EdgeCore Mesa North: 450MW AI-Ready Data Center Mesa AZ

Status: Operating / Expanding (Revised Site Plan submitted March 2026)   |   Location: Elliot Tech CorridoR, Mesa, Arizona


Project Overview

As of March 2026, EdgeCore is refining its Mesa North footprint to balance hyperscale growth with regional infrastructure needs. Following a March 11, 2026 hearing, EdgeCore scaled back its expansion from three to two buildings (totaling 1.24 million sq. ft.) to accommodate an expanded Salt River Project (SRP) substation required for the area's power grid. This campus is specifically engineered for the "AI Supercycle," featuring Direct-to-Chip (DTC) liquid cooling as a baseline requirement. A standout technical feature is the ultra-efficient closed-loop chilled water system, which maintains a water usage effectiveness (WUE) of less than 0.01 L/kWh, effectively making the site water-neutral. The project is funded through a $1.9 billion Green Loan, the largest in Partners Group’s history, contingent on meeting strict sustainability and energy efficiency targets. Once complete, the campus will support over 450 MW of critical load, solidifying Mesa as a premier hub for AI inference and training.


Quick Facts

FieldValue
Project NameEdgeCore Mesa North: 450MW AI-Ready Data Center Mesa AZ
LocationElliot Tech CorridoR, Mesa, Arizona
StatusOperating / Expanding (Revised Site Plan submitted March 2026)
CommissioningPH01: Operational; PH02/PH03: 2025/2026; Expansion: Phased post-2026
Total IT Load450 MW (Full Build-out Capacity)
Total Capacity~3.1 Million sq. ft. across multiple buildings
Tier LevelTier III (LEED Designed / Green Globes Certified)
Project TypeHyperscale & AI-Ready Colocation

City Profile

HeaderDetails
City NameMesa (East Valley)
Population~512,000
Urban Agglomeration~4,900,000 (part of the Phoenix–Mesa–Scottsdale metro area)
City GDP~USD 30–35 Billion (estimated economic output within Mesa area)
Per Capita Income~USD 36,000
City TierTier 2 U.S. Technology & Suburban Economic Hub
Key StrengthsAerospace manufacturing, semiconductor ecosystem, data centers, healthcare services, higher education, logistics, tourism, proximity to Phoenix tech corridor

Companies Involved

HeaderDetails
Developer / Operator EdgeCore Digital Infrastructure
Strategic Infrastructure Partner City of Mesa / Salt River Project (SRP).
Construction Contractor Regional Hyperscale Specialists (Fast-track development).
MEP Engineering EPS Group / EdgeCore Global Engineering.
Network Connectivity Carrier-neutral; multiple fiber entry points; dense connectivity.
Power Infrastructure 336 MVA on-site substation (expanding to 450MW+ via SRP partnership).

Technical Specifications

HeaderDetails
Power Capacity450 MW (Full Build-out)
UPS Redundancy$N$, $N+1$, and $2N$ configurations with Lithium-ion batteries.
Cooling System Air-cooled with closed-loop chilled water (Near-zero WUE).
Connectivity 4 Points of Entry (POE); 2 Meet-Me-Rooms per building.
PUE Target < 1.25 (Design Optimized)
Energy Mix 100% Renewable energy options available via SRP.

Milestones

HeaderDetails
Announcement January 4, 2024 (Financing/Expansion)
Construction Start Phase 1: 2018; Expansion: 2024/2025
Phase 1 Go-Live Operational (PH01)
Full Buildout 2028

Investment Details

HeaderDetails
Total InvestmentTotal Campus Financing: $1.9 Billion (Green Loan).
Funding Partners Group / Global Co-investors.