Digital Edge EEC Hyperscale Data Center Campus (JV with B. Grimm)

Status: Under Construction (Greenfield Project)   |   Location: Eastern Economic Corridor (EEC), Chon Buri Province, Thailand


Project Overview

The Digital Edge EEC Hyperscale Campus is a significant landmark project resulting from a strategic joint venture between Digital Edge, a major pan-Asian data center platform, and B. Grimm Power, one of Thailand's largest private power producers. This collaboration is a direct response to the surge in demand from global hyperscale cloud providers and the accelerating adoption of AI workloads across Southeast Asia.

The flagship project is a 100 MW greenfield facility located in Thailand's Eastern Economic Corridor (EEC), approximately 100 kilometers from Bangkok. The EEC has been designated by the Thai government as a primary zone for digital and technological investment, offering substantial incentives to attract projects of this scale. The estimated total investment for this 100MW facility is around US$1 billion. The campus is explicitly designed to be AI-ready, featuring infrastructure that supports high-density power consumption and incorporating the capability for liquid-cooling systems—essential for efficiently managing the heat generated by the latest generations of AI processors and accelerated computing.

The strategic importance of the partnership with B. Grimm Power cannot be overstated. By combining Digital Edge's cutting-edge data center design and operational expertise with B. Grimm's deep experience in power generation, land bank management, and sustainable energy solutions, the project secures a reliable and scalable power supply. The facility is committed to being powered by sustainable energy, leveraging B. Grimm's robust portfolio of renewable energy assets. With a target Ready for Service (RFS) date in Q4 2026, this campus is poised to become a vital anchor for global tech players, solidifying Thailand's ambition to transform into a key regional AI and cloud innovation hub and a major destination for sovereign AI initiatives. The success of this project is expected to pave the way for an additional 200 MW of capacity, demonstrating the long-term commitment to high-growth, high-capacity digital infrastructure in the region.


Quick Facts

FieldValue
Project NameDigital Edge EEC Hyperscale Data Center Campus (JV with B. Grimm)
LocationEastern Economic Corridor (EEC), Chon Buri Province, Thailand
StatusUnder Construction (Greenfield Project)
CommissioningQ4 2026 (Target RFS - Ready for Service)
Total IT Load100 MW (Flagship Project Total Capacity)
Total CapacityHigh-density colocation, tailored for hyperscalers and AI workloads.
Tier LevelDesigned to Tier III/IV capable standards for high availability.
Project TypeHyperscale Colocation / AI-Ready Campus

City Profile

HeaderDetails
City NameEastern Economic Corridor (EEC), Chon Buri Province, Thailand
PopulationApprox. 1.7 million (Chon Buri)
Urban AgglomerationN/A (Focused on industrial corridor)
City GDPN/A (EEC is an industrial/economic development zone)
Per Capita IncomeN/A
City TierMajor Industrial/Economic Corridor, Emerging Regional Tech Hub
Key StrengthsGovernment incentives (BOI/EEC), proximity to Bangkok, large industrial land banks, and robust power infrastructure due to existing industrial facilities.

Companies Involved

HeaderDetails
Developer / Operator Digital Edge DC (Joint Venture of Digital Edge and B. Grimm Power)
Strategic Infrastructure Partner B. Grimm Power Public Company Limited (Major Thai energy producer)
Construction Contractor Details not explicitly public
MEP Engineering Designed for high-density power requirements (AI workloads) and efficiency.
Network Connectivity High-speed interconnectivity for hybrid cloud solutions; positioned to support Thailand's regional digital hub ambition.
Power Infrastructure Leveraging B. Grimm Power's expertise and portfolio of power assets to ensure secure, high-capacity supply.

Technical Specifications

HeaderDetails
Power Capacity100 MW (IT Load for the flagship campus).
UPS RedundancyHigh-redundancy design to meet global hyperscale standards.
Cooling System Features planned support for liquid-cooling systems to manage extreme heat from AI and high-density computing.
Connectivity Part of a larger regional push for improved digital infrastructure in Southeast Asia.
PUE Target Focused on high efficiency/sustainability (as a "greenfield" project).
Energy Mix Will be powered by sustainable energy, leveraging B. Grimm Power's extensive portfolio of combined cycle co-generation and renewable energy assets.

Milestones

HeaderDetails
Announcement June 2025 (Initial Joint Venture Announcement)
Construction Start Fast-tracked to meet urgent needs.
Phase 1 Go-Live Flagship 100MW project is the first phase; B. Grimm is studying plans for an additional 200MW capacity.
Full Buildout The partnership aims to develop multiple next-generation hyperscale and AI-ready data center campuses across Thailand.

Investment Details

HeaderDetails
Total InvestmentUS$1 Billion (Approximate cost for the 100MW flagship project).
Funding Joint Venture (Digital Edge is backed by global infrastructure investor Stonepeak).