Maincubes BER01 Berlin Data Center: Go West Campus Colocation Specs

Status: Operational   |   Location: Mecklenburgische Straße 32 (Go West Campus), 14197 Berlin, Germany


Project Overview

The maincubes BER01 data center, located within the Go West urban business campus in Berlin-Schmargendorf, Germany, is a modern colocation facility designed to support the growing requirements of enterprise, cloud, and artificial intelligence workloads. The facility provides up to 9 MW of critical IT capacity across approximately 5,100 m² of technical whitespace, offering scalable infrastructure for customers deploying high-density computing environments and demanding digital applications. BER01 combines resilient data center infrastructure with an emphasis on energy efficiency and sustainable operations, making it well suited to organizations seeking reliable capacity while meeting environmental objectives. Its cooling architecture incorporates advanced adiabatic cooling technology to improve thermal efficiency, while the facility is also prepared for immersion cooling applications, allowing it to accommodate future generations of high-density computing hardware and AI systems. A notable feature of the development is its approach to waste heat utilization, with excess heat generated by the data center designed for reuse within the surrounding Go West quarter, supporting a more circular energy model and reducing unnecessary heat discharge. BER01 also operates using 100% renewable energy, helping customers reduce the carbon footprint associated with their digital infrastructure. The facility’s Blue Angel certification further reflects its focus on environmentally responsible data center operations and resource efficiency. With its strategic Berlin location, substantial IT capacity, advanced cooling capabilities, renewable energy sourcing, and integrated waste heat recovery strategy, maincubes BER01 provides a sustainable and future-ready platform for enterprises, cloud providers, and AI-driven workloads requiring high-performance colocation infrastructure in the German capital.


Quick Facts

FieldValue
Project NameMaincubes BER01 Berlin Data Center: Go West Campus Colocation Specs
LocationMecklenburgische Straße 32 (Go West Campus), 14197 Berlin, Germany
StatusOperational
Commissioning2025
Total IT Load8.2 MW – 9.0 MW Critical IT Power Capacity
Total Capacity5,100 m² (~55,000 sq ft) technical whitespace across 12 data center suites
Tier LevelDIN EN 50600 VK3 / Tier III Equivalent Standards
Project TypePurpose-Built High-Density Colocation & Cloud/AI Compute Hub

City Profile

HeaderDetails
City NameBerlin
Population~3.7 million (city proper)
Urban Agglomeration~6.2–6.3 million
City GDP~€180–€200 billion
Per Capita Income~€45,000–€55,000
City TierAlpha Global City / Tier 1 World City
Key StrengthsStrong startup and tech ecosystem

Companies Involved

HeaderDetails
Developer / Operator maincubes Asset Management
Strategic Infrastructure Partner DTCP (Digital Transformation Capital Partners), GoWest Campus Developers, Regional Utility Providers
Construction Contractor Mission-Critical Engineering Contractors & Data Center Specialists
MEP Engineering maincubes Infrastructure Engineering & Thermal Architecture Teams
Network Connectivity Carrier-neutral facility with path-diverse dark fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), and direct low-latency cross-connects to primary Internet Exchanges (e.g., BCIX, DE-CIX) and global cloud gateways.
Power Infrastructure Redundant high-voltage commercial utility feeds, N+2 / N+1 static and rotating uninterruptible power supply (UPS) configurations, automatic transfer switchgear (ATS), and standby backup diesel generators with localized bulk fuel storage.

Technical Specifications

HeaderDetails
Power Capacity~11.0 MVA Dedicated Utility Grid Substation Allocation
UPS RedundancyConcurrently Maintainable N+2 / N+1 Static & Rotating UPS Systems
Cooling System Highly efficient adiabatic cooling, closed-loop chilled water distribution, cold-aisle containment, with hardware readiness for high-density Direct-to-Chip Liquid Cooling (DLC) and Immersion Cooling up to 40 kW+ per rack.
Connectivity Sub-millisecond optical dark fiber routes connecting Berlin-Schmargendorf directly to central Berlin carrier hubs, Frankfurt IX backbones, and European network rings.
PUE Target < 1.26 Annualized Operational Design PUE
Energy Mix 100% Certified Renewable Energy with waste heat export to adjacent community buildings.

Milestones

HeaderDetails
Announcement Operational Facility
Construction Start Completed / Active Operation
Phase 1 Go-Live Operational
Full Buildout Active Commercial Colocation Center

Investment Details

HeaderDetails
Total Investment~$70,000,000 – $90,000,000 EUR (Estimated Facility Capital Expenditure)
Funding Corporate Capital Expenditure (maincubes / DTCP)