Status: Active Development / Phased Delivery | Location: Slough Trading Estate, 654-662 Ajax Avenue, Slough, SL1 4BG, United Kingdom
GTR London GB One Campus is a 40.5 MW critical IT capacity data center development at 654-662 Ajax Avenue on the Slough Trading Estate in Slough, United Kingdom, master-planned as three independent multi-story facilities comprising Building 1, Building 2, and Building 3. Each building provides 13.5 MW of IT load and more than 57,800 sq ft, or 5,373 m², of net technical whitespace, creating a scalable platform for high-density hyperscale, cloud, and AI computing deployments. Backed by KKR infrastructure capital, the campus combines substantial power capacity with a multi-building design that allows computing infrastructure to be deployed across separate facilities while supporting the requirements of large-scale customers. Electrical resilience is provided through an N+1 block-redundant static UPS topology, while eco-chiller units with airside economization provide cooling flexibility and can use suitable external conditions to support efficient thermal management. The campus is supplied with 100% renewable grid power, aligning its energy strategy with customer sustainability requirements, while hydrogen-ready standby generators provide a pathway for future alternative-fuel deployment in backup power systems. Connectivity infrastructure includes dual carrier-neutral Meet-Me-Rooms, enabling access to multiple network providers and interconnection services. Subterranean dark fiber interconnects extend connectivity to London’s primary internet exchanges, supporting low-latency access for cloud platforms, enterprise networks, hyperscale applications, and data-intensive AI workloads. The combination of 40.5 MW of critical IT capacity, three independent buildings, extensive technical whitespace, resilient power architecture, renewable electricity, flexible cooling, and high-capacity connectivity positions the campus as a significant addition to the established Slough data center environment.
| Field | Value |
|---|---|
| Project Name | GTR London GB One Campus 40.5MW Data Center Slough |
| Location | Slough Trading Estate, 654-662 Ajax Avenue, Slough, SL1 4BG, United Kingdom |
| Status | Active Development / Phased Delivery |
| Project Type | Purpose-Built High-Density Hyperscale, Cloud Node & AI Colocation Campus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Slough |
| Population | Approximately 158,500 in 2021. |
| Urban Agglomeration | Approximately 10 million within the wider London metropolitan area |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.