Iron Mountain AZP-3 Phoenix Data Center: 48MW Sustainable Hyperscale Hub
Status: Fully Operational Hyperscale Hub | Location: 4802 E Van Buren St, Phoenix, AZ 85008, USA
Project Overview
Iron Mountain’s AZP-3 is a flagship hyperscale-ready data center located on a 39-acre campus in East Phoenix, Arizona, delivering 48 MW of critical IT capacity across approximately 547,000 square feet of purpose-built infrastructure. Designed to support hyperscale cloud providers, enterprise organizations, and next-generation artificial intelligence (AI) and high-performance computing (HPC) workloads, the facility features approximately 21,000-square-foot data halls capable of supporting up to 6 MW of IT load per hall with flexible high-density power configurations to accommodate evolving compute requirements. AZP-2 is recognized as the first data center in North America to achieve a BREEAM-certified design, highlighting its commitment to sustainable construction and operational efficiency. Powered entirely by 100% certified renewable electricity through Iron Mountain’s Green Power Pass program, the facility is engineered to achieve a low annualised design Power Usage Effectiveness (PUE) of approximately 1.20, reducing both energy consumption and carbon emissions. The campus is interconnected through dedicated high-capacity dark fiber rings with Iron Mountain’s AZP-1 facility in Phoenix and AZS-1 in Scottsdale, providing resilient metropolitan connectivity and enhanced redundancy. As a carrier-neutral facility, AZP-2 offers direct access to more than 40 network providers, major internet exchanges, and leading cloud express on-ramp services, enabling secure hybrid cloud deployments, enterprise interconnection, disaster recovery, and scalable digital infrastructure for mission-critical business and AI-driven applications.
Quick Facts
| Field | Value |
| Project Name | Iron Mountain AZP-3 Phoenix Data Center: 48MW Sustainable Hyperscale Hub |
| Location | 4802 E Van Buren St, Phoenix, AZ 85008, USA |
| Status | Fully Operational Hyperscale Hub |
| Commissioning | Operational / Phased Expansion (Go-Live 2019–2022) |
| Total IT Load | 48 MW Critical IT Power Capacity Allocation |
| Total Capacity | 48 MW Critical IT Load across 547,000 sq ft (~50,818 m²) gross facility footprint on a 39-acre campus |
| Tier Level | Tier III Certified Architecture / BREEAM Design Certified / ISO 27001, ISO 14001, ISO 22301, ISO 45001, ISO 50001, ISO 9001, SOC 1, 2 & 3, PCI-DSS, FedRAMP High, FISMA, HIPAA, NIST 800-53 |
| Project Type | Purpose-Built Hyperscale-Ready, High-Density Colocation & Enterprise Cloud Interconnection Hub |
City Profile
| Header | Details |
| City Name | Phoenix |
| Population | approx 28,184$ |
| Urban Agglomeration | $approx 198,651$ |
| City GDP | $approx $10.91$ Billion USD |
| Per Capita Income | $48,362 USD. |
| City Tier | Secondary U.S. Data Center Market |
| Key Strengths | Vibrant Economy: |
Companies Involved
| Header | Details |
| Developer / Operator | Iron Mountain |
| Strategic Infrastructure Partner | Arizona Public Service (APS) Utility Network & City of Phoenix Municipal Authorities |
| Construction Contractor | Specialized US Mission-Critical General Contractors |
| MEP Engineering | Iron Mountain In-House Technical Infrastructure & Engineering Teams |
| Network Connectivity | Carrier-neutral platform with dual subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); access to 40+ network service providers; direct low-latency optical dark fiber backhaul to AZP-1, AZS-1, and Phoenix peering exchanges. |
| Power Infrastructure | Dedicated on-site high-voltage utility substation access, static distributed 2N+1 / N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt standby diesel generator arrays with 72+ hours of on-site fuel autonomy at full load. |
Technical Specifications
| Header | Details |
| Power Capacity | 48 MW Secured Utility Power Allocation |
| UPS Redundancy | 2N+1 / N+1 Distributed Redundant Static UPS Architecture |
| Cooling System | High-efficiency cooling plant with air-side free-cooling economizers, N+1 thermal redundancy, high-density airflow management, Direct-to-Chip Liquid Cooling (DLC) readiness, and automated BMS environmental controls. |
| Connectivity | Carrier-neutral host offering direct low-latency cloud express on-ramps, metro wave links, peering exchanges (DE-CIX, Ninja-IX), and cross-connect options across North American fiber corridors. |
| PUE Target | < 1.20 Annualized Operational Design PUE |
| Energy Mix | 100% Certified Carbon-Free Renewable Energy (100% matched with green power purchase agreements). |
Milestones
| Header | Details |
| Announcement | 2017–2018 |
| Construction Start | 2018–2019 |
| Phase 1 Go-Live | Operational (2019) |
| Full Buildout | Operational Active Building |
Investment Details
| Header | Details |
| Total Investment | Estimated $300,000,000 USD to $450,000,000 USD Cumulative Capital Expenditure |
| Funding | Corporate Capital Expenditure & Infrastructure Financing by Iron Mountain Incorporated |