NEXTDC P1 Perth Data Center: 6MW Enterprise Colocation & Cloud Hub Western Australia

Status: Fully Operational Enterprise & Cloud Hub   |   Location: 4 Millrose Drive 6090 Malaga Western Australia, Australia


Project Overview

NEXTDC P1 is Perth's flagship carrier-neutral enterprise colocation data center, strategically located in the industrial suburb of Malaga, approximately 13 kilometers north of Perth's central business district. Purpose-built to Uptime Institute Tier III standards, the facility delivers approximately 6 MW of critical IT capacity across 3,000 m² of technical whitespace, providing highly resilient infrastructure for enterprises, government agencies, financial institutions, telecommunications providers, cloud service providers, and digital businesses operating throughout Western Australia. Designed to support mission-critical applications and hybrid IT environments, P1 features fully redundant power distribution systems, high-efficiency cooling infrastructure, advanced fire detection and suppression systems, multi-layer physical security, and 24/7 monitoring by dedicated operational personnel to ensure maximum availability and business continuity. As one of Western Australia's primary digital infrastructure hubs, the facility serves as a major cloud and network landing point, offering direct connectivity to leading cloud platforms including AWS Direct Connect, Microsoft Azure ExpressRoute, and Google Cloud Interconnect through NEXTDC's AXON platform, enabling secure, low-latency, and high-bandwidth access to public cloud services. P1 also provides carrier-neutral interconnection with multiple domestic and international telecommunications providers, internet exchanges, and managed service operators, while benefiting from Perth's strategic position as the landing point for several international subsea cable systems connecting Australia with Asia, the Middle East, Europe, and Africa. Its scalable infrastructure supports enterprise digital transformation, disaster recovery, high-performance computing, AI workloads, financial services, healthcare, mining, energy, education, and government applications requiring secure, reliable, and high-speed connectivity. By combining resilient Tier III-certified infrastructure, rich network density, cloud enablement, and access to global communications routes, NEXTDC P1 plays a pivotal role in strengthening Western Australia's digital economy and enabling organizations to deploy future-ready, high-performance IT infrastructure with confidence.


Quick Facts

FieldValue
Project NameNEXTDC P1 Perth Data Center: 6MW Enterprise Colocation & Cloud Hub Western Australia
Location4 Millrose Drive 6090 Malaga Western Australia, Australia
StatusFully Operational Enterprise & Cloud Hub
CommissioningOperational (Commissioned Feb 2014)
Total IT Load6.0 MW Total Critical IT Power Capacity
Total Capacity~6,000 m² (~64,500 sq ft) gross building footprint / ~3,000 m² net IT whitespace
Tier LevelTier III Certified Design and Constructed Facility (Uptime Institute) / NABERS 5-Star Energy Rated / ISO 27001 Certified
Project TypePurpose-Built Multi-Tenant Enterprise Colocation, Cloud Gateway & Network Interconnection Hub

City Profile

HeaderDetails
City NamePerth
Population~2.4 million
Urban Agglomeration~2.4 million (Greater Perth)
City GDP~AUD 220 billion (≈ USD 145 billion)
Per Capita Income~AUD 90,000
City TierTier 1 – Global Mining, Energy & Technology Hub
Key StrengthsCapital of Western Australia; strong mining and energy sector; growing technology and digital infrastructure market; excellent international connectivity; business-friendly environment; highly skilled workforce; abundant renewable energy potential; expanding hyperscale and colocation data center market; strategic gateway to Asia-Pacific; high quality of life.

Companies Involved

HeaderDetails
Developer / Operator NEXTDC
Strategic Infrastructure Partner Western Power Utility Distribution Network & City of Swan
Construction Contractor Specialized Australian Mission-Critical EPC & Commercial Building Contractors
MEP Engineering NEXTDC In-House Design Engineering Teams & Australian Mission-Critical Consultants
Network Connectivity Dense carrier-neutral environment, 60+ telecommunications carriers and service providers, dual path-diverse subterranean fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), and direct links to IX Australia peering nodes.
Power Infrastructure Dual 11kV high-voltage utility grid feeds, static N+1 uninterruptible power supply (UPS) configurations, automated transfer switches (ATS), and multi-megawatt N+1 standby emergency diesel generator arrays with 48 hours on-site fuel autonomy at full load.

Technical Specifications

HeaderDetails
Power Capacity~8.0 MVA Total Utility Grid Connection Allocation
UPS RedundancyN+1 Static UPS Architecture
Cooling System Energy-efficient cooling systems with N+1 CRAH/CRAC redundancy, hot/cold aisle containment, eco-mode chillers, and 24/7 real-time BMS environmental controls.
Connectivity High-speed optical dark fiber backbones linking P1 directly to NEXTDC's P2 hyperscale campus (East Perth) and subsea cable landing gateways (Indigo, ASC, Oman Australia Cable).
PUE Target ~1.30 Annualized Operational Design PUE
Energy Mix 100% GreenPower renewable energy options available backed by NEXTDC's corporate carbon-neutral commitments.

Milestones

HeaderDetails
Announcement 2012–2013
Construction Start 2013
Phase 1 Go-Live Operational (February 2014)
Full Buildout Fully Operational Active Facility

Investment Details

HeaderDetails
Total InvestmentEstimated $80,000,000 AUD to $100,000,000 AUD Total Capital Investment
Funding Public Corporate Capital Expenditure (NEXTDC Limited - ASX: NXT)

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.