Khazna AUH3 Abu Dhabi Data Center: Hyperscale Cloud & AI Hub in UAE
Status: Fully Operational Hyperscale Facility | Location: Sector 33 - Abu Dhabi - United Arab Emirates
Project Overview
Khazna AUH3 is a state-of-the-art hyperscale data center facility strategically located in Abu Dhabi, representing one of the newest and most advanced expansions within Khazna Data Centers' rapidly growing digital infrastructure portfolio. Designed to meet the increasing demand for cloud computing, artificial intelligence, and large-scale enterprise workloads, AUH3 delivers approximately 30 MW of critical IT capacity across a 21,000 m² campus featuring 12 modular data halls that enable flexible and phased deployment. The modular architecture allows customers to efficiently scale their infrastructure while maintaining high operational efficiency and reliability, making the facility suitable for hyperscale cloud providers, government organizations, financial institutions, and enterprises with mission-critical digital operations. Purpose-engineered for next-generation computing, AUH3 supports high-density rack deployments required for AI training clusters, machine learning platforms, big data analytics, and high-performance computing (HPC) environments. The facility incorporates ultra-redundant electrical and mechanical infrastructure, resilient utility connections, backup power generation, advanced UPS systems, and energy-efficient cooling technologies that ensure continuous operation while optimizing energy performance. Multiple layers of physical security, including biometric access controls, comprehensive CCTV surveillance, and 24/7 security monitoring, safeguard customer infrastructure and sensitive data. Strategically positioned within Abu Dhabi's expanding digital ecosystem, AUH3 provides low-latency connectivity to major telecommunications networks, cloud service providers, internet exchanges, and regional fiber routes, enabling seamless interconnection across the UAE and international markets. The facility also supports hybrid cloud architectures, disaster recovery, business continuity, and private network deployments, offering enterprises a secure and resilient platform for digital transformation. As one of Khazna's flagship hyperscale developments, AUH3 plays a significant role in advancing the UAE's ambitions to become a regional leader in cloud services, artificial intelligence, sovereign digital infrastructure, and next-generation data center innovation while supporting the country's long-term economic diversification and smart nation initiatives.
Quick Facts
| Field | Value |
| Project Name | Khazna AUH3 Abu Dhabi Data Center: Hyperscale Cloud & AI Hub in UAE |
| Location | Sector 33 - Abu Dhabi - United Arab Emirates |
| Status | Fully Operational Hyperscale Facility |
| Commissioning | Operational (Commissioned 2021–2022) |
| Total IT Load | ~30 MW Critical IT Power Capacity Allocation |
| Total Capacity | ~21,000 m² (~226,042 sq ft) gross facility footprint / 12-pod modular design |
| Tier Level | Uptime Institute Tier III Certified Design & Constructed Facility (TCCF) / ISO 27001, ISO 22301, ISO 14001, ISO 9001, SOC 1 Type II, SOC 2 Type II Compliant |
| Project Type | Purpose-Built Multi-Tenant Wholesale Hyperscale & AI Infrastructure Colocation Hub |
City Profile
| Header | Details |
| City Name | Abu Dhabi |
| Population | ~1.6 Million (City) |
| Urban Agglomeration | ~3.8 Million (Emirate) |
| City GDP | ~$310 Billion USD (Emirate) |
| Per Capita Income | ~$82,000 USD |
| City Tier | Tier 1 Global Hub |
| Key Strengths | Nuclear Power, Sovereign Funding, Strategic Neutrality |
Companies Involved
| Header | Details |
| Developer / Operator | Khazna Data Centers |
| Strategic Infrastructure Partner | Abu Dhabi Distribution Company (ADDC) / Abu Dhabi Department of Energy & Municipal Authorities |
| Construction Contractor | McLaren Construction / Specialized Regional EPC Contractors |
| MEP Engineering | Specialized Global Mission-Critical Engineering Consultants / Khazna In-House Teams |
| Network Connectivity | Carrier-neutral facility featuring dual path-diverse subterranean fiber entrance vaults, redundant Meet-Me-Rooms (MMRs), direct dark fiber backhaul to e& (Etisalat) and du telecom networks, and direct interconnection to UAE-IX. |
| Power Infrastructure | Dual high-voltage 33kV utility grid feeds from ADDC, static 2N / Block Redundant uninterruptible power supply (UPS) configurations, automated switchgear, and multi-megawatt emergency standby diesel generator arrays with 72-hour on-site fuel autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | ~30 MW Total IT Utility Capacity Allocation |
| UPS Redundancy | 2N / Block Redundant Static UPS Architecture |
| Cooling System | High-efficiency closed-loop chilled water cooling plant, N+2 chillers, CRAH units with variable speed drives, hot/cold aisle containment, Direct-to-Chip Liquid Cooling (DLC) readiness for high-density AI clusters, and automated BMS environmental controls. |
| Connectivity | Private high-bandwidth fiber optic mesh connecting AUH3 directly to Khazna AUH1, AUH2, AUH4, and DXB cluster facilities, offering direct cross-connects and hybrid cloud interconnections. |
| PUE Target | < 1.35 Annualized Operational Design PUE |
| Energy Mix | Grid utility power integrated with Abu Dhabi's clean energy transition initiatives (ENEC Nuclear & EWEC Solar integration). |
Milestones
| Header | Details |
| Announcement | 2020 |
| Construction Start | 2020–2021 |
| Phase 1 Go-Live | Operational (2021–2022) |
| Full Buildout | Fully Operational Active Facility |
Investment Details
| Header | Details |
| Total Investment | Estimated $220,000,000 USD to $260,000,000 USD Facility Capital Expenditure |
| Funding | Joint Venture Capital (G42 / e& - Emirates Telecommunications Group) |