Equinix NY4 Secaucus: 18MW Financial Trading & Interconnection Hub

Status: Operational   |   Location: 755 Secaucus Road, Secaucus, NJ 07094, USA


Project Overview

Equinix NY4 Secaucus is a flagship 18 MW financial colocation data center located within the Equinix Secaucus campus in Hudson County, New Jersey, approximately five miles from Manhattan’s financial district. Designed to support mission-critical financial workloads, NY4 serves as a major connectivity and trading hub for global financial institutions, electronic trading platforms, and high-frequency trading firms. The facility spans 338,967 square feet, including 151,772 square feet of raised-floor technical space, providing a highly secure and scalable environment for low-latency applications. The single-story steel-frame building features reinforced concrete construction and advanced flood-resiliency measures to ensure operational reliability in a critical infrastructure location. NY4 benefits from seamless campus interconnection with nearby Equinix facilities, including NY2, NY3, NY5, and NY6, enabling efficient data exchange and network expansion. As a carrier-neutral facility, NY4 provides access to diverse network providers, international fiber routes, financial ecosystems, and leading cloud platforms through Equinix Fabric®. With direct connectivity to major carrier hotels and financial networks, the data center delivers ultra-low-latency performance, robust security, and high availability, making it a preferred destination for financial services companies, trading exchanges, and enterprises requiring advanced digital infrastructure


Quick Facts

FieldValue
Project NameEquinix NY4 Secaucus: 18MW Financial Trading & Interconnection Hub
Location755 Secaucus Road, Secaucus, NJ 07094, USA
StatusOperational
Commissioning2007
Total IT Load18.0 MW
Total Capacity18.0 MW critical IT load across 338,967 sq ft gross building space with 151,772 sq ft of raised-floor colocation whitespace
Tier LevelTier III Equivalent / ISO 27001, ISO 50001, PCI DSS, SOC 1 Type 2, SOC 2 Type 2, NIST 800-53 & HIPAA Certified
Project TypePurpose-Built Financial Services Colocation, Low-Latency Trading & Cloud Ecosystem Campus

City Profile

HeaderDetails
City NameSecaucus
Population22,181 (2020 U.S. Census)
Urban Agglomeration~19.8 million (New York–Newark Urban Area)
City GDPNot officially reported at the city/town level; Secaucus is a major commercial and logistics hub within the New York metropolitan economy.
Per Capita Income~US$52,000–55,000 (estimated from recent census/community survey data)
City TierTier 3 (small town with significant regional economic importance due to its strategic location)
Key StrengthsStrategic location near Manhattan; major transportation and logistics hub; strong retail and commercial sector; proximity to New York City; business-friendly environment; extensive warehousing and distribution infrastructure.

Companies Involved

HeaderDetails
Developer / Operator Equinix
Strategic Infrastructure Partner Public Service Electric and Gas Company (PSE&G) & Town of Secaucus
Construction Contractor Leading Commercial Mission-Critical Construction Partners
MEP Engineering Equinix Global Technical Engineering Division
Network Connectivity Carrier-neutral facility with access to 60+ network providers, Equinix Financial Exchange, Equinix Fabric®, and direct fiber routes to NYC carrier hubs.
Power Infrastructure Dual high-voltage grid utility feeds provided by PSE&G, supported by N+1 static UPS modules and emergency standby diesel generator arrays.

Technical Specifications

HeaderDetails
Power Capacity18.0 MW total critical IT capacity
UPS RedundancyN+1 concurrently maintainable UPS power topology supported by standby diesel generator arrays with 30+ hours of full-load fuel autonomy.
Cooling System N+1 high-efficiency chilled water loops, CRAH units, free cooling, and hot/cold aisle containment systems.
Connectivity Carrier-neutral design featuring campus cross-connects to NY2/NY5/NY6, dual Meet-Me-Rooms, and direct financial market feeds.
PUE Target 1.25–1.30
Energy Mix Integrated PSE&G grid supply supported by 100% wind/solar Virtual Power Purchase Agreements (vPPAs) and Green-e RECs.

Milestones

HeaderDetails
Announcement 2006
Construction Start 2006
Phase 1 Go-Live 2007
Full Buildout Operational

Investment Details

HeaderDetails
Total Investment$250,000,000+ USD
Funding Direct corporate capital expenditure & credit facilities managed by Equinix

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.