Expedient Upper Arlington: 1.6MW Columbus Data Hub

Status: Operational   |   Location: 5000 Arlington Centre Blvd, Building 1, Upper Arlington, Ohio 43220, USA


Project Overview

Situated in the northern technological sub-market of the Columbus metropolitan area, Expedient’s Upper Arlington data center (CMH1) provides mission-critical colocation, managed cloud infrastructure, and push-button disaster recovery services for Midwest enterprise operations. Spanning 21,591 square feet of overall building envelope featuring 9,300 square feet of 24-inch raised floor space, the facility is engineered to deliver uninterrupted compute availability and seamless multi-site workload failovers. The architectural blueprint implements a fully redundant 2N Uninterruptible Power Supply (UPS) system backed by auto-cutover Caterpillar diesel generators with 10,000 gallons of fuel storage, securing continuous operation under grid instability. Built to meet strict enterprise compliance standards, the data center undergoes routine independent third-party audits to support SOC 1, SOC 2, HIPAA, PCI DSS, and HITRUST CSF certifications. The physical perimeter incorporates multi-stage security protocols, including biometric hand-geometry scanners, card-key access traps, and 24/7/365 physical guarding monitored by an on-site Operations Support Center (OSC). Environmental stability is maintained via a 420-ton precision cooling plant configured with N+2 redundancy, paired with FE-25 gaseous fire suppression and dry-pipe pre-action sprinkler systems. Network transport is delivered through a carrier-neutral infrastructure featuring seven on-net telecommunication carriers with physically separated subterranean fiber entries. By linking directly into Expedient's private multi-gigabit national backbone network, the facility offers low-latency interconnectivity to AWS US-East and adjacent regional cloud nodes, making it a key infrastructure pillar for Ohio healthcare systems, financial institutions, and enterprise IT deployments.


Quick Facts

FieldValue
Project NameExpedient Upper Arlington: 1.6MW Columbus Data Hub
Location5000 Arlington Centre Blvd, Building 1, Upper Arlington, Ohio 43220, USA
StatusOperational
CommissioningH2 2011
Total IT Load1.6 MW
Total Capacity3.5 MW (Total Standby Generator Capacity across 21,591 sq. ft. facility)
Tier LevelTier III Compliant Standards
Project TypeRetail Colocation, Managed Cloud Services & Disaster Recovery Hub

City Profile

HeaderDetails
City NameUpper Arlington
Population35,893 (2025 estimate)
Urban AgglomerationApproximately 2.24 million (Columbus metropolitan area, 2025)
City GDPApproximately US$182.1 billion (Columbus metropolitan area, 2023; city-level GDP is not separately reported)
Per Capita IncomeUS$84,831 (2020–2024, in 2024 dollars)
City TierTier 1 Suburban City / Affluent Metropolitan Suburb
Key StrengthsHigh household incomes, strong education ecosystem, proximity to Columbus, access to skilled talent, excellent connectivity, stable residential market, strong retail and healthcare sectors

Companies Involved

HeaderDetails
Developer / Operator Expedient
Strategic Infrastructure Partner American Electric Power (AEP Ohio), City of Upper Arlington
Construction Contractor Regional Mission-Critical General Contracting Partners
MEP Engineering Expedient Internal Facilities & Mechanical Engineering Teams
Network Connectivity 7 On-Net Carriers (including AT&T, Lumen/Level 3, Zayo, Spectrum Enterprise, Cogent, and Crown Castle).
Power Infrastructure Dual diverse utility power feeds from AEP Ohio connected directly to interior medium-voltage transformation gear.

Technical Specifications

HeaderDetails
Power Capacity1.6 MW critical IT power capacity (supported by 3.5 MW total generator plant)
UPS RedundancyTrue 2N configuration utilizing dual 750 kVA Liebert static UPS modules
Cooling System 420 tons of total cooling capacity utilizing computer room air conditioning (CRAC) units configured in an N+2 design capacity.
Connectivity Carrier-neutral design featuring dual subterranean concrete fiber vaults, redundant carrier meet-me-rooms, and multi-gigabit private network backbone access.
PUE Target 1.45
Energy Mix Pulled directly from the AEP Ohio regional power grid, supplemented by Expedient corporate energy efficiency initiatives.

Milestones

HeaderDetails
Announcement Q1 2011
Construction Start Q2 2011
Phase 1 Go-Live H2 2011
Full Buildout H1 2015 (Ongoing infrastructure and cloud POD density upgrades)

Investment Details

HeaderDetails
Total Investment$14,000,000 (Estimated regional asset acquisition, structural buildout, and continuous equipment upgrades)
Funding Corporate capital expenditure allocation backed by AMP Capital (Expedient parent equity)