Status: Under Construction / Master Development | Location: Farm to Market Road 2720, Uhland, TX 78640, USA
The Caldwell Valley Technology Park, located along Farm to Market Road 2720 in Uhland, Texas, represents a master-planned hyperscale and artificial intelligence data center development by Tract, positioned within Caldwell County along the rapidly expanding Austin-San Antonio technology corridor. Spanning more than 600 acres, the development is planned to accommodate up to 600 megawatts of critical IT capacity across multiple build-to-suit hyperscale data center facilities, creating substantial room for phased expansion and next-generation computing deployments. Its strategic location provides access to the major technology markets of Austin and San Antonio while offering the land availability and infrastructure required for large-scale digital development. Utility power distribution is anchored by dedicated high-voltage substation infrastructure integrated with the ERCOT transmission grid, providing the electrical foundation required for energy-intensive AI and cloud computing operations. Static uninterruptible power supply configurations provide backup protection for critical equipment, while standby emergency diesel generator systems equipped with multi-day onsite fuel reserves are designed to support operational continuity during utility disruptions. The campus is engineered to accommodate ultra-high-density server architectures and advanced accelerated computing workloads. Its cooling strategy incorporates zero-water evaporative designs and direct-to-chip liquid cooling capabilities, helping reduce water consumption while efficiently managing the thermal loads generated by dense AI and high-performance computing environments. Connectivity infrastructure further enhances the site's strategic value, with diverse subterranean dark fiber pathways designed to provide resilient, low-latency connections to Central Texas internet exchanges, cloud availability zones, regional technology hubs, and national fiber networks. By combining substantial land resources, significant planned power capacity, advanced cooling technologies, resilient utility infrastructure, and extensive telecommunications connectivity, Caldwell Valley Technology Park is positioned as a major digital infrastructure platform capable of supporting the continued expansion of hyperscale cloud services, artificial intelligence, and high-performance computing across the Central Texas market.
| Field | Value |
|---|---|
| Project Name | Tract Caldwell Valley Technology Park Uhland 600MW Data Center Campus |
| Location | Farm to Market Road 2720, Uhland, TX 78640, USA |
| Status | Under Construction / Master Development |
| Project Type | Hyperscale Master-Planned Campus, AI Infrastructure Hub & Wholesale Land Campus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Texas |
| Population | ~30.5 million (2025 est.) |
| Urban Agglomeration | ~27–28 million (major metro clusters combined) |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.