EcoDataCenter Stockholm Hyperscale Campus: 80MW Sustainable AI Hub in Sweden

Status: Active Development / Phased Buildout   |   Location: Greater Stockholm Region, Sweden


Project Overview

EcoDataCenter’s Stockholm Hyperscale Campus is a flagship sustainable data center development designed to support the growing demands of international hyperscale cloud providers, artificial intelligence (AI), high-performance computing (HPC), enterprise platforms, and data-intensive digital services. Constructed using a combination of sustainable cross-laminated timber (CLT) framing and reinforced structural concrete, the campus demonstrates a strong commitment to environmentally responsible infrastructure while maintaining the durability and resilience required for mission-critical operations. Powered entirely by Sweden’s 100% renewable electricity grid, the facility significantly reduces carbon emissions and supports customers pursuing ambitious sustainability and ESG objectives. Engineered with an ultra-low target Power Usage Effectiveness (PUE) of less than 1.15, the campus utilizes advanced free-cooling technologies that take advantage of Sweden’s naturally cool climate to maximize energy efficiency and minimize mechanical cooling requirements. The infrastructure is also designed with liquid cooling readiness to accommodate high-density GPU clusters used for AI training, machine learning, and next-generation compute workloads. Waste heat generated by the facility is captured and exported to local municipal district heating networks, transforming excess energy into a valuable community resource and contributing to a net climate-positive operational footprint. Combined with resilient power infrastructure, carrier-neutral connectivity, advanced physical security, and scalable deployment options, EcoDataCenter’s Stockholm Hyperscale Campus provides a future-ready platform for sustainable cloud expansion, AI innovation, and digital transformation across the Nordic region and Europe.


Quick Facts

FieldValue
Project NameEcoDataCenter Stockholm Hyperscale Campus: 80MW Sustainable AI Hub in Sweden
LocationGreater Stockholm Region, Sweden
StatusActive Development / Phased Buildout
CommissioningPhase 1 Go-Live: 2025–2026 / Multi-Phase Expansion
Total IT Load80 MW Critical IT Power Capacity Allocation
Total Capacity80 MW Total IT Power Capacity across a purpose-built multi-building campus
Tier LevelTier III Certified Design Architecture / ISO 27001, ISO 14001, ISO 9001, ISO 50001 Certified
Project TypeClimate-Positive Greenfield Hyperscale, High-Density AI Colocation & Nordic Cloud Hub

City Profile

HeaderDetails
City NameStockholm
Population~1.0 million
Urban Agglomeration~2.5 million (Greater Stockholm)
City GDP~USD 210 billion (Greater Stockholm economy)
Per Capita Income~USD 75,000
City TierTier 1 – Nordic Technology, Financial & Digital Infrastructure Hub
Key StrengthsCapital and largest city of Sweden; leading Nordic financial and technology center; strong AI, fintech, gaming, and telecommunications ecosystem; expanding hyperscale and colocation data center market; abundant renewable energy; advanced fiber connectivity; highly skilled workforce; world-class universities; business-friendly environment; gateway to the Nordic and Baltic regions.

Companies Involved

HeaderDetails
Developer / Operator EcoDataCenter
Strategic Infrastructure Partner Vattenfall / Ellevio (Power Grid Utility) & Local Municipal District Heating Partners
Construction Contractor Specialized Nordic Mission-Critical EPC Contractors & Mass-Timber Specialists
MEP Engineering EcoDataCenter In-House Technical Infrastructure & Engineering Teams
Network Connectivity Carrier-neutral platform featuring subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency optical dark fiber connection to Stockholm carrier hotels, Netnod (Sweden's main Internet Exchange), and Nordic subsea cable landing networks.
Power Infrastructure Dual high-voltage 110kV grid connections supplied by Vattenfall/Ellevio, static distributed 2N / N+1 uninterruptible power supply (UPS) modules, automated switchgear, and backup generator systems running on Hydrotreated Vegetable Oil (HVO) renewable biofuel.

Technical Specifications

HeaderDetails
Power Capacity80 MW Secured Utility Power Allocation
UPS Redundancy2N / N+1 Distributed Redundant Static UPS Architecture
Cooling System Direct and indirect free-cooling evaporative economizers, Direct-to-Chip Liquid Cooling (DLC) readiness supporting 100+ kW per rack, and waste heat recovery systems exporting thermal energy to municipal district heating networks.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps and cross-connect options across Nordic, European, and transatlantic fiber routes.
PUE Target < 1.15 Annualized Operational Design PUE
Energy Mix 100% Certified Carbon-Free Renewable Energy (Hydroelectric & Wind Power).

Milestones

HeaderDetails
Announcement 2023–2024
Construction Start 2024
Phase 1 Go-Live Target 2025–2026
Full Buildout Active Multi-Building Campus Development

Investment Details

HeaderDetails
Total InvestmentEstimated €400,000,000 EUR to €600,000,000 EUR Campus Capital Expenditure
Funding Corporate Capital Expenditure & Infrastructure Equity Financing by EcoDataCenter / Areim

Stay Ahead in the Data Center World