KevlinX Brussels Data Center Campus: 32MW+ AI-Ready Hub

Status: Operational / Phased Active Expansion   |   Location: Av. Antoon Van Oss 1, 1120 Brussels, Belgium


Project Overview

KevlinX’s Brussels Data Center Campus, comprising the BRU01 and BRU02 facilities, is Belgium’s largest multi-tenant, carrier-neutral commercial digital infrastructure hub, strategically located in the northern Brussels-Capital Region. Designed to support the rapidly growing demand for hyperscale cloud computing, artificial intelligence (AI), machine learning (ML), high-performance computing (HPC), and enterprise digital transformation, the campus delivers more than 32 MW of critical IT power across a purpose-built 25,400-square-metre site. Developed with scalability and operational resilience in mind, the campus provides flexible colocation solutions for hyperscale cloud providers, financial institutions, government organizations, telecommunications operators, and multinational enterprises requiring mission-critical infrastructure. The facilities are engineered to support ultra-high-density computing environments, accommodating rack power densities ranging from 60 kW to more than 150 kW per rack through advanced liquid cooling readiness, making the campus well suited for next-generation GPU clusters and AI workloads. Sustainability is central to the campus design, with operations powered entirely by 100% renewable energy and an industry-leading design Power Usage Effectiveness (PUE) of less than 1.20, maximizing energy efficiency while reducing environmental impact. As a highly connected carrier-neutral platform, the campus provides resilient fiber connectivity and ultra-low-latency network access of less than five milliseconds to Europe’s major digital hubs, including London, Paris, Amsterdam, and Frankfurt, enabling seamless hybrid and multi-cloud deployments. Combining sustainable operations, AI-ready infrastructure, exceptional connectivity, and scalable capacity, KevlinX’s Brussels Data Center Campus provides a future-ready digital infrastructure platform supporting the continued growth of cloud services, AI innovation, and enterprise digital ecosystems across Europe.


Quick Facts

FieldValue
Project NameKevlinX Brussels Data Center Campus: 32MW+ AI-Ready Hub
LocationAv. Antoon Van Oss 1, 1120 Brussels, Belgium
StatusOperational / Phased Active Expansion
CommissioningPhase 1 Go-Live: Early 2026 / Active Multi-Phase Buildout
Total IT Load32 MW Critical IT Power Allocation (expandable up to 68 MW campus utility allocation)
Total Capacity32+ MW to 68 MW Total Utility Capacity across 25,400 m² site area (~11,350 m² whitespace)
Tier LevelTier III Certified Architecture (Uptime Institute Standards) / BREEAM Certified, ISO 27001, PCI-DSS
Project TypePurpose-Built Carrier-Neutral Hyperscale, High-Density AI-Ready Colocation & Cloud Hub

City Profile

HeaderDetails
City NameBrussels
Population~190,000 (Brussels City)
Urban Agglomeration~2.1 million (Brussels Metropolitan Area)
City GDP~€90 billion (Brussels-Capital Region)
Per Capita Income~€55,000
City TierTier 1 – European Political, Financial & Business Hub
Key StrengthsCapital of Belgium and the European Union; headquarters of major EU institutions and international organizations; strong financial services sector; advanced telecommunications infrastructure; growing data center market; strategic location in Western Europe; excellent rail, road, and air connectivity; multilingual skilled workforce; strong presence of technology, consulting, and professional services companies.

Companies Involved

HeaderDetails
Developer / Operator KevlinX Data Centers
Strategic Infrastructure Partner Elia / Sibelga (Electric Utilities) & BDIA (Belgian Digital Infrastructure Association)
Construction Contractor BESIX & Equans
MEP Engineering Ingenium & KevlinX In-House Global Engineering Teams
Network Connectivity Carrier-neutral platform with 6 diverse underground fiber entrances; redundant Meet-Me-Rooms (MMRs); direct connectivity to BNIX (Belgian National Internet Exchange) and major European Tier-1 transit operators.
Power Infrastructure Dual high-voltage grid connections, static distributed 2N / N+1 medium-voltage uninterruptible power supply (UPS) modules, automated switchgear, and standby generator plants with 99.999% availability SLAs.

Technical Specifications

HeaderDetails
Power Capacity32 MW – 68 MW Total Utility Power Allocation
UPS Redundancy2N / N+1 Distributed Redundant Static UPS Architecture
Cooling System Highly efficient Indirect Evaporative Cooling (IEC) with hot aisle containment, Direct-to-Chip Liquid Cooling (DLC) readiness for high-density GPU/AI racks (up to 150+ kW/rack), and automated BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps and cross-connect options across European networks.
PUE Target < 1.20 Annualized Operational Design PUE
Energy Mix 100% Certified Green Renewable Energy with corporate commitment to carbon neutrality by 2030.

Milestones

HeaderDetails
Announcement September 2021
Construction Start September 2023
Phase 1 Go-Live Operational (Early 2026)
Full Buildout Active Multi-Building Campus Expansion

Investment Details

HeaderDetails
Total InvestmentEstimated €150,000,000 EUR to €250,000,000 EUR
Funding Corporate Capital Expenditure & Infrastructure Equity Financing by KevlinX