Beyond.pl WRO1 Wrocław Data Center Campus: 150MW AI-Ready Hub

Status: Under Development / Planned Expansion   |   Location: Strategic Industrial & Tech Corridor, Wrocław, Lower Silesia, Poland


Project Overview

Beyond.pl’s WRO1 Data Center Campus in Wrocław, Poland, is an advanced carrier-neutral digital infrastructure hub designed to support next-generation computing requirements across Western Poland and the broader European market. Built to address the growing demand for artificial intelligence (AI), machine learning, high-performance computing (HPC), and cloud-based workloads, WRO1 provides up to 150 MW of total power capacity, positioning it among Poland’s most significant hyperscale-ready data center developments. The campus is engineered for high-density deployments, incorporating advanced cooling solutions including direct-to-chip liquid cooling and liquid immersion cooling technologies that enable support for extreme rack densities of more than 140 kW per cabinet. These capabilities make WRO1 suitable for intensive AI training, large language model (LLM) workloads, advanced analytics, and other GPU-driven applications requiring substantial computing power. Powered entirely by 100% renewable energy, the facility combines sustainable operations with enterprise-grade reliability and scalability. Strategically located in Wrocław, one of Poland’s key technology and business centers, WRO1 provides low-latency fiber connectivity to major European digital hubs including Frankfurt, Berlin, and Warsaw. With its focus on energy efficiency, high-performance infrastructure, and future-ready design, Beyond.pl’s WRO1 Data Center Campus strengthens Poland’s role as an emerging European destination for AI infrastructure, cloud services, and digital innovation.


Quick Facts

FieldValue
Project NameBeyond.pl WRO1 Wrocław Data Center Campus: 150MW AI-Ready Hub
LocationStrategic Industrial & Tech Corridor, Wrocław, Lower Silesia, Poland
StatusUnder Development / Planned Expansion
CommissioningTarget Phased Delivery (2026–2027+)
Total IT Load~120 MW Critical IT Load
Total Capacity150 MW Total Power Allocation across a multi-building campus footprint
Tier LevelANSI/TIA-942 Rated 4 / EN 50600 Class 4 Equivalent Architecture (ISO 27001, ISO 14001, PCI-DSS, SOC 2 Certified Platform)
Project TypePurpose-Built Hyperscale, High-Density AI Factory, Liquid-Cooled Colocation & Cloud Hub

City Profile

HeaderDetails
City NameWrocław
Population~675,000
Urban Agglomeration~1.2 million
City GDP~PLN 80–100 billion (estimated)
Per Capita Income~PLN 90,000–110,000
City TierTier 1 – Central European Technology & Business Hub
Key StrengthsMajor technology and business center in Poland; strong IT and software development ecosystem; leading hub for business process outsourcing (BPO) and shared services; home to research universities; strategic location in Central Europe; strong manufacturing and logistics sectors; excellent connectivity to European markets; growing cloud computing and data center ecosystem; skilled multilingual workforce.

Companies Involved

HeaderDetails
Developer / Operator Beyond.pl
Strategic Infrastructure Partner Polish National Grid Operators (Tauron Distribution) & Renewable Energy PPA Providers
Construction Contractor Specialized CEE & European Mission-Critical Engineering & EPC Contractors
MEP Engineering Beyond.pl In-House Technical Infrastructure & Thermal Design Teams
Network Connectivity Carrier-neutral platform with dual underground fiber entrance routes; redundant Meet-Me-Rooms (MMRs); direct connectivity into CEE and Western European carrier rings with sub-10ms latency to Berlin and Warsaw.
Power Infrastructure Dual high-voltage grid incomers, 2(N+1) / 2N static uninterruptible power supply (UPS) systems, automated switchgear, and standby back-up diesel generator plants with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity150 MW Total Utility Capacity Allocation
UPS Redundancy2(N+1) / 2N Distributed Redundant Static UPS Architecture
Cooling System Ethylene glycol closed-loop systems, Direct-to-Chip liquid cooling, Rear Door Heat Exchangers (RDHx), and Immersion Cooling readiness supporting 12 kW to 140+ kW per rack.
Connectivity Carrier-neutral facility featuring low-latency direct interconnects to Tier 1 operators, regional cloud backbones, and major Internet Exchanges (IXs).
PUE Target $\le$ 1.20 Annualized Operational Design PUE
Energy Mix 100% Green Renewable Energy supply contractually backed by Power Purchase Agreements (PPAs).

Milestones

HeaderDetails
Announcement Q3/Q4 2024
Construction Start Target 2025 / 2026
Phase 1 Go-Live Target 2026–2027
Full Buildout 2027–2029+

Investment Details

HeaderDetails
Total InvestmentEstimated €400,000,000 EUR to €650,000,000 EUR
Funding Corporate Infrastructure Equity & Project Financing by Beyond.pl