Hoskote Green AI Hypercampus: 500MW Bengaluru Data Hub
Status: Planned / Pre-construction Phase (Announced July 2026) | Location: Kiadb Industrial Area, Hoskote Tech Corridor, Bengaluru, Karnataka, India
Project Overview
A premier multi-facility digital infrastructure campus purpose-built to support the next generation of artificial intelligence and hyperscale cloud computing, this development is engineered to accommodate dense GPU clusters, AI training workloads, large language models (LLMs), and high-performance computing (HPC) environments. Designed with scalability, resilience, and energy efficiency at its core, the campus features advanced power distribution systems, high-capacity fiber connectivity, and future-ready infrastructure capable of supporting rapidly growing enterprise and hyperscale demand. Strategically located in South India, the facility strengthens the region's position as an emerging digital infrastructure hub while providing critical compute capacity for global cloud providers, neocloud operators, and AI-driven enterprises. A defining feature of the campus is its sustainability-focused design, which protects local water resources through advanced partnerships with municipal wastewater treatment facilities, enabling the reuse of treated water for cooling operations and significantly reducing dependence on freshwater supplies. The development also integrates energy-efficient cooling technologies, resilient utility infrastructure, and environmentally responsible operational practices to support long-term sustainable growth. Beyond expanding regional data center capacity, the project is expected to accelerate digital transformation, attract technology investments, create skilled employment opportunities, and reinforce South India's role as a strategic destination for AI infrastructure, cloud services, and next-generation digital innovation.
Quick Facts
| Field | Value |
| Project Name | Hoskote Green AI Hypercampus: 500MW Bengaluru Data Hub |
| Location | Kiadb Industrial Area, Hoskote Tech Corridor, Bengaluru, Karnataka, India |
| Status | Planned / Pre-construction Phase (Announced July 2026) |
| Commissioning | Q4 2028 (Phase 1 Baseline IT Compute Target) |
| Total IT Load | 500 MW (Full Build-out Ultimate Capacity) |
| Total Capacity | 500 MW (500 MW) |
| Tier Level | Tier IV Certified Core Architecture |
| Project Type | Greenfield Hyperscale AI-Ready Data Center & Sovereign Compute Hub |
City Profile
| Header | Details |
| City Name | Hoskote |
| Population | Approximately 95,000 (2025 estimate) |
| Urban Agglomeration | Part of the Bengaluru Metropolitan Region (BMR) with a population exceeding 15 million |
| City GDP | Not reported separately (part of the Bengaluru metropolitan economy) |
| Per Capita Income | Approximately ₹3.8 lakh per year (estimated, based on the Bengaluru metropolitan region) |
| City Tier | Tier 2 Industrial & Emerging Data Center Hub |
| Key Strengths | Strategic location on NH-75, proximity to Bengaluru, industrial parks, electronics manufacturing, logistics, warehousing, expanding power infrastructure, land availability, and growing hyperscale data center investments. |
Companies Involved
| Header | Details |
| Developer / Operator | Karnataka State Digital Infrastructure Corp |
| Strategic Infrastructure Partner | Bengaluru Water Supply and Sewerage Board (BWSSB), BESCOM |
| Construction Contractor | Tier-1 Indian Infrastructure and Engineering Consortium |
| MEP Engineering | Specialized Domestic Mission-Critical Design Specialists |
| Network Connectivity | National Long-Haul Fiber Ring Networks, Central Bengaluru Peering Exchanges |
| Power Infrastructure | Direct extra-high-voltage grid connection backed by dedicated substation yards drawing power directly from regional generation corridors. |
Technical Specifications
| Header | Details |
| Power Capacity | 600 MW gross ultimate grid-connected substation capacity |
| UPS Redundancy | 2(N+1) isolated block-redundant static UPS systems with integrated utility-scale battery energy storage systems (BESS). |
| Cooling System | Hybrid direct-to-chip liquid cooling networks combined with closed-loop systems utilizing secondary-treated municipal water pipelines. |
| Connectivity | Carrier-neutral campus layout featuring quadruple diverse subterranean fiber entry paths and low-latency optical connections. |
| PUE Target | 1.18 (Optimized using advanced thermal containment configurations) |
| Energy Mix | 100% contracted clean renewable energy mix heavily drawing from regional solar parks and corporate green tariffs. |
Milestones
| Header | Details |
| Announcement | July 2026 |
| Construction Start | Q1 2027 (Civil land clearing, grading, and site preparation) |
| Phase 1 Go-Live | Q4 2028 |
| Full Buildout | Q4 2031 (Complete realization of the multi-building campus blueprint) |
Investment Details
| Header | Details |
| Total Investment | $3,800,000,000 ($3.8 Billion USD Estimated Aggregated Masterplan Commitment) |
| Funding | Public-private partnership capital, corporate balance sheets, and green credit allocations |