Digital Edge Seoul Bupyeong Campus: 96MW AI-Ready Data Center in South Korea

Status: Phase 1 Operational (SEL2) / Phase 2 Under Construction (SEL3)   |   Location: Bupyeong-gu, Incheon, Greater Seoul Metropolitan Area, South Korea


Project Overview

Digital Edge’s Seoul Bupyeong Campus, comprising the SEL2 and SEL3 facilities, is the largest commercial data center campus development in South Korea and a strategic hyperscale digital infrastructure hub serving the Seoul metropolitan region. Located in Incheon’s Bupyeong district, approximately 25 kilometers from central Seoul, the campus is designed to deliver up to 96 MW of critical IT capacity, supporting the rapidly growing requirements of global hyperscale cloud providers, over-the-top (OTT) content platforms, telecommunications operators, financial institutions, and enterprises deploying artificial intelligence (AI), machine learning (ML), and high-performance computing (HPC) workloads. Engineered for next-generation computing environments, the campus offers flexible high-density rack configurations ranging from 10+ kVA to more than 50 kW per rack, with direct-to-chip liquid cooling readiness for GPU-intensive AI infrastructure. Advanced chilled-water cooling systems are designed to achieve an ultra-efficient target Power Usage Effectiveness (PUE) of approximately 1.28, delivering exceptional energy efficiency while supporting high-performance operations. As a carrier-neutral campus, SEL2 and SEL3 are interconnected through dedicated dark fiber to Digital Edge’s highly connected SEL1 facility in Seoul’s Gangnam district and provide low-latency connectivity to major domestic internet exchanges, cloud availability zones, and international subsea cable landing stations in Busan. Combined with resilient power infrastructure, advanced physical security, continuous infrastructure monitoring, and scalable deployment capabilities, the Seoul Bupyeong Campus serves as a future-ready platform for cloud expansion, AI innovation, and digital transformation across South Korea and Northeast Asia.


Quick Facts

FieldValue
Project NameDigital Edge Seoul Bupyeong Campus: 96MW AI-Ready Data Center in South Korea
LocationBupyeong-gu, Incheon, Greater Seoul Metropolitan Area, South Korea
StatusPhase 1 Operational (SEL2) / Phase 2 Under Construction (SEL3)
CommissioningSEL2 Go-Live: Q4 2024 / SEL3 Go-Live: Target Q4 2027
Total IT Load96 MW Critical IT Power Capacity Allocation (SEL2: 36 MW + SEL3: 60 MW)
Total Capacity96 MW Total Critical Power Capacity across an 85,400 m² (~919,000 sq ft) gross campus area
Tier LevelTier III Equivalent Architecture / LEED Silver Design / ISO 27001, SOC 2 Type II
Project TypePurpose-Built Greenfield Hyperscale, High-Density AI-Ready Colocation & Sovereign Cloud Hub

City Profile

HeaderDetails
City NameSeoul
Population~9.4 million (Seoul city proper)
Urban Agglomeration~26 million (Seoul Capital Area metropolitan region)
City GDP~US$400 billion
Per Capita Income~US$42,000–45,000
City TierTier 1 / Alpha Global City
Key StrengthsGlobal financial center, technology and innovation hub, headquarters of major conglomerates (Samsung, LG, Hyundai), advanced infrastructure, world-class public transportation, strong education and research institutions, vibrant culture and tourism sector

Companies Involved

HeaderDetails
Developer / Operator Digital Edge
Strategic Infrastructure Partner KEPCO (Korea Electric Power Corporation)
Construction Contractor SK ecoplant / Specialized Korean Mission-Critical General Contractors
MEP Engineering Digital Edge In-House Technical Infrastructure & DPR Construction Engineering Teams
Network Connectivity Carrier-neutral platform featuring diverse subterranean fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency optical dark fiber backhaul linking to Gangnam (SEL1), Seoul Internet exchanges (KINX, KISA), and Busan cable landing stations (PUS1).
Power Infrastructure Dual high-voltage grid feeders supplied by KEPCO, static distributed N+1 uninterruptible power supply (UPS) modules, automated switchgear, and standby emergency diesel generator arrays with multi-day on-site fuel reserves.

Technical Specifications

HeaderDetails
Power Capacity96 MW Secured Utility Power Allocation
UPS RedundancyN+1 Distributed Redundant Static UPS Architecture
Cooling System High-efficiency chilled-water precision cooling plant with free-cooling economizers, Direct-to-Chip Liquid Cooling (DLC) readiness for ultra-high-density GPU arrays, and automated BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps and cross-connect options across Korean and international fiber routes.
PUE Target < 1.28 Annualized Operational Design PUE
Energy Mix High-reliability KEPCO grid power supported by Green Loan financing structure and commitments toward certified renewable energy purchasing.

Milestones

HeaderDetails
Announcement 2022
Construction Start April 2023
Phase 1 Go-Live Operational (SEL2 - Q4 2024)
Full Buildout Active Multi-Building Campus Expansion (SEL3 RFS Q4 2027)

Investment Details

HeaderDetails
Total InvestmentEstimated $1,000,000,000+ USD Total Campus Capital Expenditure
Funding Corporate Capital Expenditure & Green Loan Debt Financing (Digital Edge / Stonepeak)