EdgeCore PHX04 Data Center: High-Density AI & Hyperscale Hub in Mesa, Arizona

Status: Active Development / Phased Buildout   |   Location: EdgeCore 3856 S Everton Terrace 85212 Mesa Arizona, USA


Project Overview

EdgeCore’s PHX04 is a flagship 100 MW hyperscale data center located on the company’s 84-acre master-planned campus in Mesa, Arizona. Designed to support the next generation of hyperscale cloud computing, artificial intelligence (AI), and high-performance computing (HPC) workloads, the facility provides scalable infrastructure capable of accommodating ultra-high-density deployments for GPU-based AI training clusters, enterprise cloud platforms, and large-scale digital services. PHX04 is engineered with an advanced closed-loop air-cooled architecture that delivers highly efficient thermal performance while achieving a near-zero Water Usage Effectiveness (WUE) of less than 0.01 liters per kilowatt-hour, significantly reducing water consumption in Arizona’s water-constrained Sonoran Desert environment. The campus is supported by dedicated on-site high-voltage utility substations, providing resilient, high-capacity electrical infrastructure for mission-critical operations and future expansion. As a carrier-neutral facility, PHX04 offers path-diverse dark fiber connectivity to major Phoenix carrier hotels, internet exchanges, and cloud on-ramp providers, enabling low-latency, high-bandwidth communications for enterprise and hyperscale customers. The facility also incorporates redundant power and cooling systems, advanced physical security, automated building management, and flexible data hall configurations designed to support evolving AI and cloud infrastructure requirements. With its focus on sustainability, scalability, and operational resilience, EdgeCore PHX04 strengthens the Phoenix region’s position as one of North America’s leading hyperscale and AI data center markets.


Quick Facts

FieldValue
Project NameEdgeCore PHX04 Data Center: High-Density AI & Hyperscale Hub in Mesa, Arizona
LocationEdgeCore 3856 S Everton Terrace 85212 Mesa Arizona, USA
StatusActive Development / Phased Buildout
CommissioningPhase 1 Go-Live: Target 2025–2026 / Active Multi-Phase Development
Total IT Load100 MW Dedicated Critical IT Power Capacity Allocation (PHX04 Building Allocation)
Total Capacity100 MW Critical IT Power across ~540,000 sq ft (~50,160 m²) gross facility whitespace footprint (Mesa Campus Total: 496 MW across 2.7M+ sq ft / 84 acres)
Tier LevelTier III Certified Standards / Green Globes® Certified / LEED Design Standards / ISO 27001, ISO 14001, SOC 1 & 2 Type II, PCI-DSS Compliant
Project TypePurpose-Built Master-Planned Hyperscale, High-Density AI Colocation & Cloud Infrastructure Hub

City Profile

HeaderDetails
City NameMesa (East Valley)
Population~512,000
Urban Agglomeration~4,900,000 (part of the Phoenix–Mesa–Scottsdale metro area)
City GDP~USD 30–35 Billion (estimated economic output within Mesa area)
Per Capita Income~USD 36,000
City TierTier 2 U.S. Technology & Suburban Economic Hub
Key StrengthsAerospace manufacturing, semiconductor ecosystem, data centers, healthcare services, higher education, logistics, tourism, proximity to Phoenix tech corridor

Companies Involved

HeaderDetails
Developer / Operator EdgeCore Digital Infrastructure
Strategic Infrastructure Partner Salt River Project (SRP) Utility Network & City of Mesa Municipal Authorities
Construction Contractor Specialized US Mission-Critical General Contractors
MEP Engineering EdgeCore In-House Technical Infrastructure & Global Engineering Teams
Network Connectivity Carrier-neutral platform featuring subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency dark fiber backhaul to Phoenix carrier hotels and regional cloud exchanges.
Power Infrastructure Dual dedicated high-voltage utility substations on campus, static distributed 2N / Block Redundant N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt standby diesel generator arrays with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity100 MW Secured Utility Power Allocation (PHX04 Building Allocation)
UPS RedundancyBlock Redundant / 2N Static UPS Architecture
Cooling System Closed-loop air-cooled chilled water system (WUE < 0.01 L/kWh), Direct-to-Chip Liquid Cooling (DLC) readiness for high-density AI clusters, and automated BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps and cross-connect options across North American fiber corridors.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix 100% Carbon-Free Energy integration through local renewable power purchase agreements with Salt River Project (SRP).

Milestones

HeaderDetails
Announcement 2022–2023
Construction Start 2023–2024
Phase 1 Go-Live Target 2025–2026
Full Buildout Active Multi-Phase Development

Investment Details

HeaderDetails
Total InvestmentEstimated $400,000,000 USD to $600,000,000 USD Building Capital Expenditure
Funding Corporate Capital Expenditure, Debt Financing & Private Equity Infrastructure Capital (Partners Group / EdgeCore)

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.