Status: Planned | Location: Phillis Road, east of Rose Hill Road, and south of Tobacco Heritage Trail, Boydton, Mecklenburg County, Virginia 23917, USA
Microsoft Phillis Road Campus, also designated in federal permitting filings as the LVL-16 Data Center Campus, is a proposed five-building hyperscale cloud computing development near Boydton in Mecklenburg County, Virginia. The project represents another significant expansion of Microsoft's established data center presence in Southern Virginia, strengthening the region's position as a major hub for hyperscale cloud computing, artificial intelligence, and enterprise digital infrastructure. The proposed campus will occupy approximately 316.7 acres across three parcels located north of Phillis Road, east of Rose Hill Road, and south of the Tobacco Heritage Trail. According to a November 2026 permit filing submitted to the U.S. Army Corps of Engineers Norfolk District, the master plan includes five single-story data center buildings supported by an extensive range of essential infrastructure. Planned facilities include an on-site electrical substation, water storage facility, domestic and fire water distribution systems, sanitary sewer connections, industrial wastewater infrastructure, underground fiber and electrical conduits, and stormwater detention ponds. These integrated systems are intended to support the substantial electricity, cooling, water management, and network connectivity requirements associated with large-scale cloud operations. Once developed, the campus is expected to provide additional computing and storage capacity for Microsoft's Azure platform, supporting growing demand for cloud services, enterprise workloads, and AI-driven applications across the U.S. East Coast. The development also reflects Microsoft's broader sustainability objectives, incorporating LEED Gold design targets, low-water thermal management approaches such as direct evaporative or closed-loop cooling, and planned transitions toward renewable biofuel backup power. Renewable energy procurement through regional power purchase agreements is another component of its sustainability strategy. Located approximately 90 minutes from Richmond and Raleigh, the Phillis Road Campus further reinforces Boydton's strategic importance within Microsoft's Southern Virginia Regional Network Group and the Azure East US 2 availability region, expanding the area's established hyperscale infrastructure ecosystem.
| Field | Value |
|---|---|
| Project Name | DC BLOX Indianapolis Campus 100MW Data Center Indiana |
| Location | Phillis Road, east of Rose Hill Road, and south of Tobacco Heritage Trail, Boydton, Mecklenburg County, Virginia 23917, USA |
| Status | Planned |
| Project Type | Hyperscale Cloud and AI Data Center Campus |
| Commissioning | π Subscriber Intelligence |
| Total IT Load | π Subscriber Intelligence |
| Total Capacity | π Subscriber Intelligence |
| Tier Level | π Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Virginia |
| Population | β 1.77 million |
| Urban Agglomeration | β 1.05 million (CharlestonβHuntingtonβParkersburg combined urban influence) |
| Economic Profile | π Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.