Green ZRH1 Zurich West Data Center Campus: High-Density Lupfig Hub

Status: Operational / Active Expansion (Zurich West 4)   |   Location: Industriestrasse 31–33, 5242 Lupfig, Aargau, Switzerland


Project Overview

Green Datacenter AG’s Metro-Campus Zurich West (ZRH1) in Lupfig, Switzerland, is a flagship sustainable digital infrastructure campus serving the strategic Zurich-Basel-Bern economic corridor. Designed to support enterprise, cloud, and high-performance computing workloads, the campus consists of multiple independent data center facilities, including Zurich West 1–4, providing a scalable and resilient environment for businesses requiring secure and energy-efficient digital infrastructure. ZRH1 delivers advanced colocation services with high-density computing capabilities, supporting rack densities of more than 25 kW per rack for demanding applications such as artificial intelligence, HPC, cloud platforms, and data-intensive workloads. The campus provides direct cloud connectivity, robust network interconnection, and carrier-neutral infrastructure to enable seamless access to regional and global digital ecosystems. Sustainability is a core element of the facility’s design, with operations powered by 100% renewable energy and optimized through advanced free-cooling technologies that significantly improve energy efficiency and reduce environmental impact. The campus also contributes to the local energy ecosystem by recovering and exporting waste heat through the “Naturenergie Eigenamt” district heating network, supporting sustainable community energy solutions while maintaining ultra-low Power Usage Effectiveness (PUE) performance. With its combination of renewable energy, innovative cooling systems, high-density infrastructure, and strategic location, Green Datacenter’s Zurich West campus represents one of Switzerland’s leading examples of environmentally responsible and future-ready data center development.


Quick Facts

FieldValue
Project NameGreen ZRH1 Zurich West Data Center Campus: High-Density Lupfig Hub
LocationIndustriestrasse 31–33, 5242 Lupfig, Aargau, Switzerland
StatusOperational / Active Expansion (Zurich West 4)
CommissioningZurich West 1–3 Operational / Zurich West 4 Target: 2026–2027
Total IT Load~40 MW Critical IT Load (Scalable)
Total Capacity40 MW+ Total Utility Power Allocation across 10,000+ m² whitespace (expanding by 5,526 m² with Zurich West 4)
Tier LevelTier III+ / Tier IV Level Equivalent (Uptime Institute M&O Approved, ISO 27001, ISO 50001, ISAE 3402, PCI-DSS Certified)
Project TypePurpose-Built Enterprise Colocation, High-Density AI/HPC & Cloud Gateway

City Profile

HeaderDetails
City NameLupfig
Population3,500
Urban AgglomerationPart of the Zürich–Basel economic corridor (millions of residents)
City GDPPart of the Aargau regional economy (Aargau GDP ~CHF 45+ billion)
Per Capita Income~CHF 62,000
City TierTier 3 – Industrial & Regional Business Location
Key StrengthsStrategic location between Zürich and Basel; strong industrial and logistics connectivity; proximity to major highways and rail networks; access to Switzerland’s skilled workforce; stable business environment; nearby technology and manufacturing clusters; suitable location for industrial facilities and digital infrastructure developments.

Companies Involved

HeaderDetails
Developer / Operator Green Datacenter
Strategic Infrastructure Partner Local Aargau Power Utilities & IBB Energie AG (District Heat Integration Partner)
Construction Contractor Specialized Swiss Mission-Critical EPC & General Contractors
MEP Engineering Green Datacenter In-House Infrastructure & Thermal Engineering Teams
Network Connectivity Carrier-neutral facility with direct access to SwissIX, NIXI, and global telecom carriers; redundant Meet-Me-Rooms (MMRs); dual underground fiber entrance vaults.
Power Infrastructure Dual independent 40 MW high-voltage power feeds supplied from separate substations, redundant static UPS systems, automated switchgear, and standby diesel generator units with 7 days on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity40 MW+ Total Utility Allocation
UPS Redundancy2(N+1) / N+1 Static Uninterruptible Power Supply (UPS) Configuration
Cooling System Ambient air free-cooling, closed-loop chilled water distribution, hot/cold aisle containment, direct liquid-to-chip readiness, and waste-heat export integration.
Connectivity Carrier-neutral access providing ultra-low latency direct interconnects to cloud networks and regional fiber backbones.
PUE Target < 1.19 Annualized Operational Design PUE
Energy Mix 100% Green Renewable Energy supply matching.

Milestones

HeaderDetails
Announcement Q3 2024 (Zurich West 4 Expansion Phase)
Construction Start 2024 (Zurich West 4 Phase)
Phase 1 Go-Live Operational (Zurich West 1–3) / 2026–2027 (Zurich West 4)
Full Buildout Operational Active Expansion

Investment Details

HeaderDetails
Total InvestmentEstimated CHF 250 Million to CHF 400 Million+ (~$280M–$450M USD)
Funding Corporate Capital Expenditure by Green Datacenter AG / InfraVia Capital Partners