kevin o'leary Digital Stratos Hyperscale Data Center

Status: Active Master Planning / Architectural Phase   |   Location: Box Elder County, Utah, United States


Project Overview

Officially revealed through architectural master plans, the Stratos Hyperscale Data Center represents one of the largest planned mission-critical infrastructure projects in global history. Commissioned by Kevin O'Leary Digital, the development sits on a massive parcel designated by Utah’s governmental Military Installation Development Authority (MIDA). The master layout features 60 individual data center buildings organized into six distinct multi-facility clusters. The campus is engineered from the ground up to address the national security imperative for high-performance computing supremacy, functioning as a distributed "AI factory" optimized for sovereign large language model (LLM) training and hyperscale cloud workloads. Positioned outside India, this gigascale footprint establishes a massive computing ecosystem designed to bypass traditional municipal grid blockages through independent infrastructure master planning.


Quick Facts

FieldValue
Project Namekevin o'leary Digital Stratos Hyperscale Data Center
LocationBox Elder County, Utah, United States
StatusActive Master Planning / Architectural Phase
CommissioningPhased infrastructure rollouts scheduled to commence initial power-up blocks by 2028
Total IT Load5.5 GW
Total Capacity7.5 GW (Gigawatts) Maximum Allocated Campus Footprint
Tier LevelTier III Standard Equivalent (Concurrently Maintainable Framework)
Project TypeGigascale Sovereign-Focused AI Factory & Innovation Campus

City Profile

HeaderDetails
City NameBox Elder County
Population~58,000
Urban Agglomeration~65,000
City GDPApprox. USD 2.5–3 Billion
Per Capita IncomeApprox. USD 30,000
City TierTier 3
Key StrengthsAerospace & defense manufacturing, agriculture, logistics & transportation, food processing, proximity to Salt Lake City, strong industrial base

Companies Involved

HeaderDetails
Developer / Operator O'Leary Digital
Strategic Infrastructure Partner Utah Military Installation Development Authority (MIDA) & Nvidia
Construction Contractor Gensler (Lead Master Plan & Conceptual Design Architecture Studio)
MEP Engineering AdkinsRealis (Infrastructural engineering and power-system design integration)
Network Connectivity Multi-path long-haul dark fiber highways syncing directly to major US transcontinental exchange backbones
Power Infrastructure NA

Technical Specifications

HeaderDetails
Power Capacity7.5 Gigawatts (GW) gross campus-wide electrical capacity allocation
UPS RedundancyDistributed block redundant configurations integrated with localized energy storage systems
Cooling System Advanced liquid-cooling loops paired with deep overhang architectural thermal barriers
Connectivity Carrier-neutral architecture utilizing multi-point isolated sub-surface fiber entries
PUE Target Sub-1.15 annualized hyperscale efficiency target
Energy Mix Planned integration of massive on-site solar arrays combined with explored deployment of clean, firm on-site nuclear energy plants

Milestones

HeaderDetails
Announcement May 2026 official architectural design and master plan unveiling
Construction Start Phase 1 baseline site preparation and engineering scheduled for 2027
Phase 1 Go-Live First cluster initialization target set for 2028
Full Buildout Long-term multi-phase deployment extending incrementally through 2035

Investment Details

HeaderDetails
Total InvestmentMulti-billion-dollar long-term master development financial layout
Funding Structured through institutional private equity, infrastructure investment syndicates, and specialized capital funds

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.

Submit