Iron Mountain LON-2 London Slough: 27MW Hyperscale Data Center

Status: Operational / Fully Commissioned Wholesale Facility   |   Location: 110 Buckingham Avenue, Slough Trading Estate, Slough SL1 4PF, United Kingdom


Project Overview

Iron Mountain’s LON-2 is a flagship 27 MW, three-story greenfield data center strategically located on Buckingham Avenue within the renowned Slough Trading Estate, Europe’s leading data center and connectivity hub. Purpose-built to accommodate large-scale wholesale hyperscale deployments and high-density enterprise workloads, the facility delivers approximately 9 MW of customer IT capacity per floor, offering exceptional scalability for cloud providers, AI infrastructure, financial institutions, and global enterprises. As a key component of Iron Mountain’s interconnected London campus alongside LON-1 and LON-3, LON-2 enables customers to expand seamlessly while benefiting from a resilient, carrier-neutral ecosystem. The facility provides ultra-low-latency connectivity to the London Internet Exchange (LINX), direct access to more than 15 on-site Network Service Providers (NSPs), and dual diverse dark-fiber cross-connects to over 200 network operators, cloud providers, and internet exchanges, ensuring high availability and reliable performance for mission-critical applications. Designed with modern power and cooling infrastructure, LON-2 supports high-density computing environments required for artificial intelligence, machine learning, and high-performance computing (HPC) workloads while maintaining operational efficiency and reliability. Sustainability is central to the facility’s operations, with electricity matched by 100% renewable energy, helping customers reduce their environmental impact and meet corporate sustainability goals. Backed by Iron Mountain’s industry-leading physical security, operational expertise, and resilient infrastructure, LON-2 provides a future-ready colocation platform for organisations seeking secure, scalable, and highly connected digital infrastructure in one of Europe’s most important data center markets.


Quick Facts

FieldValue
Project NameIron Mountain LON-2 London Slough: 27MW Hyperscale Data Center
Location110 Buckingham Avenue, Slough Trading Estate, Slough SL1 4PF, United Kingdom
StatusOperational / Fully Commissioned Wholesale Facility
CommissioningPhase 1 Go-Live: Late 2023 / Full Facility Operations: 2024
Total IT Load27 MW Critical IT Load (9 MW per floor across 3 floors)
Total Capacity~32+ MW Total Utility Substation Capacity across 269,097 sq ft (25,000 m²) gross floor area
Tier LevelTier III Equivalent / Concurrent Maintainability (ISO 9001, ISO 14001, ISO 22301, ISO 27001, ISO 50001, BREEAM, PCI-DSS, SOC 2 Type II Certified)
Project TypePurpose-Built Greenfield Wholesale Hyperscale & Enterprise Data Center

City Profile

HeaderDetails
City Namelondon
Population 8.9 Million
Urban Agglomeration9.8 to 11.4 million
City GDP£110.8 billion in 2023
Per Capita Income£69,077 in 2023
City TierTier 1
Key StrengthsGlobal Financial Hub; Dense Connectivity; Low Latency to Europe and North America; large skilled talent pool.

Companies Involved

HeaderDetails
Developer / Operator Iron Mountain
Strategic Infrastructure Partner SEGRO (Slough Trading Estate Landowner), Scottish and Southern Electricity Networks (SSEN Utility)
Construction Contractor Specialized UK & European Mission-Critical EPC & Data Center Contractors
MEP Engineering Iron Mountain Global Design & High-Density Thermal Engineering Teams
Network Connectivity Dual diverse underground fiber entry vaults; direct carrier-neutral access to 15+ NSPs, LINX (London Internet Exchange) peering, dark-fiber campus links to LON-1 and LON-3, and direct low-latency cloud on-ramps.
Power Infrastructure Dual high-voltage grid connections supplied by SSEN, 2N / N+2 block-redundant uninterruptible power supply (UPS) architecture, and standby emergency diesel backup generators with 48+ hours on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity27 MW Critical IT Power Capacity / 32+ MW Utility Substation Feed
UPS Redundancy2N / N+2 Static UPS Topology
Cooling System High-efficiency air-cooled chilled water system with N+2 cooling plant redundancy, hot/cold aisle containment, free-cooling economization, and liquid-to-chip (DLC) cooling readiness for high-density compute nodes.
Connectivity Carrier-neutral platform with multi-path fiber entry points, dual Meet-Me-Rooms (MMRs), and global cloud orchestration via Green Power Pass & ServiceFabric™.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix 100% matched clean renewable energy (wind and solar) backed by REGO certificates and Iron Mountain Green Power Pass accreditation.

Milestones

HeaderDetails
Announcement Q2 2021
Construction Start 2022
Phase 1 Go-Live Q4 2023
Full Buildout Operational

Investment Details

HeaderDetails
Total InvestmentEstimated £150,000,000 GBP to £200,000,000 GBP
Funding Iron Mountain Inc. corporate capital expenditure (CapEx) allocation