Status: Fully Operational / Active Multi-Building Expansion | Location: 1, Persiaran Teknologi Perintis, Taman Teknologi Johor, 79200 Iskandar Puteri, Johor Darul Ta'zim, Malaysia
GDS International’s Nusajaya Tech Park (NTP) Data Center Campus in Iskandar Puteri, Johor Bahru, is a flagship hyperscale digital infrastructure hub strategically positioned to serve Southeast Asia’s rapidly growing cloud, artificial intelligence, and enterprise markets. Delivering more than 225 MW of critical IT capacity across a 110,000 m² campus, the development is purpose-built to accommodate hyperscale cloud providers, global internet companies, content platforms, financial institutions, and high-performance AI/HPC computing environments requiring scalable, resilient infrastructure. Located immediately adjacent to Singapore, the campus benefits from cross-border dark fiber connectivity that enables ultra-low-latency access to Singapore’s financial district, cloud ecosystems, and regional internet exchanges while leveraging Malaysia’s greater availability of land, power, and long-term expansion opportunities. Designed for next-generation computing, the campus is engineered to support high-density rack deployments and incorporates liquid-cooling readiness to meet the thermal requirements of advanced GPU-based AI and machine learning workloads. As part of GDS International’s regional expansion strategy, the facility also integrates energy-efficient infrastructure and sustainable power initiatives to improve operational performance and environmental responsibility. Supported by carrier-neutral connectivity, resilient electrical and cooling systems, advanced physical security, and continuous infrastructure monitoring, the Nusajaya Tech Park campus serves as a critical gateway for digital transformation, cloud expansion, and AI infrastructure deployment across Southeast Asia.
| Field | Value |
|---|---|
| Project Name | GDS International Nusajaya Johor Data Center Campus: 225MW+ Hyperscale & AI Hub |
| Location | 1, Persiaran Teknologi Perintis, Taman Teknologi Johor, 79200 Iskandar Puteri, Johor Darul Ta'zim, Malaysia |
| Status | Fully Operational / Active Multi-Building Expansion |
| Commissioning | Phase 1 (NTP1) Go-Live: Q3 2023 / Phased Buildout Across NTP Phase 1–3 (2024–2026+) |
| Total IT Load | 225+ MW Critical IT Power Capacity Allocation |
| Total Capacity | 225+ MW Total IT Capacity across a 110,000 m² (~1,184,000 sq ft) gross footprint across multiple data hall facilities |
| Tier Level | Tier III Certified Architecture / ISO 27001, ISO 14001, SOC 2 Type II |
| Project Type | Purpose-Built Greenfield Hyperscale, High-Density AI-Ready Colocation & Regional Cloud Gateway |
| Header | Details |
|---|---|
| City Name | Johor Bahru |
| Population | ~1.7 Million |
| Urban Agglomeration | ~2.5 Million (Iskandar Malaysia region) |
| City GDP | RM 150 Billion (State of Johor) |
| Per Capita Income | ~RM 42,000 |
| City Tier | Tier 1 (Malaysia) / Global Secondary Hub |
| Key Strengths | Proximity to Singapore, abundant land, favorable power costs |
| Header | Details |
|---|---|
| Developer / Operator | GDS Holdings Limited |
| Strategic Infrastructure Partner | Tenaga Nasional Berhad (TNB) & Johor State Investment Entities |
| Construction Contractor | Specialized Asian Mission-Critical EPC Contractors |
| MEP Engineering | GDS International In-House Global Engineering & Technical Operations Teams |
| Network Connectivity | Carrier-neutral platform featuring diverse subterranean fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency cross-border optical dark fiber backhaul to Singapore carrier hotels, cloud zones, and regional subsea cable landing stations. |
| Power Infrastructure | Dual 275kV high-voltage utility grid feeds supplied by Tenaga Nasional Berhad (TNB), static distributed 2N / N+1 uninterruptible power supply (UPS) system architecture, automated switchgear, and standby emergency diesel backup generator arrays with multi-day on-site fuel reserves. |
| Header | Details |
|---|---|
| Power Capacity | 225+ MW Secured Utility Power Allocation |
| UPS Redundancy | 2N / N+1 Distributed Redundant Static UPS Architecture |
| Cooling System | High-efficiency chilled-water precision cooling plant with N+2 thermal redundancy, hot/cold aisle containment, Direct-to-Chip Liquid Cooling (DLC) readiness supporting 80+ kW GPU racks, and automated BMS environmental controls. |
| Connectivity | Carrier-neutral access with direct low-latency cloud express on-ramps and cross-connect options across Southeast Asian and global networks. |
| PUE Target | < 1.30 Annualized Operational Design PUE |
| Energy Mix | Integrated with TNB high-reliability grid utility power with ongoing expansion into solar PPAs and green energy certificates in Johor. |
| Header | Details |
|---|---|
| Announcement | 2021 |
| Construction Start | 2022 |
| Phase 1 Go-Live | Operational (Q3 2023 – NTP1) |
| Full Buildout | Active Multi-Building Campus Expansion |
| Header | Details |
|---|---|
| Total Investment | Estimated $1,300,000,000+ USD Total Campus Capital Expenditure |
| Funding | Corporate Capital Expenditure & Private Equity / Infrastructure Financing by GDS International |