Ascenty Santiago Data Center Campus: 42MW Cloud & Enterprise Hub

Status: Operational (Santiago 1 & 2) / Active Expansion (Santiago 3 Under Construction)   |   Location: Guacolda 2100, Comuna de Quilicura, Santiago, Región Metropolitana, 8710067, Chile


Project Overview

Ascenty’s Santiago Data Center Campus in Quilicura stands as one of the most advanced and strategically important carrier-neutral digital infrastructure hubs in Chile and the wider Southern Cone region. Spanning approximately 51,000 m² across three purpose-built facilities Santiago 1, Santiago 2, and the expanding Santiago 3 the campus delivers a combined 42 MW of critical IT capacity designed to support hyperscale cloud providers, multinational enterprises, financial institutions, content delivery networks, artificial intelligence workloads, and high-density enterprise computing. Built with scalability and resilience at its core, the campus incorporates a tri-bus electrical power redundancy architecture, dual chilled water cooling systems, and multiple layers of physical and digital security to ensure continuous operations and maximum uptime. Its robust connectivity infrastructure includes direct fiber links to PIX Chile (Point of Internet Exchange), enabling low-latency regional traffic exchange, alongside a dedicated underground fiber network that interconnects the campus with Ascenty’s extensive Latin American ecosystem and major international subsea cable landing stations. Located in Quilicura, one of Santiago’s premier technology and industrial districts, the campus offers excellent access to utility infrastructure and telecommunications networks while providing room for future expansion to meet growing cloud, AI, and digital transformation demands. As a key regional gateway, Ascenty’s Santiago Campus strengthens Chile’s position as a leading digital connectivity hub, enabling secure, scalable, and highly available infrastructure for customers serving both domestic and international markets.


Quick Facts

FieldValue
Project NameAscenty Santiago Data Center Campus: 42MW Cloud & Enterprise Hub
LocationGuacolda 2100, Comuna de Quilicura, Santiago, Región Metropolitana, 8710067, Chile
StatusOperational (Santiago 1 & 2) / Active Expansion (Santiago 3 Under Construction)
CommissioningSantiago 1 Launch: 2020 / Santiago 2 Launch: 2022 / Santiago 3 Expansion Go-Live: 2025–2026
Total IT Load42 MW Total Critical IT Load Capacity across campus (Santiago 1: 10 MW, Santiago 2: 16 MW, Santiago 3: 16 MW)
Total Capacity42 MW Total Campus Power Capacity across 51,000 m² (~550,000 sq ft) total area and 4,100+ total racks
Tier LevelTier III Certified Design & Facility by Uptime Institute (ISO 27001, ISO 14001, ISO 50001, ISO 20000, PCI-DSS, SOC 1/2/3 Certified)
Project TypePurpose-Built Greenfield Hyperscale, Cloud Gateway & Carrier-Neutral Colocation Campus

City Profile

HeaderDetails
City NameSantiago
Populationapprox 6.9 million (Metropolitan Area)
Urban Agglomerationapprox 7.2 million
City GDP$117.1 billion
Per Capita Income$17,000
City TierTier I
Key StrengthsStable Economy, Excellent Renewables Grid (Hydro/Solar), Pacific Subsea Cable Hub, Streamlined Permitting, Highly-skilled workforce

Companies Involved

HeaderDetails
Developer / Operator Ascent Corp
Strategic Infrastructure Partner Enel Distribución Chile (Electrical Utility) & PIT Chile / PIX Chile (Internet Exchange Partners)
Construction Contractor Specialized Latin American Mission-Critical EPC & General Contractors
MEP Engineering Ascenty Global Infrastructure Engineering & Thermal Management Teams
Network Connectivity Dual dedicated Telecom Meet-Me-Rooms (MMRs); carrier-neutral access to 15+ telecom providers; direct connection to PIX Chile / PIT Chile; proprietary dedicated underground fiber ring connecting Santiago to subsea landings (Curie, Prat, Mistral) and regional Latin American networks.
Power Infrastructure Tri-bus power redundancy system (three independent utility/power lines servicing each data hall), static 2N / N+1 block-redundant uninterruptible power supply (UPS) architecture, and standby diesel backup generators with 48 hours of on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity42 MW Total Critical Power (10 MW SCL1 + 16 MW SCL2 + 16 MW SCL3)
UPS RedundancyTri-Bus / 2N Static UPS Architecture
Cooling System Dual-coil cold water chiller systems, isolated technical corridors for hot/cold aisle containment, eco-mode air-side economizers, and high-density rack support with liquid cooling readiness.
Connectivity Carrier-neutral platform with dual Meet-Me-Rooms, high-capacity fiber cross-connects, and direct low-latency cloud direct-connect gateways.
PUE Target < 1.35 Annualized Operational Design PUE
Energy Mix 100% renewable energy matching backed by International Renewable Energy Certificates (I-RECs) and carbon-neutral facility certification.

Milestones

HeaderDetails
Announcement Campus Launch: 2019 / Santiago 3 Expansion: 2023
Construction Start 2019 (Original Site) / Santiago 3 Phase: 2023–2024
Phase 1 Go-Live 2020 (Santiago 1) / 2022 (Santiago 2)
Full Buildout 2025–2026 (Completion of Santiago 3 Building & Final Whitespace)

Investment Details

HeaderDetails
Total InvestmentEstimated $250,000,000 USD to $350,000,000 USD (Full 42 MW Campus Buildout)
Funding Ascenty / Digital Realty / Brookfield Infrastructure corporate capital expenditure (CapEx) allocation