Iron Mountain Phoenix Campus: Sustainable Hyperscale & Enterprise Hub in Arizona
Status: Fully Operational Campus with Active Multi-Phase Expansion | Location: 615 North 48th Street & 4802 East Van Buren Street, Phoenix, AZ 85008, United States
Project Overview
Iron Mountain’s Phoenix Campus is a premier mission-critical data center hub located on a 39-acre site approximately 10 minutes east of downtown Phoenix, Arizona. Upon full buildout, the campus will deliver more than 125 MW of critical IT capacity across over 1 million square feet of purpose-built digital infrastructure, making it one of the largest hyperscale data center developments in the southwestern United States. The campus comprises three major facilities: AZP-1 (41 MW), AZP-2 (48 MW), and the planned AZP-3 expansion, which will add approximately 36 MW of capacity across 230,000 square feet. Designed to support hyperscale cloud providers, artificial intelligence (AI) and high-performance computing (HPC) environments, content delivery networks, and mission-critical enterprise applications, the campus offers scalable, high-density infrastructure for next-generation digital workloads. Sustainability is a core focus, with all facilities powered by 100% certified renewable electricity through Iron Mountain’s Green Power Pass program. The campus also incorporates dedicated on-site utility substations, energy-efficient zero-water cooling technologies, and resilient redundant power systems to ensure high availability and operational efficiency. High-capacity dark fiber ring connectivity links the campus directly to regional carrier hotels, internet exchanges, and major cloud express on-ramp services, providing low-latency, carrier-neutral interconnection. Combined with advanced security, flexible expansion capabilities, and resilient infrastructure, Iron Mountain’s Phoenix Campus serves as a strategic digital gateway for cloud, enterprise, and AI-driven computing across North America.
Quick Facts
| Field | Value |
| Project Name | Iron Mountain Phoenix Campus: Sustainable Hyperscale & Enterprise Hub in Arizona |
| Location | 615 North 48th Street & 4802 East Van Buren Street, Phoenix, AZ 85008, United States |
| Status | Fully Operational Campus with Active Multi-Phase Expansion |
| Commissioning | Operational (AZP-1 & AZP-2) / AZP-3 in Active Development |
| Total IT Load | 125+ MW Total Planned Critical IT Power Capacity (89 MW across AZP-1 & AZP-2; +36 MW for AZP-3) |
| Total Capacity | 125+ MW Total IT Power Capacity across a 39-acre campus footprint with >1,000,000 sq ft (>92,900 m²) total facility space |
| Tier Level | Tier III Certified Architecture / First BREEAM Design-Certified Facility in NA (AZP-2) / ISO 27001, ISO 14001, ISO 22301, ISO 45001, ISO 50001, ISO 9001, SOC 1, 2 & 3, PCI-DSS, FedRAMP High, FISMA, HIPAA, NIST 800-53 |
| Project Type | Purpose-Built Master-Planned Hyperscale, High-Density Colocation & Cloud Interconnection Campus |
City Profile
| Header | Details |
| City Name | Phoenix |
| Population | approx 28,184$ |
| Urban Agglomeration | $approx 198,651$ |
| City GDP | $approx $10.91$ Billion USD |
| Per Capita Income | $48,362 USD. |
| City Tier | Secondary U.S. Data Center Market |
| Key Strengths | Vibrant Economy: |
Companies Involved
| Header | Details |
| Developer / Operator | Iron Mountain |
| Strategic Infrastructure Partner | Arizona Public Service (APS) Utility Network & City of Phoenix Municipal Authorities |
| Construction Contractor | Specialized US Mission-Critical General Contractors |
| MEP Engineering | Iron Mountain In-House Technical Infrastructure & Engineering Teams |
| Network Connectivity | Carrier-neutral platform featuring diverse subterranean fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); on-site ecosystem of 25+ network service providers; direct 100 Gbps dark fiber ring linking AZP-1, AZP-2, AZP-3, and AZS-1 (Scottsdale). |
| Power Infrastructure | Dedicated high-voltage utility substation access, static distributed 2N+1 / N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt standby diesel generator arrays with multi-day on-site fuel autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | 125+ MW Total Secured Utility Power Allocation across the campus |
| UPS Redundancy | 2N+1 / N+1 Distributed Redundant Static UPS Architecture |
| Cooling System | High-efficiency cooling plant with air-side free-cooling economizers, N+1 thermal redundancy, high-density airflow management, Direct-to-Chip Liquid Cooling (DLC) readiness, and automated BMS environmental controls. |
| Connectivity | Carrier-neutral host offering direct low-latency cloud express on-ramps, metro wave links, peering exchanges (DE-CIX, Ninja-IX), and cross-connect options across North American fiber corridors. |
| PUE Target | < 1.20 Annualized Operational Design PUE |
| Energy Mix | 100% Certified Carbon-Free Renewable Energy (100% matched with green power purchase agreements). |
Milestones
| Header | Details |
| Announcement | 2008 (AZP-1 Initial Campus Expansion) / 2017 (AZP-2) / 2023 (AZP-3) |
| Construction Start | 2008 (AZP-1) / 2018 (AZP-2) / 2024 (AZP-3) |
| Phase 1 Go-Live | Operational (AZP-1 in service; AZP-2 launched 2019) |
| Full Buildout | Active Multi-Building Operational & Expansion Campus |
Investment Details
| Header | Details |
| Total Investment | Estimated $750,000,000 USD to $1,100,000,000 USD Total Campus Capital Expenditure |
| Funding | Corporate Capital Expenditure & Infrastructure Financing by Iron Mountain Incorporated |