Digital Realty Lelystad Hyperscale Data Center Campus

Status: Planning / Pre-construction   |   Location: Flevokust Haven Industrial Estate, Lelystad, Netherlands


Project Overview

The Digital Realty Lelystad Data Center Campus represents a highly strategic expansion of Europe's FLAP (Frankfurt, London, Amsterdam, Paris) data center market, positioned approximately 55 kilometers east of Amsterdam in Lelystad, Netherlands. Located at the Flevokust Haven industrial estate, this massive €1.5 billion ($1.7 billion USD) hyperscale campus directly addresses the severe land and power constraints within the primary Amsterdam metropolitan market. By establishing a major footprint in Flevoland, the development extends the regional digital ecosystem outward while maintaining low-latency dark fiber connectivity to the main Amsterdam internet exchanges.  The campus layout is meticulously engineered for the next wave of artificial intelligence and cloud computing infrastructure. Comprising three specialized two-story data center buildings, the facility is structurally built with reinforced concrete and modular steel frameworks to support high-density server configurations. To handle the significant thermal footprints generated by modern GPU clusters, the data halls incorporate advanced hybrid cooling systems, combining direct-to-chip liquid cooling manifolds with high-efficiency air-cooled chillers. This mechanical design enables the campus to target an exceptionally low Power Usage Effectiveness (PUE) of 1.18, aligning with strict Dutch and European environmental standards.  


Quick Facts

FieldValue
Project NameDigital Realty Lelystad Hyperscale Data Center Campus
LocationFlevokust Haven Industrial Estate, Lelystad, Netherlands
StatusPlanning / Pre-construction
CommissioningQ4 2027 (Phase 1 Go-Live)
Total IT Load120 MW
Total Capacity150 MW
Tier LevelTier III Compliant
Project TypeHyperscale / AI-Ready Colocation Campus

City Profile

HeaderDetails
City NameLelystad
Population~83,000
Urban Agglomeration~120,000 (Regional)
City GDPHigh growth (Regional part of €900B+ Dutch GDP)
Per Capita Income~€42,000
City TierTier 2 (European Strategic Logistics Hub)
Key StrengthsCoastal cooling, grid proximity, land availability

Companies Involved

HeaderDetails
Developer / Operator Digital Realty
Strategic Infrastructure Partner TenneT (Transmission System Operator) & Liander
Construction Contractor To be finalized (Top-tier European Data Center GC)
MEP Engineering To be finalized (Specialized European MEP Consultant)
Network Connectivity Eurofiber, Relined, Diverse Trans-Netherlands Fiber Rings
Power Infrastructure NA

Technical Specifications

HeaderDetails
Power Capacity150 MW Total Substation Allocation
UPS RedundancyDistributed Reserve (Catcher) Configuration
Cooling System Hybrid direct-to-chip liquid cooling and air-cooled chillers
Connectivity Carrier-neutral, direct low-latency links to AMS-IX and NL-IX
PUE Target 1.18
Energy Mix 100% Renewable Energy (Offshore Wind and Solar PPAs)

Milestones

HeaderDetails
Announcement Q4 2025
Construction Start Q2 2026
Phase 1 Go-Live Q4 2027
Full Buildout Q4 2029

Investment Details

HeaderDetails
Total Investment€1,500,000,000 ($1.7 Billion USD)
Funding Corporate Capital Expenditure & Infrastructure Investment Funds