LinkBermuda Teleport: Tier 3 5MW Strategic Edge Node
Status: Active / Operational | Location: 1 Middle Rd, Devonshire, FL 01, Bermuda
Project Overview
The LinkBermuda Teleport Data Center is Bermuda’s leading mission-critical digital infrastructure facility, strategically designed to provide exceptional resilience, connectivity, and operational reliability for both regional and international clients. Functioning as a major subsea cable landing station and satellite communications ground hub, the facility plays a central role in Bermuda’s telecommunications and global data connectivity ecosystem. Positioned on the island’s highest central elevation to naturally reduce flood exposure, the purpose-built bunker-style campus is specifically engineered to withstand extreme weather conditions, including Category 5 hurricanes and severe Atlantic storm activity The campus houses two separate SOC 2 Type II certified facilities the DC-1 Hosting Center and the eBusiness Solutions Center (eBSC) both equipped with advanced security systems, redundant power infrastructure, environmental controls, and high-availability network architecture. The facility supports Bermuda’s financial institutions, international reinsurance firms, cloud providers, and space industry organizations that require secure low-latency connectivity, disaster resilience, and reliable transatlantic interconnection to North American and global networks.
Quick Facts
| Field | Value |
| Project Name | LinkBermuda Teleport: Tier 3 5MW Strategic Edge Node |
| Location | 1 Middle Rd, Devonshire, FL 01, Bermuda |
| Status | Active / Operational |
| Commissioning | Originally operational in 2000; network and infrastructure structural upgrades continuously deployed through 2026 |
| Total IT Load | ~3.5 MW net critical IT workload |
| Total Capacity | 5.0 Megawatts (5 MW) gross utility and standby infrastructure footprint |
| Tier Level | Tier III Compliant (Dual-path, concurrently maintainable architecture) |
| Project Type | Subsea Cable Landing Station (CLS) & Teleport Colocation Facility |
City Profile
| Header | Details |
| City Name | Devonshire |
| Population | 7,000 |
| Urban Agglomeration | ~64,000 (Bermuda total urban population) |
| City GDP | ~US$7.5 billion (Bermuda economy contribution) |
| Per Capita Income | ~US$85,000 annually |
| City Tier | Tier 3 Parish / Administrative Region |
| Key Strengths | International business services, tourism, financial services, residential communities, strong digital connectivity |
Companies Involved
| Header | Details |
| Developer / Operator | LinkBermuda |
| Strategic Infrastructure Partner | Bragg Group (Canada) & Eastlink Business Services |
| Construction Contractor | Leading Regional Marine-Grade Structural Engineering Firms |
| MEP Engineering | LinkBermuda Global Infrastructure Planning & Engineering Division |
| Network Connectivity | Native termination of 5 major undersea fiber optic systems linking Bermuda directly to the US, Canada, Europe, and Latin America |
| Power Infrastructure | Bermuda Electric Light Company (BELCO) Bulk Utility Network |
Technical Specifications
| Header | Details |
| Power Capacity | 5 MW gross capacity supporting diverse high-density power loops up to 12 kW per rack |
| UPS Redundancy | $2N$ block-redundant static UPS modules paired with dual industrial diesel generator banks |
| Cooling System | $N+1$ closed-loop precision HVAC air-conditioning arrays integrated with Novec 1230 gas fire suppression systems |
| Connectivity | Carrier-neutral facility with fully diverse, concrete-hardened subterranean network vaults |
| PUE Target | $\le 1.45$ climate-optimized average annual operation for sub-tropical island conditions |
| Energy Mix | Integrated directly into the BELCO grid, scaling alongside regional clean energy and fuel diversification initiatives |
Milestones
| Header | Details |
| Announcement | Initial development framework established in late 1999 |
| Construction Start | Ground broken Q1 2000 |
| Phase 1 Go-Live | Operational deployment finalized Q4 2000 |
| Full Buildout | Core expansion and subsea landing systems fully active; continuous hardware modernization tracked through May 2026 |
Investment Details
| Header | Details |
| Total Investment | Multi-million dollar ongoing capital deployment across multi-decade facility lifecycle |
| Funding | Corporate capital allocation and infrastructure investment lines from parent Bragg Group |