Moro Hub Abu Dhabi Data Center: Sustainable Sovereign Cloud & AI Expansion UAE
Status: Active Development / Expansion | Location: Abu Dhabi Digital Infrastructure Corridor, Abu Dhabi, United Arab Emirates
Project Overview
The Moro Hub Abu Dhabi Data Center Expansion represents the strategic growth of Digital DEWA's digital infrastructure platform into the Emirate of Abu Dhabi, strengthening the United Arab Emirates' position as a regional leader in cloud computing, artificial intelligence, and sustainable digital infrastructure. Developed to complement Moro Hub's internationally recognized solar-powered data center ecosystem in Dubai, the Abu Dhabi expansion is designed to provide secure, scalable, and high-performance infrastructure for federal and local government entities, financial institutions, healthcare organizations, critical infrastructure operators, multinational enterprises, and hyperscale cloud service providers. The facility is engineered to support sovereign cloud hosting, AI model training and inference, cybersecurity operations, Internet of Things (IoT) data processing, big data analytics, disaster recovery, and mission-critical digital services while meeting the UAE's growing demand for secure data residency and digital sovereignty. Built with a strong emphasis on sustainability, the expansion incorporates 100% clean energy sourcing strategies, energy-efficient mechanical and electrical systems, intelligent building management platforms, and advanced environmental monitoring to minimize operational carbon emissions. The campus is also designed with liquid cooling readiness, enabling efficient support for high-density GPU clusters, AI workloads, and next-generation high-performance computing (HPC) environments. Resilient power infrastructure, redundant cooling systems, advanced fire detection and suppression technologies, and multi-layer physical security ensure continuous availability and operational resilience for mission-critical applications. As a carrier-neutral digital platform, the facility enables seamless multi-cloud connectivity through diverse telecommunications providers and cloud interconnection ecosystems, allowing customers to deploy hybrid and multi-cloud architectures with low-latency access to regional and global networks. By combining sustainable infrastructure, sovereign cloud capabilities, AI-ready design, advanced cybersecurity support, and scalable connectivity, the Moro Hub Abu Dhabi Data Center Expansion reinforces the UAE's national digital transformation strategy and establishes a future-ready platform for innovation, smart government services, and next-generation enterprise computing across the region.
Quick Facts
| Field | Value |
| Project Name | Moro Hub Abu Dhabi Data Center: Sustainable Sovereign Cloud & AI Expansion UAE |
| Location | Abu Dhabi Digital Infrastructure Corridor, Abu Dhabi, United Arab Emirates |
| Status | Active Development / Expansion |
| Commissioning | Target Delivery 2026–2027 (Phased Expansion) |
| Total IT Load | Multi-Megawatt Critical IT Power Allocation (Scalable Facility Masterplan) |
| Total Capacity | Custom-built multi-hall technical whitespace footprint across high-density server environments |
| Tier Level | Tier III Certified Design and Constructed Facility (Uptime Institute) / Gold Operational Sustainability Certified / ISO 27001, ISO 22301, ISO 14001, ISO 9001, LEED Platinum Targets |
| Project Type | Purpose-Built Government-Grade Sovereign Cloud, High-Density AI Training & Enterprise Colocation Hub |
City Profile
| Header | Details |
| City Name | Abu Dhabi |
| Population | ~1.6 Million (City) |
| Urban Agglomeration | ~3.8 Million (Emirate) |
| City GDP | ~$310 Billion USD (Emirate) |
| Per Capita Income | ~$82,000 USD |
| City Tier | Tier 1 Global Hub |
| Key Strengths | Nuclear Power, Sovereign Funding, Strategic Neutrality |
Companies Involved
| Header | Details |
| Developer / Operator | Moro Hub |
| Strategic Infrastructure Partner | TAQA (Abu Dhabi National Energy Company) / EWEC (Emirates Water and Electricity Company) & Abu Dhabi Digital Authority (ADDA) |
| Construction Contractor | Specialized UAE Mission-Critical EPC & Strategic Technology Partners (e.g., Huawei, Dell Technologies) |
| MEP Engineering | Moro Hub In-House Engineering Teams & Mission-Critical Technical Infrastructure Consultants |
| Network Connectivity | Ultra-connected carrier-neutral environment, dual path-diverse subterranean fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), direct interconnects to regional telecom operators (Etisalat by e&, du), and direct cloud on-ramps. |
| Power Infrastructure | Dual high-voltage grid utility connections, static 2N / N+1 fault-tolerant uninterruptible power supply (UPS) modules, automated switchgear (ATS), and multi-megawatt N+1 emergency standby diesel generator arrays with extensive on-site fuel reserve autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | Scalable High-Voltage Substation Primary Power Grid Allocation |
| UPS Redundancy | 2N / N+1 Static UPS Architecture |
| Cooling System | High-efficiency eco-designed cooling infrastructure, cold aisle containment, Direct-to-Chip Liquid Cooling (DLC) readiness for ultra-high-density AI racks, and automated BMS environmental controls. |
| Connectivity | Low-latency optical dark fiber corridors linking Abu Dhabi directly to Moro Hub's flagship Dubai data center campuses, regional sovereign cloud zones, and subsea cable landing stations. |
| PUE Target | < 1.30 Annualized Operational Design PUE |
| Energy Mix | 100% Clean Energy procurement strategy aligned with the UAE Net Zero by 2050 Strategic Initiative. |
Milestones
| Header | Details |
| Announcement | Planned / Regional Expansion Strategy |
| Construction Start | Active Phased Construction / Expansion |
| Phase 1 Go-Live | Target 2026–2027 |
| Full Buildout | Active Multi-Phase Regional Expansion |
Investment Details
| Header | Details |
| Total Investment | Estimated $100,000,000 USD to $200,000,000 USD Expansion Capital Allocation |
| Funding | Corporate Capital Expenditure (Moro Hub / Digital DEWA / Capital Allocation) |