Status: Proposed / Active Development Application (Latrobe Council) | Location: 226 Mill Road (Former Pulp Mill Site), Wesley Vale, TAS 7307, Australia
The Firmus Wesley Vale AI Factory is a proposed 52.0 MW high-density cloud and artificial intelligence infrastructure facility planned at 226 Mill Road, Wesley Vale, Tasmania 7307, Australia. Developed by Firmus Technologies as part of its national Project Southgate sovereign compute rollout, the project is intended to establish advanced domestic computing capacity while redeveloping previously modified industrial land within the former Wesley Vale Pulp Mill precinct. The development occupies an approximately 3,500-square-metre footprint and is planned as a compact, single-story facility centered around a principal data hall of approximately 2,690 square metres. The AI Factory is designed primarily to support high-performance computing (HPC), artificial intelligence model training, inference, and other computationally intensive workloads requiring substantial power and high-density cooling infrastructure. A key feature of the project is its direct electricity connection to the adjacent TasNetworks Wesley Vale substation, providing the facility with a dedicated pathway to the local electricity network. The project also incorporates Firmus Technologies' AI FactoryOS platform, which is designed to enable dynamic demand response and optimize electricity consumption according to grid conditions, potentially allowing computing loads to respond more flexibly to available power. For thermal management, the facility will utilize Firmus's proprietary HyperCube immersion and liquid-cooling technology, supporting high-density computing while reducing the cooling requirements associated with conventional air-cooled data centers. The combination of direct grid connectivity, demand-responsive computing, and advanced cooling is intended to improve operational efficiency and reduce the environmental footprint of the facility. By repurposing an established industrial site rather than developing an entirely undeveloped location, the Wesley Vale AI Factory also represents a model for integrating new digital infrastructure into existing industrial areas. With its substantial 52 MW planned capacity and focus on sovereign AI and HPC workloads, the project forms part of Firmus Technologies' broader strategy to expand Australia's high-density computing infrastructure.
| Field | Value |
|---|---|
| Project Name | Firmus Wesley Vale AI Factory 226 Mill Road Tasmania 52MW Data Center |
| Location | 226 Mill Road (Former Pulp Mill Site), Wesley Vale, TAS 7307, Australia |
| Status | Proposed / Active Development Application (Latrobe Council) |
| Project Type | Purpose-Built Industrial Brownfield AI Factory & HPC Colocation |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Wesley Vale |
| Population | 483 (2021 Census) |
| Urban Agglomeration | Part of the wider Devonport urban and economic area |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.