Iron Mountain AMS-2 Amsterdam: 10MW Hyperscale & AI Expansion

Status: Active Development / Construction Phase   |   Location: J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-Acre Amsterdam Campus)


Project Overview

Iron Mountain’s AMS-2 is a major 10 MW purpose-built expansion within the company’s established 23-acre carrier-neutral data center campus in Haarlem, approximately 20 km from central Amsterdam, reinforcing its position as one of the Netherlands’ leading digital infrastructure hubs. The facility expands the campus’s total planned critical power capacity to nearly 43.1 MW across more than 30,000 m² of advanced technical space, providing scalable infrastructure for hyperscale cloud providers, enterprise customers, and AI-driven applications. Engineered with a modular, high-density design, AMS-2 is capable of supporting demanding generative AI, machine learning, and high-performance computing (HPC) workloads that require increased rack densities, enhanced cooling systems, and resilient power architecture. The data center offers exceptional connectivity through access to more than 60 network service providers, direct cloud on-ramps, and low-latency cross-connects to major internet exchanges, including AMS-IX and NL-ix, enabling rapid, secure, and reliable data transmission across Europe and global markets. Built with sustainability at its core, AMS-2 incorporates 24/7 carbon-free energy tracking to support customers’ environmental goals while being designed for future district heat recovery integration, allowing excess heat to be reused by nearby communities. Combined with Iron Mountain’s strong operational expertise, enterprise-grade security, and resilient infrastructure, AMS-2 provides a future-ready colocation platform for organizations accelerating digital transformation, cloud adoption, and next-generation AI deployments across Europe.


Quick Facts

FieldValue
Project NameIron Mountain AMS-2 Amsterdam: 10MW Hyperscale & AI Expansion
LocationJ.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-Acre Amsterdam Campus)
StatusActive Development / Construction Phase
CommissioningTarget Phase 1 Go-Live: Q2 2027 (Full campus expansion through 2028–2030)
Total IT Load10 MW Critical IT Capacity (AMS-2 Building Expansion)
Total Capacity43.1 MW Total Campus Substation Capacity across 30,000 m² (323,000 sq ft) full buildout whitespace
Tier LevelTier III Equivalent / Concurrent Maintainability (ISO 14001, ISO 22301, ISO 27001, ISO 50001, BREEAM, PCI-DSS Certified)
Project TypePurpose-Built Greenfield/Modular Hyperscale, Cloud & AI-Ready Campus Expansion

City Profile

HeaderDetails
City NameAmsterdam
Population~920,000
Urban Agglomeration~2.5 Million
City GDP~$115 Billion USD
Per Capita Income $65,000+ USD
City TierTier 1
Key StrengthsHighly developed digital economy, primary European connectivity hub, dense subsea cable landing point, strong political stability, supportive regulatory environment for digital infrastructure.

Companies Involved

HeaderDetails
Developer / Operator Iron Mountain
Strategic Infrastructure Partner TenneT / Liander (Electrical Utilities), Municipality of Haarlem, AMS-IX
Construction Contractor Heijmans & Specialized European Mission-Critical EPC Contractors
MEP Engineering Iron Mountain Global Design & High-Density Thermal Engineering Teams
Network Connectivity Dual diverse underground fiber entry vaults; direct access to 60+ carriers/ISPs, AMS-IX, NL-ix, and direct low-latency cloud on-ramps (AWS, Azure, Google Cloud, Oracle Cloud).
Power Infrastructure Dual high-voltage grid connections, block-redundant static UPS topology, 2N / N+1 power paths, and standby emergency diesel generators with on-site fuel reserves.

Technical Specifications

HeaderDetails
Power Capacity10 MW Critical IT Power Capacity (AMS-2) / 43.1 MW Total Campus Substation
UPS Redundancy2N / Block Redundant UPS Architecture
Cooling System Closed-loop chilled water and indirect adiabatic cooling systems with N+1 redundancy, hot/cold aisle containment, and high-density liquid-to-chip (DLC) cooling readiness.
Connectivity Carrier-neutral platform with multi-path fiber vaults, dual Meet-Me-Rooms (MMRs), and high-bandwidth cross-connects across the FLAP network corridor.
PUE Target < 1.20 Annualized Operational Design PUE
Energy Mix 100% matched renewable energy (wind and solar) with 24/7 carbon-free energy tracking and Green Power Pass accreditation.

Milestones

HeaderDetails
Announcement Q1 2025 / Q2 2025
Construction Start Q2 2025
Phase 1 Go-Live Q2 2027
Full Buildout 2028–2030 (Full 43.1 MW campus buildout)

Investment Details

HeaderDetails
Total InvestmentEstimated €100,000,000 EUR to €150,000,000 EUR
Funding Iron Mountain Inc. corporate capital expenditure (CapEx) allocation