Project Overview
MC Digital Realty’s Osaka Data Center Campus in the Saito region (Minoh/Ibaraki) is Kansai’s flagship hyperscale digital infrastructure hub, delivering more than 70 MW of critical IT capacity across four purpose-built, multi-story facilities—KIX10, KIX11 (28 MW), KIX12, and KIX13 (21 MW). Strategically located within one of Japan’s fastest-growing technology corridors, the campus is designed to support hyperscale cloud providers, enterprise digital transformation, content platforms, and next-generation generative AI workloads requiring high-density computing environments. Engineered for exceptional resilience, the facilities incorporate advanced base-isolation seismic damper technology that minimizes structural impact during major earthquakes, ensuring continuous operations in one of the world’s most seismically active regions. The campus is powered by dual independent 77kV extra-high-voltage utility substation feeds, providing robust power redundancy and scalable electrical capacity for future expansion. To meet evolving AI infrastructure requirements, the campus is also designed with liquid-cooling integration readiness, enabling support for high-density GPU clusters and next-generation accelerated computing. Its connectivity infrastructure includes direct dark fiber interconnections to Osaka’s central business district and major subsea cable hubs, ensuring low-latency access to domestic and international networks. Customers also benefit from direct peering through ServiceExchange, JPNAP, JPIX, and BBIX, allowing seamless cloud connectivity and high-performance data exchange. As one of Japan’s most advanced interconnected campuses, MC Digital Realty’s Osaka facility plays a critical role in strengthening the country’s digital economy while providing secure, scalable, and highly resilient infrastructure for regional and global businesses.
Quick Facts
| Field | Value |
| Project Name | MC Digital Realty Osaka KIX Campus: 70MW Hyperscale & AI Hub |
| Location | Saito Aokita & Saito Yamabuki District, Minoh-shi / Ibaraki-shi, Osaka 562-0029, Japan |
| Status | Operational (KIX10, KIX11, KIX12, KIX13) / Active High-Density & AI Density Upgrades |
| Commissioning | Campus Launch (KIX10): 2017 / KIX11: 2019 / KIX12: 2021 / KIX13 Phase Launch: Q1 2023 |
| Total IT Load | 70+ MW Total Critical IT Load Capacity across campus (KIX10: 8 MW, KIX11: 28 MW, KIX12: 13 MW, KIX13: 21 MW) |
| Total Capacity | 70+ MW Critical IT Capacity across 23,000 m² campus land area and 58,000 m² (625,000 sq ft) total colocation space |
| Tier Level | Tier III Certified / Seismic Isolation Architecture (ISO 27001, ISO 14001, ISO 9001, PCI-DSS, SOC 1/2/3 Certified) |
| Project Type | Purpose-Built Greenfield Hyperscale, High-Density AI Cloud Gateway & Carrier-Neutral Colocation Campus |
City Profile
| Header | Details |
| City Name | Osaka |
| Population | ~2.7 Million (Osaka City) |
| Urban Agglomeration | ~19.3 Million (Kansai Metropolitan Area) |
| City GDP | Significant regional economic engine of Japan |
| Per Capita Income | High |
| City Tier | Tier 1/Emerging Hyperscale Hub (Complementary to Tokyo) |
| Key Strengths | Second-largest metropolitan economy, robust infrastructure, growing hyperscale cloud region status, lower seismic risk than parts of Tokyo. |
Companies Involved
| Header | Details |
| Developer / Operator | Digital Realty |
| Strategic Infrastructure Partner | Kansai Electric Power Company (KEPCO Utility) & JPNAP / JPIX / BBIX (Internet Exchange Partners) |
| Construction Contractor | Specialized Japanese Tier 1 Mission-Critical EPC & General Contractors (Obayashi / Kajima / Shimizu) |
| MEP Engineering | MC Digital Realty Global Engineering & High-Density Thermal Design Teams |
| Network Connectivity | Dual geodiverse underground fiber entry vaults; direct campus mesh dark fiber connecting KIX10–KIX13; carrier-neutral platform with access to 15+ network service providers; direct interconnection to JPNAP, JPIX, and BBIX; direct subsea cable gateway access connecting Osaka to US and APAC. |
| Power Infrastructure | Dual extra-high-voltage 77kV utility substation feeds supplied by KEPCO, static 2N / block-redundant uninterruptible power supply (UPS) topology, and 2N emergency standby diesel generators with 48+ hours on-site fuel supply. |
Technical Specifications
| Header | Details |
| Power Capacity | 70+ MW Critical IT Power Capacity (28 MW KIX11 + 21 MW KIX13 + 13 MW KIX12 + 8 MW KIX10) |
| UPS Redundancy | 2N / Block Redundant Static UPS Topology |
| Cooling System | High-efficiency air-cooled chillers with N+1/N+2 redundancy, dual-water loop distribution, hot/cold aisle containment, and liquid-to-chip direct cooling infrastructure capable of supporting high-density GPU clusters (30 kW to 80 kW+ per rack). |
| Connectivity | Carrier-neutral platform with dual Meet-Me-Rooms (MMRs), high-speed fiber cross-connects, and low-latency cloud direct-connect access (AWS Direct Connect, Azure ExpressRoute, Google Cloud Interconnect). |
| PUE Target | < 1.30 Annualized Operational Design PUE |
| Energy Mix | 100% matched clean renewable power options supported by Japanese Non-Fossil Certificates (NFCs) and solar PPAs. |
Milestones
| Header | Details |
| Announcement | Campus Launch: 2017 / KIX13 Building Launch: February 2023 |
| Construction Start | 2016 (Initial Groundbreaking) / Continuous multi-building expansion through 2023 |
| Phase 1 Go-Live | 2017 (KIX10) / 2019 (KIX11) / 2021 (KIX12) / 2023 (KIX13) |
| Full Buildout | Operational (Active Whitespace Expansion & AI Density Modernization) |
Investment Details
| Header | Details |
| Total Investment | Estimated ¥50,000,000,000 JPY to ¥70,000,000,000 JPY (~$450,000,000 USD to $600,000,000 USD Total Campus Investment) |
| Funding | MC Digital Realty (Digital Realty & Mitsubishi Corporation JV CapEx allocation) |