NAVER Gak Sejong is a 270 MW flagship hyperscale artificial intelligence data center developed by NAVER Corporation in Sejong, South Korea, representing a major investment in the country’s next-generation digital infrastructure. Spanning approximately 294,000 m², the campus is designed to support the rapidly expanding computational requirements of artificial intelligence, cloud computing, and high-performance computing workloads. The facility is purpose-built to support NAVER’s HyperCLOVA X generative AI models, enabling large-scale model training, inference, and other advanced AI applications that require substantial computing capacity and specialized infrastructure. In addition to AI workloads, the campus supports NAVER’s broader cloud operations and high-performance supercomputing requirements, creating an integrated environment capable of handling diverse enterprise and digital services. A major component of the development is its extensive storage infrastructure, with a reported capacity of approximately 65 exabytes, enabling the facility to manage enormous volumes of data generated by AI models, cloud applications, and digital platforms. The campus’s large physical footprint and high power capacity allow NAVER to deploy dense computing systems at significant scale while maintaining room for operational flexibility and future growth. Its development in Sejong further strengthens the city’s position as an emerging hub for advanced technology and digital infrastructure in South Korea. By combining hyperscale computing capacity, massive storage infrastructure, AI-optimized systems, and cloud capabilities, NAVER Gak Sejong demonstrates the evolution of data centers from conventional server facilities into sophisticated AI infrastructure platforms. The project is expected to play an important role in supporting NAVER’s generative AI ecosystem and its growing portfolio of cloud, search, and digital services.


Quick Facts

FieldValue
Project NameNAVER Gak Sejong Data Center: NAVER AI Specs
Location824 Haengbok-daero, Jipyeon-dong, Sejong Special Self-Governing City 30141, South Korea
StatusActive Operation / Phased Expansion
CommissioningNovember 2023 Phase 1 Delivery (Multi-Phase Buildout)
Total IT Load~200.0 MW Planned Total Critical IT Load
Total Capacity294,000 m² (3.16M sq ft) total campus area accommodating up to 600,000 server units
Tier LevelTier III / Tier IV Equivalent Fault-Tolerant Hyperscale AI Architecture
Project TypePurpose-Built Sovereign AI Supercomputing Cloud, Hyperscale Data Center & Storage Megacampus

City Profile

HeaderDetails
City NameSejong-si
Population~410,000 (2025 estimate)
Urban Agglomeration~430,000
City GDP~USD 18 billion (estimated)
Per Capita Income~USD 43,000–45,000
City TierTier 2 (South Korea)
Key StrengthsAdministrative capital of South Korea; concentration of government ministries and public institutions; planned smart city development; modern infrastructure; high quality of life; strong public-sector employment; innovation and sustainability initiatives

Companies Involved

HeaderDetails
Developer / Operator NAVER Corporation
Strategic Infrastructure Partner Hyundai E&C (General Construction), Sejong Special Self-Governing City, KEPCO
Construction Contractor Hyundai E&C (Hyundai Engineering & Construction)
MEP Engineering NAVER Data Center Design Team & Specialized Critical Engineering Partners
Network Connectivity Carrier-neutral facility featuring path-diverse subterranean fiber vaults, dedicated Meet-Me-Rooms (MMRs), and high-capacity dark fiber links connecting directly to NAVER's Gak Chuncheon data center and Seoul connectivity hubs.
Power Infrastructure Direct 154 kV high-voltage dual transmission grid tie-in from KEPCO substations, backed by static 2N / N+1 UPS systems and on-site emergency backup generators.

Technical Specifications

HeaderDetails
Power Capacity~270 MVA Dedicated Substation Grid Capacity
UPS RedundancyConcurrently Maintainable Tier III 2N / N+1 Static UPS Systems
Cooling System NAMU III (NAVER Air Membrane Unit) indirect free cooling, direct air/liquid hybrid cooling systems, and cold-air containment utilizing natural winds from the Geum River.
Connectivity Sub-millisecond optical dark fiber interconnects establishing high-speed trunk lines across South Korea's national digital backbone.
PUE Target < 1.12 Annualized Operational Design PUE
Energy Mix High-efficiency KEPCO grid power supplemented by on-site solar PV installations, waste-heat reuse systems, and green power procurement.

Milestones

HeaderDetails
Announcement October 2019
Construction Start April 2021
Phase 1 Go-Live November 2023
Full Buildout Multi-Phase Expansion Delivery Through 2028+

Investment Details

HeaderDetails
Total Investment~₩700,000,000,000 KRW (~$520,000,000 USD Phase 1 Initial Investment; Masterplan Capital Expenditure higher)
Funding Corporate Capital Expenditure (NAVER Corporation)