kevin o'leary Digital Stratos Hyperscale Data Center
Status: Active Master Planning / Architectural Phase | Location: Box Elder County, Utah, United States
Project Overview
Officially revealed through architectural master plans, the Stratos Hyperscale Data Center represents one of the largest planned mission-critical infrastructure projects in global history. Commissioned by Kevin O'Leary Digital, the development sits on a massive parcel designated by Utah’s governmental Military Installation Development Authority (MIDA). The master layout features 60 individual data center buildings organized into six distinct multi-facility clusters. The campus is engineered from the ground up to address the national security imperative for high-performance computing supremacy, functioning as a distributed "AI factory" optimized for sovereign large language model (LLM) training and hyperscale cloud workloads. Positioned outside India, this gigascale footprint establishes a massive computing ecosystem designed to bypass traditional municipal grid blockages through independent infrastructure master planning.
Quick Facts
| Field | Value |
| Project Name | kevin o'leary Digital Stratos Hyperscale Data Center |
| Location | Box Elder County, Utah, United States |
| Status | Active Master Planning / Architectural Phase |
| Commissioning | Phased infrastructure rollouts scheduled to commence initial power-up blocks by 2028 |
| Total IT Load | 5.5 GW |
| Total Capacity | 7.5 GW (Gigawatts) Maximum Allocated Campus Footprint |
| Tier Level | Tier III Standard Equivalent (Concurrently Maintainable Framework) |
| Project Type | Gigascale Sovereign-Focused AI Factory & Innovation Campus |
City Profile
| Header | Details |
| City Name | Box Elder County |
| Population | ~58,000 |
| Urban Agglomeration | ~65,000 |
| City GDP | Approx. USD 2.5–3 Billion |
| Per Capita Income | Approx. USD 30,000 |
| City Tier | Tier 3 |
| Key Strengths | Aerospace & defense manufacturing, agriculture, logistics & transportation, food processing, proximity to Salt Lake City, strong industrial base |
Companies Involved
| Header | Details |
| Developer / Operator | O'Leary Digital |
| Strategic Infrastructure Partner | Utah Military Installation Development Authority (MIDA) & Nvidia |
| Construction Contractor | Gensler (Lead Master Plan & Conceptual Design Architecture Studio) |
| MEP Engineering | AdkinsRealis (Infrastructural engineering and power-system design integration) |
| Network Connectivity | Multi-path long-haul dark fiber highways syncing directly to major US transcontinental exchange backbones |
| Power Infrastructure | NA |
Technical Specifications
| Header | Details |
| Power Capacity | 7.5 Gigawatts (GW) gross campus-wide electrical capacity allocation |
| UPS Redundancy | Distributed block redundant configurations integrated with localized energy storage systems |
| Cooling System | Advanced liquid-cooling loops paired with deep overhang architectural thermal barriers |
| Connectivity | Carrier-neutral architecture utilizing multi-point isolated sub-surface fiber entries |
| PUE Target | Sub-1.15 annualized hyperscale efficiency target |
| Energy Mix | Planned integration of massive on-site solar arrays combined with explored deployment of clean, firm on-site nuclear energy plants |
Milestones
| Header | Details |
| Announcement | May 2026 official architectural design and master plan unveiling |
| Construction Start | Phase 1 baseline site preparation and engineering scheduled for 2027 |
| Phase 1 Go-Live | First cluster initialization target set for 2028 |
| Full Buildout | Long-term multi-phase deployment extending incrementally through 2035 |
Investment Details
| Header | Details |
| Total Investment | Multi-billion-dollar long-term master development financial layout |
| Funding | Structured through institutional private equity, infrastructure investment syndicates, and specialized capital funds |