Equinix OS3 Osaka: High-Density & Liquid-Cooled IBX Expansion

Status: Operational / Active Multi-Phase Capacity Expansion   |   Location: Keihanshin OBP Building, 2-2-82 Shiromi, Chuo-ku, Osaka City, 540-0001, Japan


Project Overview

Equinix OS3 is a flagship 14-story International Business Exchange (IBX) data center strategically located within Osaka Business Park (OBP) in Chuo-ku, one of the Kansai region's premier commercial and technology hubs. Designed to meet the growing demand for high-performance digital infrastructure, the facility delivers more than 80,000 square feet (7,467 m²) of premium colocation space with capacity for up to 2,500 cabinets upon full buildout. OS3 is engineered with advanced base-isolation seismic technology, providing exceptional resilience against earthquakes and ensuring continuous operations for mission-critical enterprise and cloud environments. As a key interconnection hub in western Japan, the facility offers direct, ultra-low-latency cross-connects to Osaka's major network exchange points in Dojima, including JPIX, JPNAP, and BBIX, enabling seamless connectivity to leading telecommunications carriers, internet service providers, enterprises, and global cloud platforms. The data center is purpose-built to support high-density artificial intelligence (AI), machine learning, and advanced compute workloads through next-generation direct-to-chip (DTC) liquid cooling infrastructure, allowing customers to deploy power-intensive GPU clusters with improved thermal efficiency and performance. Operating entirely on 100% clean energy, OS3 also aligns with sustainability objectives while delivering high availability, robust physical security, scalable infrastructure, and carrier-neutral connectivity. Its strategic location, resilient design, and advanced cooling capabilities make Equinix OS3 a critical digital gateway for enterprises, hyperscale cloud providers, financial institutions, and content delivery networks expanding across the Kansai region and the broader Asia-Pacific market.


Quick Facts

FieldValue
Project NameEquinix OS3 Osaka: High-Density & Liquid-Cooled IBX Expansion
LocationKeihanshin OBP Building, 2-2-82 Shiromi, Chuo-ku, Osaka City, 540-0001, Japan
StatusOperational / Active Multi-Phase Capacity Expansion
CommissioningPhase 1 Launch: Q4 2021 / Full Capacity Buildout & High-Density Liquid Expansion: 2024–2026
Total IT Load~12 MW – 15 MW Total Critical IT Load across 2,500 total cabinets capacity
Total Capacity~18+ MW Gross Utility Supply across 80,375 sq ft (7,467 m²) total colocation whitespace
Tier LevelTier III Equivalent / Concurrent Maintainability (ISO 14001, ISO 50001, LEED, FISC Certified)
Project TypePurpose-Built High-Density Hyperscale, Cloud & AI-Ready Colocation Hub

City Profile

HeaderDetails
City NameOsaka
Population~2.7 Million (Osaka City)
Urban Agglomeration~19.3 Million (Kansai Metropolitan Area)
City GDPSignificant regional economic engine of Japan
Per Capita IncomeHigh
City TierTier 1/Emerging Hyperscale Hub (Complementary to Tokyo)
Key StrengthsSecond-largest metropolitan economy, robust infrastructure, growing hyperscale cloud region status, lower seismic risk than parts of Tokyo.

Companies Involved

HeaderDetails
Developer / Operator Equinix
Strategic Infrastructure Partner Kansai Electric Power Company (KEPCO) & Financial Information Systems Center (FISC Japan)
Construction Contractor Keihanshin Building Co., Ltd. & Specialized Japanese Mission-Critical Contractors
MEP Engineering Equinix Asia-Pacific Global Design & High-Density Thermal Engineering Teams
Network Connectivity Direct, low-latency dark fiber ties to Dojima network core, direct access to Equinix Fabric, Equinix Internet Exchange, and cloud on-ramps to AWS, Azure, Google Cloud, and OCI.
Power Infrastructure Dual high-voltage sub-transmission utility interconnections supplied by KEPCO, high-efficiency static block-redundant static UPS systems (N+1), and gas turbine / diesel emergency backup generators with 48+ hours on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity~18 MW Gross Substation Utility Power Allocation
UPS RedundancyBlock Redundant / Static N+1 Uninterruptible Power Supply (UPS) Configuration
Cooling System High-efficiency air-cooled chillers, CRAH units in N+20% configuration, direct-to-chip (DTC) liquid cooling manifolds for high-density AI server deployment, and hot/cold aisle containment.
Connectivity Carrier-neutral access with multi-path underground fiber entry vaults, direct cross-connects, and metro fiber links connecting OS1, OS2x, and OS3.
PUE Target ~1.25 Annualized Design PUE
Energy Mix 100% matched clean energy procurement covered via Japanese wind/solar Non-Fossil Certificates (NFCs) and regional I-RECs.

Milestones

HeaderDetails
Announcement November 2020
Construction Start Q4 2020
Phase 1 Go-Live Q4 2021 (Initial 900 Cabinets / 3,070 m²)
Full Buildout 2024–2026 (Full 2,500 Cabinets / 80,000+ sq ft Expansion)

Investment Details

HeaderDetails
Total Investment$55,000,000 USD initial investment phase + multi-phase building expansion capital
Funding Equinix corporate capital expenditure (CapEx) allocation