EdgeCore Dulles Hyperscale Project Virginia Funding $1.5B

Status: Active Construction Underway   |   Location: Dulles Technology Corridor, Sterling


Project Overview

EdgeCore Digital Infrastructure's newly funded expansion in Northern Virginia marks a critical high-density addition to the world's largest data center market outside India. Backed by the successful completion of two major financial transactions totaling $1.5 billion, the project focuses on the construction of two massive single-tenant hyperscale data centers tailored for elite tech firms. Positioned directly in the hyper-competitive Dulles technology ecosystem, this development bypasses local market capacity crunches by utilizing fully structured, front-end capital allocations to secure immediate specialized component pipelines. The campus layout is optimized specifically to host high-density graphics processing unit (GPU) arrays, providing modern cloud platforms with a highly reliable framework capable of scaling intense machine learning and data inference models.


Quick Facts

FieldValue
Project NameEdgeCore Dulles Hyperscale Project Virginia Funding $1.5B
LocationDulles Technology Corridor, Sterling
StatusActive Construction Underway
CommissioningPhase 1 Initial Capacity Delivery Target Set for Early 2027
Total IT Load120 MW
Total Capacity160 MW Gross Substation Allocated Footprint
Tier LevelTier III Standard Equivalent (Concurrently Maintainable Architecture)
Project TypeSingle-Tenant Hyperscale AI & Cloud Deployment Campus

City Profile

HeaderDetails
City NameSterling
Population~31,000
Urban Agglomeration~420,000 (part of the Washington metropolitan area)
City GDP~USD 18 billion (estimated local economy contribution)
Per Capita Income~USD 62,000 annually
City TierTier 3 City (major suburban commercial and technology center)
Key StrengthsProximity to Washington D.C., data centers, technology services, logistics, strong transportation access, Dulles International Airport connectivity, business parks, high household income

Companies Involved

HeaderDetails
Developer / Operator EdgeCore Digital Infrastructure
Strategic Infrastructure Partner Global institutional infrastructure investors & Green financing syndicates
Construction Contractor Leading East Coast mission-critical general contracting corporations
MEP Engineering Specialized mission-critical consultants focused on high-density electrical design
Network Connectivity Direct cross-connects into the primary Northern Virginia dark fiber exchange rings
Power Infrastructure NA

Technical Specifications

HeaderDetails
Power Capacity160 MW gross footprint capacity delivered via specialized heavy utility interconnections
UPS Redundancy$N+1$ and distributed redundant block topologies designed for zero application interruption
Cooling System Closed-loop high-density direct liquid cooling paired with advanced ultra-low water use chiller structures
Connectivity Ultra-connected, carrier-neutral framework featuring isolated entry vaults and twin MMRs
PUE Target Highly optimized sub-1.18 design target matching modern enterprise ESG criteria
Energy Mix Supplemented via local utility green energy options and regional renewable credit integration

Milestones

HeaderDetails
Announcement May 2026 financial transactions finalized
Construction Start Foundations and structural phase civil works actively underway
Phase 1 Go-Live Structural commissioning target established for early 2027
Full Buildout Comprehensive execution and twin-facility occupancy scheduled by late 2028

Investment Details

HeaderDetails
Total Investment$1,500,000,000 USD
Funding Secured through structured single-tenant infrastructure debt facilities and specialized capital options