Digital Realty Toronto North Expansion: 54MW Hyperscale & Enterprise Hub

Status: Fully Operational Hub with Active Expansion   |   Location: 1 Century Place, Vaughan, ON L4L 8R2, Canada


Project Overview

Digital Realty Toronto North Expansion (TOR1 / YYZ11) is a flagship 54 MW hyperscale-ready data center campus strategically located in Vaughan, Ontario, within the rapidly growing Greater Toronto Area, one of Canada's most important digital infrastructure and cloud connectivity markets. Developed through the redevelopment of a 711,000-square-foot former commercial printing facility, the campus has been purpose-built to support the next generation of cloud computing, artificial intelligence (AI), machine learning, enterprise IT, and high-performance computing (HPC) workloads. The facility incorporates 17 large-scale, high-density computer rooms engineered to accommodate rack power densities exceeding 30 kW per rack, providing customers with the flexibility to deploy both traditional enterprise infrastructure and advanced GPU-intensive AI clusters. As part of Digital Realty's PlatformDIGITAL® global data center ecosystem, TOR1 delivers seamless access to a highly connected digital infrastructure platform while offering direct, low-latency connectivity to Toronto's primary carrier hotel at 151 Front Street West (YYZ12), multiple cloud on-ramps, leading network service providers, internet exchanges, and enterprise ecosystems. The campus has been designed with a strong emphasis on operational efficiency and sustainability, utilizing advanced waterless indirect economizer cooling technology that significantly reduces water consumption while maintaining reliable thermal performance throughout Canada's varying climate conditions. Highly efficient electrical and mechanical systems enable the facility to achieve an impressive annualized Power Usage Effectiveness (PUE) of approximately 1.25, lowering operational costs and environmental impact. Supported by redundant utility infrastructure, scalable power distribution, resilient backup systems, and enterprise-grade physical and digital security, Digital Realty Toronto North Expansion serves as a critical digital infrastructure hub for hyperscale cloud providers, SaaS companies, financial institutions, content delivery networks, and multinational enterprises seeking secure, scalable, and future-ready colocation capacity in Canada's largest metropolitan market.


Quick Facts

FieldValue
Project NameDigital Realty Toronto North Expansion: 54MW Hyperscale & Enterprise Hub
Location1 Century Place, Vaughan, ON L4L 8R2, Canada
StatusFully Operational Hub with Active Expansion
CommissioningOperational / Phased Expansion Active
Total IT Load54 MW Critical IT Power Capacity Allocation
Total Capacity54 MW Critical IT Power across 711,000 sq ft (~66,050 m²) total facility space (17 computer rooms)
Tier LevelTier III Certified Standards / LEED Silver Certified / ISO 27001, ISO 14001, SOC 1, 2 & 3, PCI-DSS Compliant
Project TypeRetrofit Purpose-Built Hyperscale, High-Density Colocation & Cloud Interconnection Hub

City Profile

HeaderDetails
City NameToronto (Greater Area)
Population~2.8 Million (City)
Urban Agglomeration~6.7 Million (GTA)
City GDP~$450 Billion CAD
Per Capita Income~$65,000 CAD
City TierGlobal Tier 1 Hub
Key StrengthsFinancial Capital, AI Research (Vector Institute), Tech Talent

Companies Involved

HeaderDetails
Developer / Operator Digital Realty
Strategic Infrastructure Partner Alectra Utilities / Hydro One Utility Network & City of Vaughan Municipal Authorities
Construction Contractor Specialized Canadian Mission-Critical General Contractors
MEP Engineering Digital Realty Global Critical Infrastructure & Engineering Teams
Network Connectivity Carrier-neutral platform featuring subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency dark fiber backhaul to 151 Front Street West (YYZ12), major regional IXPs, and cloud express on-ramps.
Power Infrastructure Dual high-voltage grid utility connections, N+1 rotary (flywheel) and static uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt standby emergency diesel generator arrays with on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity54 MW Secured Critical IT Power Allocation
UPS RedundancyN+1 Redundant UPS Architecture
Cooling System High-efficiency N+1 air-cooled chilled-water systems with waterless economization, high-density airflow management, Direct-to-Chip Liquid Cooling (DLC) readiness, and automated BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps (AWS, Azure, IBM Cloud Direct Link 2.0) and cross-connect options across North American fiber corridors via PlatformDIGITAL®.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix High-efficiency regional grid power mix supplemented by carbon-free energy options and corporate PPAs.

Milestones

HeaderDetails
Announcement 2017–2018
Construction Start 2018
Phase 1 Go-Live Operational (2019)
Full Buildout Operational Active Facility with Phased Expansion

Investment Details

HeaderDetails
Total InvestmentEstimated $300,000,000 USD to $450,000,000 USD Cumulative Capital Expenditure
Funding Corporate Capital Expenditure & Infrastructure Financing by Digital Realty

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.