EdgeCore PH05 Data Center: High-Density AI & Hyperscale Hub in Mesa, Arizona

Status: Active Development / Phased Buildout   |   Location: 3856 S Everton Terrace, Mesa, AZ 85212, USA


Project Overview

EdgeCore’s PH05 is a flagship 100 MW hyperscale data center expansion located within the company’s 84-acre master-planned campus in Mesa, Arizona. Purpose-built to support the rapidly growing demands of hyperscale cloud providers, artificial intelligence (AI), and high-performance computing (HPC) environments, the facility is engineered to accommodate ultra-high-density rack deployments required for GPU-intensive AI training clusters, cloud availability zones, and large-scale enterprise workloads. PH05 incorporates an advanced closed-loop air-cooled architecture that delivers highly efficient thermal management while maintaining a near-zero Water Usage Effectiveness (WUE) of less than 0.01 liters per kilowatt-hour, significantly reducing water consumption in Arizona’s arid Sonoran Desert climate. The campus is supported by dedicated on-site high-voltage utility substations that provide resilient, scalable electrical infrastructure capable of supporting continuous mission-critical operations and future expansion. As a carrier-neutral facility, PH05 offers path-diverse dark fiber connectivity to major Phoenix carrier hotels, internet exchanges, and leading cloud on-ramp providers, ensuring low-latency, high-bandwidth network performance for hyperscale and enterprise customers. The data center also features redundant power and cooling systems, advanced physical security, intelligent infrastructure monitoring, and flexible data hall configurations optimized for next-generation AI and cloud computing deployments. With its combination of sustainability, operational resilience, and scalable digital infrastructure, EdgeCore PH05 reinforces Mesa’s position as one of North America’s premier hubs for hyperscale, cloud, and AI-ready data center development.


Quick Facts

FieldValue
Project NameEdgeCore PH05 Data Center: High-Density AI & Hyperscale Hub in Mesa, Arizona
Location3856 S Everton Terrace, Mesa, AZ 85212, USA
StatusActive Development / Phased Buildout
CommissioningPhase 1 Go-Live: Target 2026–2027 / Active Multi-Phase Development
Total IT Load100 MW Dedicated Critical IT Power Capacity Allocation (PH05 Building Allocation)
Total Capacity100 MW Critical IT Power across ~540,000 sq ft (~50,160 m²) gross facility whitespace footprint (Mesa Campus Total: 496 MW across 2.7M+ sq ft / 84 acres)
Tier LevelTier III Certified Standards / Green Globes® Certified / LEED Design Standards / ISO 27001, ISO 14001, SOC 1 & 2 Type II, PCI-DSS Compliant
Project TypePurpose-Built Master-Planned Hyperscale, High-Density AI Colocation & Cloud Infrastructure Hub

City Profile

HeaderDetails
City NameMesa (East Valley)
Population~512,000
Urban Agglomeration~4,900,000 (part of the Phoenix–Mesa–Scottsdale metro area)
City GDP~USD 30–35 Billion (estimated economic output within Mesa area)
Per Capita Income~USD 36,000
City TierTier 2 U.S. Technology & Suburban Economic Hub
Key StrengthsAerospace manufacturing, semiconductor ecosystem, data centers, healthcare services, higher education, logistics, tourism, proximity to Phoenix tech corridor

Companies Involved

HeaderDetails
Developer / Operator EdgeCore Digital Infrastructure
Strategic Infrastructure Partner Salt River Project (SRP) Utility Network & City of Mesa Municipal Authorities
Construction Contractor Specialized US Mission-Critical General Contractors
MEP Engineering EdgeCore In-House Technical Infrastructure & Global Engineering Teams
Network Connectivity Carrier-neutral platform featuring subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency dark fiber backhaul to Phoenix carrier hotels and regional cloud exchanges.
Power Infrastructure Dual dedicated high-voltage utility substations on campus, static distributed 2N / Block Redundant N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt standby diesel generator arrays with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity100 MW Secured Utility Power Allocation (PH05 Building Allocation)
UPS RedundancyBlock Redundant / 2N Static UPS Architecture
Cooling System Closed-loop air-cooled chilled water system (WUE < 0.01 L/kWh), Direct-to-Chip Liquid Cooling (DLC) readiness for high-density AI clusters, and automated BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps and cross-connect options across North American fiber corridors.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix 100% Carbon-Free Energy integration through local renewable power purchase agreements with Salt River Project (SRP).

Milestones

HeaderDetails
Announcement 2023–2024
Construction Start 2024–2025
Phase 1 Go-Live Target 2026–2027
Full Buildout Active Multi-Phase Development

Investment Details

HeaderDetails
Total InvestmentEstimated $400,000,000 USD to $600,000,000 USD Building Capital Expenditure
Funding Corporate Capital Expenditure, Debt Financing & Private Equity Infrastructure Capital (Partners Group / EdgeCore)

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.