Iron Mountain AZP-1 Phoenix Data Center: 41MW Sustainable Colocation Hub

Status: Fully Operational Hub   |   Location: 615 N 48th St, Phoenix, AZ 85008, United States


Project Overview

Iron Mountain’s AZP-1 is a flagship hyperscale-ready data center located in East Phoenix, Arizona, spanning approximately 588,669 square feet across a 39-acre campus. Delivering 41 MW of critical IT capacity, the facility is strategically positioned as a major digital infrastructure hub for east-west internet traffic across the United States, making it an ideal location for hyperscale cloud providers, enterprises, content delivery networks, and artificial intelligence (AI) workloads. AZP-1 is engineered to support high-density colocation environments with rack power capacities of up to 30 kW, enabling modern cloud, AI, and high-performance computing deployments. Designed with sustainability in mind, the facility operates on 100% renewable energy and targets a low design Power Usage Effectiveness (PUE) of approximately 1.2, helping customers reduce operational costs and environmental impact. As a carrier-neutral campus, AZP-1 provides connectivity to more than 25 on-site network providers, offering resilient, low-latency access to regional and national telecommunications networks. The facility is interconnected through a dedicated 100 Gbps dark fiber ring with Iron Mountain’s AZP-2 and AZS-1 campuses in Scottsdale, creating a resilient metropolitan network with seamless access to cloud express on-ramps, hybrid IT platforms, disaster recovery services, and enterprise-grade interconnection solutions. Advanced security, scalable infrastructure, and redundant power and cooling systems further position AZP-1 as one of Arizona’s premier digital infrastructure facilities.


Quick Facts

FieldValue
Project NameIron Mountain AZP-1 Phoenix Data Center: 41MW Sustainable Colocation Hub
Location615 N 48th St, Phoenix, AZ 85008, United States
StatusFully Operational Hub
CommissioningOperational / Strategic Regional Expansion Hub
Total IT Load41 MW Critical IT Power Capacity Allocation
Total Capacity41 MW Critical IT Power across 588,669 sq ft (~54,689 m²) total facility space on a 39-acre campus
Tier LevelUptime Institute Tier III Certified / ISO 27001, ISO 14001, ISO 22301, ISO 50001, ISO 9001, SOC 1, 2 & 3, PCI-DSS, FedRAMP, HIPAA, FISMA, NIST 800-53
Project TypePurpose-Built High-Density Enterprise Colocation, Cloud Ecosystem & Regional Interconnection Hub

City Profile

HeaderDetails
City NamePhoenix
Populationapprox 28,184$
Urban Agglomeration$approx 198,651$
City GDP$approx $10.91$ Billion USD
Per Capita Income$48,362 USD.
City TierSecondary U.S. Data Center Market
Key StrengthsVibrant Economy:

Companies Involved

HeaderDetails
Developer / Operator Iron Mountain
Strategic Infrastructure Partner Arizona Public Service (APS) Utility Network & City of Phoenix Municipal Authorities
Construction Contractor Specialized US Mission-Critical General Contractors
MEP Engineering Iron Mountain In-House Technical Infrastructure & Engineering Teams
Network Connectivity Carrier-neutral platform featuring diverse subterranean fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); on-site ecosystem of 25+ network service providers; direct 100 Gbps dark fiber ring linking to AZP-2 and AZS-1 (Scottsdale).
Power Infrastructure Dedicated on-site 69kV high-voltage utility substation, static distributed 2N+1 / N+1 uninterruptible power supply (UPS) modules, automated switchgear, and backup diesel generator plants with 72+ hours of on-site fuel autonomy at full load.

Technical Specifications

HeaderDetails
Power Capacity41 MW Secured Utility Power Allocation
UPS Redundancy2N+1 / Parallel Redundant Static UPS Architecture
Cooling System High-efficiency cooling plant with air-side free-cooling economizers, N+1 thermal redundancy, high-density airflow management (up to 30 kW/rack), and automated BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps, metro wave links, peering exchanges (DE-CIX, Ninja-IX), and cross-connect options across North American fiber corridors.
PUE Target < 1.20 Annualized Operational Design PUE
Energy Mix 100% Certified Carbon-Free Renewable Energy (100% matched with green power purchase agreements).

Milestones

HeaderDetails
Announcement 2004–2008
Construction Start 2008–2009
Phase 1 Go-Live Operational
Full Buildout Operational Active Facility

Investment Details

HeaderDetails
Total InvestmentEstimated $250,000,000 USD to $400,000,000 USD Cumulative Capital Expenditure
Funding Corporate Capital Expenditure & Infrastructure Financing by Iron Mountain Incorporated