~8,000 sq ft technical whitespace & operational office space)
Tier LevelTier III Equivalent Concurrently Maintainable Standards
Project TypeCorporate Headquarters, Edge Data Centre & Regional Network Interconnection Node

City Profile

HeaderDetails
City NameChapelhall
Population~7,058
Urban Agglomeration~340,000+ — North Lanarkshire council area
City GDPNot separately reported
Per Capita IncomeNot separately reported
City TierTier 3 – Regional Industrial & Logistics Location
Key StrengthsStrategic location between Glasgow and Edinburgh; direct proximity to the M8 motorway; access to the M73; nearby EuroCentral freight terminal; established industrial heritage; access to the Central Belt workforce; and proximity to Airdrie and Coatbridge.

Companies Involved

HeaderDetails
Developer / Operator DataVita Ltd
Strategic Infrastructure Partner Scottish Power Energy Networks, Host Ireland Networks, North Lanarkshire Council
Construction Contractor Regional Mission-Critical Engineering & Retrofit Contractors
MEP Engineering Mission-Critical Mechanical & Electrical Engineering Specialists
Network Connectivity Carrier-neutral facility with dual path-diverse subterranean dark fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), direct dark fiber links to DataVita dv1, and interconnectivity with major UK carriers (BT, Virgin Media, Neos Networks, Zayo).
Power Infrastructure Redundant commercial utility grid feeds, static N+1 uninterruptible power supply (UPS) systems, automated transfer switchgear (ATS), 208V/400V power distribution, and backup diesel generators with localized bulk fuel reserves.

Technical Specifications

HeaderDetails
Power Capacity~3.5 MVA Utility Substation Allocation
UPS RedundancyConcurrently Maintainable N+1 Static UPS Architecture
Cooling System Precision perimeter CRAH cooling units in N+1 redundancy, cold-aisle containment, air-side free cooling taking advantage of Scotland's ambient temperature, and real-time environmental monitoring.
Connectivity Ultra-low latency optical dark fiber routes linking York Road directly to Glasgow, Edinburgh, Manchester, and London telecom hubs.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix 100% Certified Renewable Energy (Sourced via local Scottish wind and hydro power purchase agreements).

Milestones

HeaderDetails
Announcement Operational Facility
Construction Start Completed / Operational
Phase 1 Go-Live Operational
Full Buildout Active Commercial Operations & Corporate HQ

Investment Details

HeaderDetails
Total Investment~$10,000,000 – $15,000,000 USD (Estimated Historical Capex & Corporate Fit-out)
Funding Corporate Capital Expenditure (DataVita Ltd)