Status: Under Construction / Master Development | Location: 8001 Wolf Ln / 6682 FM535, Cedar Creek, TX 78612, USA
The EdgeConneX Cedar Creek Campus, located at 8001 Wolf Lane and 6682 FM535 in Cedar Creek, Texas, represents a major hyperscale data center development serving the rapidly expanding Greater Austin technology corridor. Spanning approximately 180 acres, the campus is engineered to support up to 240 megawatts of critical IT capacity across multiple high-density facilities, including AUS01, AUS02, EDCAUS11, and EDCAUS12. Collectively encompassing more than 920,000 square feet of multi-story hardened concrete infrastructure, the development is designed to accommodate advanced cloud computing, artificial intelligence, high-performance computing, and other demanding digital workloads. Utility power is supplied through dedicated high-voltage substation infrastructure integrated with the Bluebonnet Electric Cooperative network and the broader ERCOT power grid, providing substantial electrical capacity for large-scale operations. Concurrently maintainable N+1 uninterruptible power supply systems provide resilient backup protection, while dedicated standby diesel emergency generators equipped with multi-day fuel reserves support continuity during extended utility disruptions. The campus is engineered with liquid-cooling readiness for high-density computing environments, including deployments exceeding 100 kilowatts per rack. Closed-loop, water-free cooling systems help manage the substantial thermal loads generated by advanced AI and accelerated computing equipment while minimizing water consumption and supporting efficient facility operations. Its strategic location near Austin-Bergstrom International Airport also provides access to important transportation, telecommunications, and technology infrastructure. As a regional interconnection gateway, EdgeConneX Cedar Creek features diverse subterranean dark fiber pathways that provide resilient connectivity to major cloud providers, telecommunications carriers, regional carrier hotels, and broader network ecosystems. By combining large-scale land availability, significant power capacity, liquid-cooling readiness, resilient electrical infrastructure, and extensive fiber connectivity, the Cedar Creek campus is positioned as a major digital infrastructure hub supporting the continued growth of hyperscale cloud and AI workloads throughout the Austin and Central Texas markets.
| Field | Value |
|---|---|
| Project Name | EdgeConneX Cedar Creek Campus 240MW Data Center |
| Location | 8001 Wolf Ln / 6682 FM535, Cedar Creek, TX 78612, USA |
| Status | Under Construction / Master Development |
| Project Type | Hyperscale Campus, High-Density AI Infrastructure Hub & Enterprise Colocation |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Cedar Creek |
| Population | 4,440 (2024 ACS 5 year estimate) |
| Urban Agglomeration | Approximately 2.3 million, Austin Round Rock San Marcos metropolitan area |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.