Iron Mountain Navi Mumbai: 85MW AI & Hyperscale Data Center Expansion
Status: Active Operational Phase (MUM-1 & MUM-2) / Under Construction (85MW AI Expansion Campus) | Location: TTC Industrial Area, Sector-8, Rabale, Navi Mumbai, Maharashtra 400701, India
Project Overview
Iron Mountain Data Centers’ Navi Mumbai campus in Rabale represents a flagship 85 MW AI-ready hyperscale expansion that significantly strengthens India’s rapidly growing digital infrastructure landscape. Building upon the company’s operational MUM-1 (2.3 MW) and MUM-2 (6.0 MW) facilities, the new A$100 million+ (₹828 crore) development spans 4.78 acres and comprises two state-of-the-art high-density data center buildings with nearly 1.5 million square feet of total construction space. Strategically located in Navi Mumbai, one of India’s leading connectivity and technology hubs, the campus is purpose-built to support hyperscale cloud providers, multinational enterprises, and the increasing demands of artificial intelligence (AI), machine learning, and high-performance computing (HPC) workloads. Designed for next-generation GPU clusters, the campus incorporates advanced liquid cooling architectures that enable high-density rack deployments while improving energy efficiency and thermal performance. Its strategic location provides direct access to Navi Mumbai’s subsea cable landing infrastructure, enhancing international connectivity and enabling low-latency data transmission to global markets. The campus also offers a highly connected carrier-neutral ecosystem with access to more than 200 Internet Service Providers (ISPs) and direct peering through major Internet Exchanges, including DE-CIX, Extreme-IX, and NIXI, ensuring resilient, high-performance network connectivity. Sustainability is a key component of the development, with 100% renewable power matching through Iron Mountain’s Green Power Pass programme, helping customers achieve ambitious environmental goals while supporting large-scale digital operations. Combined with enterprise-grade security, resilient infrastructure, and scalable AI-ready design, the Navi Mumbai campus provides a future-ready platform for cloud, AI, and mission-critical digital services across India and the Asia-Pacific region.
Quick Facts
| Field | Value |
| Project Name | Iron Mountain Navi Mumbai: 85MW AI & Hyperscale Data Center Expansion |
| Location | TTC Industrial Area, Sector-8, Rabale, Navi Mumbai, Maharashtra 400701, India |
| Status | Active Operational Phase (MUM-1 & MUM-2) / Under Construction (85MW AI Expansion Campus) |
| Commissioning | MUM-1/MUM-2: Operational / 85MW AI Campus Phase 1 Go-Live: 2027 (Full campus buildout through 2028) |
| Total IT Load | 8.3 MW Operational (MUM-1 & MUM-2) + 85 MW Critical IT Load (New Hyperscale AI Expansion) |
| Total Capacity | 93.3 MW Total IT Capacity across 4.78-acre expanded campus (1,487,513 sq ft total construction area) |
| Tier Level | Tier III Certified Design & Facility (Uptime Institute Tier III, ISO 27001, ISO 14001, ISO 50001, PCI-DSS, SOC 2/3 Certified) |
| Project Type | Purpose-Built Greenfield AI Factory, Hyperscale Cloud & Carrier-Neutral Colocation Campus |
City Profile
| Header | Details |
| City Name | Navi Mumbai |
| Population | ~1.12 million |
| Urban Agglomeration | 22+ million (Mumbai Metropolitan Region) |
| City GDP | Part of the Mumbai Metropolitan Region economy, one of India's largest economic centers |
| Per Capita Income | Approximately ₹350,000–₹450,000 per year |
| City Tier | Tier 1 |
| Key Strengths | Planned urban infrastructure, IT parks, business hubs, JNPT port connectivity, excellent transportation network, educational institutions, growing data center ecosystem |
Companies Involved
| Header | Details |
| Developer / Operator | Iron Mountain |
| Strategic Infrastructure Partner | MSEDCL (Electrical Utility), MIDC, Sterling & Wilson (EPC Contractor), and Arwade Infrastructure |
| Construction Contractor | Sterling & Wilson Limited (Turnkey EPC Contractor) & Arwade Infrastructure Limited (Civil Works) |
| MEP Engineering | Rathi Associates & Apices Studio Private Limited (Design/Architecture) / JLL India (PMC) |
| Network Connectivity | Dual geodiverse underground fiber entry vaults; direct carrier-neutral access to 9+ major telcos and 200+ ISPs; direct peering on DE-CIX, Extreme-IX, and NIXI; low-latency subsea routes to Mumbai landing stations. |
| Power Infrastructure | Dual high-voltage grid utility feeds supplied by MSEDCL, static 2N / N+1 block-redundant uninterruptible power supply (UPS) architecture, and 2N standby diesel backup generators with 48+ hours of on-site fuel supply. |
Technical Specifications
| Header | Details |
| Power Capacity | 8.3 MW Operational / 85 MW New Hyperscale AI Capacity |
| UPS Redundancy | 2N / N+1 Static UPS Topology |
| Cooling System | High-efficiency closed-loop chilled water cooling systems, hot/cold aisle containment, and liquid-to-chip direct cooling infrastructure engineered to support dense AI nodes and GPU clusters (20 kW to 50 kW+ per rack). |
| Connectivity | Carrier-neutral platform with dual Meet-Me-Rooms (MMRs), high-speed dark fiber DCI links to Mumbai CBD and BKC, and global cloud on-ramps. |
| PUE Target | < 1.30 Annualized Operational Design PUE |
| Energy Mix | 100% matched clean renewable energy supported by Iron Mountain's Green Power Pass, on-site solar PV array, and regional green tariffs. |
Milestones
| Header | Details |
| Announcement | Groundbreaking: January 2026 |
| Construction Start | Q1 2026 (Substructure & Excavation Underway) |
| Phase 1 Go-Live | Operational (MUM-1 & MUM-2) / 2027 (85MW AI Expansion Phase 1) |
| Full Buildout | 2027–2028 (Completion of two 85MW expansion towers) |
Investment Details
| Header | Details |
| Total Investment | Estimated ₹828 Crore INR (~$100,000,000+ USD CapEx for 85MW AI Expansion) |
| Funding | Iron Mountain Data Centers corporate capital expenditure (CapEx) allocation |