Iron Mountain FRA-2 Frankfurt: 10.6MW Hyperscale & Connectivity Hub

Status: Operational / Active Multi-Tenant Capacity Expansion & Upgrades   |   Location: Am Martinszehnten Industrial Park, 60437 Frankfurt am Main, Germany


Project Overview

Iron Mountain’s FRA-2 is a premier 10.6 MW carrier-neutral data center located within Frankfurt’s strategically positioned Am Martinszehnten Industrial Park, one of Europe’s most important digital infrastructure corridors. Spanning approximately 38,500 m², the facility operates alongside the adjacent greenfield FRA-1 campus, increasing Iron Mountain’s total Frankfurt data center capacity to 37.6 MW. Purpose-built to support mission-critical enterprise applications, financial services, hyperscale cloud deployments, and AI-driven computing workloads, FRA-2 features resilient power infrastructure, advanced cooling systems, and flexible colocation environments designed to meet the evolving demands of high-density IT deployments. Its location provides exceptional connectivity through direct, low-latency access to DE-CIX, one of the world’s largest Internet exchange points, enabling rapid and reliable data exchange across Europe and global markets. Customers also benefit from carrier-neutral connectivity with access to more than 100 network service providers, diverse fiber routes, and direct cloud on-ramps to leading public cloud platforms, ensuring seamless hybrid and multi-cloud integration. Sustainability is a core component of the facility’s design, with operations powered by 100% renewable electricity supported by Green Power Pass certification, helping organisations achieve their environmental and carbon reduction objectives. Combined with Iron Mountain’s enterprise-grade physical security, operational excellence, and highly resilient infrastructure, FRA-2 delivers a scalable, future-ready platform for businesses seeking secure, high-performance colocation, cloud connectivity, disaster recovery, and next-generation digital transformation services in one of Europe’s most connected data center markets.


Quick Facts

FieldValue
Project NameIron Mountain FRA-2 Frankfurt: 10.6MW Hyperscale & Connectivity Hub
LocationAm Martinszehnten Industrial Park, 60437 Frankfurt am Main, Germany
StatusOperational / Active Multi-Tenant Capacity Expansion & Upgrades
CommissioningAcquired & Integrated: 2021 / Phased Modernization & Density Scaling: 2024–2026
Total IT Load10.6 MW Critical IT Capacity
Total Capacity~37.6 MW Combined Frankfurt Campus Capacity (FRA-1 + FRA-2) across 38,500 m² gross floor space at FRA-2
Tier LevelTier III Equivalent / Concurrent Maintainability (ISO 9001, ISO 14001, ISO 22301, ISO 27001, ISO 50001, EN 50600, PCI-DSS Certified)
Project TypePurpose-Built Interconnection, Enterprise Colocation & High-Density Cloud Gateway Hub

City Profile

HeaderDetails
City NameFrankfurt
Population7,80,000
Urban Agglomeration5.8 million
City GDP€160.8 billion
Per Capita Income$101,000 USD
City TierTier 1
Key StrengthsHosting DE-CIX, the worlds largest Internet Exchange Point; financial capital of the Eurozone; strict sustainability mandates driving innovation.

Companies Involved

HeaderDetails
Developer / Operator Iron Mountain
Strategic Infrastructure Partner Mainova AG / Syna GmbH (Electrical Grid Utilities) & DE-CIX Management GmbH
Construction Contractor Specialized European Mission-Critical EPC & Data Center Engineering Contractors
MEP Engineering Iron Mountain Global Design & High-Density Thermal Engineering Teams
Network Connectivity On-site access to DE-CIX Frankfurt, direct dark-fiber links to FRA-1 and major Frankfurt network nodes (Equinix FR2, Digital Realty Digital Park Ostend), and major tier-1 carrier access.
Power Infrastructure Dual 20kV high-voltage utility feeds, static 2N / N+1 block-redundant uninterruptible power supply (UPS) configuration, and N+1 emergency standby diesel backup generators.

Technical Specifications

HeaderDetails
Power Capacity10.6 MW Critical IT Power Capacity (FRA-2) / 37.6 MW Combined Campus Total
UPS Redundancy2N / N+1 Static UPS Topology
Cooling System High-efficiency air-cooled chilled water system with N+2 cooling plant redundancy, cold aisle containment, free-cooling economization, and liquid-to-chip cooling readiness for high-density AI nodes (up to 20 kW+ per rack).
Connectivity Carrier-neutral platform with dual Meet-Me-Rooms (MMRs), multi-path underground fiber entry vaults, and direct cloud on-ramps (AWS, Azure, Google Cloud).
PUE Target ~1.20 Annualized Operational Design PUE
Energy Mix 100% matched clean renewable energy (wind and solar) backed by European Guarantees of Origin and Iron Mountain Green Power Pass.

Milestones

HeaderDetails
Announcement Acquired Q2 2021
Construction Start Operational Facility (Acquired & Upgraded)
Phase 1 Go-Live Operational
Full Buildout Operational / Active Modernization & AI High-Density Modernization

Investment Details

HeaderDetails
Total InvestmentEstimated €80,000,000 EUR to €120,000,000 EUR
Funding Iron Mountain Inc. corporate capital expenditure (CapEx) allocation