EdgeCore DFW02 Dallas Hyperscale Campus: 216MW AI-Ready Data Center

Status: Under Construction / Active Phase 1 Development   |   Location: Mesquite, Dallas County, Texas 75149, United States


Project Overview

EdgeCore Digital Infrastructure’s DFW02 Hyperscale Campus in Mesquite, Texas, is a next-generation hyperscale data center development designed to meet the rapidly growing demands of global cloud providers, large digital enterprises, telecommunications operators, and artificial intelligence (AI) and machine learning (ML) workloads. Delivering up to 216 MW of critical IT capacity across a multi-building campus, DFW02 is strategically located within the Dallas–Fort Worth metroplex, one of North America’s largest and fastest-growing data center markets, offering exceptional power availability, connectivity, and long-term expansion opportunities. The campus is engineered to support high-density computing environments with custom rack configurations exceeding 70 kW per rack, making it ideal for GPU-intensive AI training, high-performance computing (HPC), and large-scale cloud infrastructure. To maximize operational efficiency and sustainability, the facility incorporates advanced closed-loop waterless cooling technology, reducing water consumption while maintaining optimal thermal performance for next-generation compute environments. Highly resilient 2N electrical architecture and redundant mechanical systems provide continuous availability for mission-critical operations. As a carrier-neutral campus, DFW02 offers path-diverse optical fiber connectivity to Dallas’s primary carrier hotels, cloud express gateways, and major regional network exchanges, enabling low-latency access to cloud platforms and global digital ecosystems. Combined with advanced physical security, continuous infrastructure monitoring, and scalable deployment options, DFW02 provides a future-ready foundation for cloud expansion, AI innovation, and enterprise digital transformation across North America.


Quick Facts

FieldValue
Project NameEdgeCore DFW02 Dallas Hyperscale Campus: 216MW AI-Ready Data Center
LocationMesquite, Dallas County, Texas 75149, United States
StatusUnder Construction / Active Phase 1 Development
CommissioningPhase 1 Go-Live: 2025–2026 / Multi-Building Campus Buildout
Total IT Load216 MW Critical IT Power Capacity Allocation
Total Capacity216 MW Total IT Power Capacity across a 1,000,000+ sq ft (~93,000 m²) multi-building campus footprint
Tier LevelTier III Certified Architecture / ISO 27001, SOC 2 Type II, PCI-DSS
Project TypePurpose-Built Greenfield Hyperscale, High-Density AI-Ready Colocation & Enterprise Cloud Hub

City Profile

HeaderDetails
City NameTexas
Population~30.5 million (2025 est.)
Urban Agglomeration~27–28 million (major metro clusters combined)
City GDP~$2.4 trillion (2024 est., comparable to G7 economies)
Per Capita Income~$78,000
City TierTier 1 (Global Economic Powerhouse)
Key StrengthsEnergy (oil, gas, renewables), Data Centers & AI Infrastructure, Technology (Austin hub), Logistics & Trade (US–Mexico corridor), Manufacturing, Business-friendly policies, Large land & power availability

Companies Involved

HeaderDetails
Developer / Operator EdgeCore Digital Infrastructure
Strategic Infrastructure Partner Oncor Electric Delivery (Texas Power Grid Utility) & ERCOT
Construction Contractor Specialized US Mission-Critical EPC Contractors
MEP Engineering EdgeCore In-House Global Technical Infrastructure & Critical Facilities Engineering Teams
Network Connectivity Carrier-neutral platform with dual subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency dark fiber backhaul to major Dallas network hubs (such as 1950 Stemmons Freeway / Infomart) and global cloud express on-ramps.
Power Infrastructure Dedicated high-voltage utility substation fed by Oncor Electric Delivery, static distributed 2N / N+1 uninterruptible power supply (UPS) system architecture, automated switchgear, and standby emergency diesel generator plants with multi-day on-site fuel reserves.

Technical Specifications

HeaderDetails
Power Capacity216 MW Secured Utility Power Allocation
UPS Redundancy2N / N+1 Distributed Redundant Static UPS Architecture
Cooling System Ultra-efficient closed-loop air-cooled chiller plant requiring zero water consumption for cooling, Direct-to-Chip Liquid Cooling (DLC) readiness for high-density AI clusters, and automated BMS environmental controls.
Connectivity Carrier-neutral access offering direct low-latency cloud express on-ramps and cross-connect options across North American fiber corridors.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix High-reliability ERCOT grid power integrated with options for renewable energy certificates (RECs) and Texas wind/solar Power Purchase Agreements (PPAs).

Milestones

HeaderDetails
Announcement 2023
Construction Start 2024
Phase 1 Go-Live Target 2025–2026
Full Buildout Active Multi-Building Campus Expansion

Investment Details

HeaderDetails
Total InvestmentEstimated $1,500,000,000+ USD Total Campus Capital Expenditure
Funding Corporate Capital Expenditure & Infrastructure Equity Financing by EdgeCore / Partners Group