NEXTDC P2 Perth Data Center: 20MW Hyperscale & AI Cloud Campus Western Australia

Status: Fully Operational Hyperscale & AI Infrastructure Hub   |   Location: 20 Leeder Street, East Perth, WA 6004, Australia


Project Overview

NEXTDC P2 is Perth's flagship Tier IV hyperscale data center, strategically located in East Perth adjacent to the city's central business district, providing one of the most advanced and resilient digital infrastructure platforms in Western Australia. Purpose-built to deliver approximately 20 MW of critical IT capacity within an eight-story vertical facility, P2 is engineered to support mission-critical enterprise applications, hyperscale cloud deployments, high-density artificial intelligence computing, financial services, government workloads, and next-generation digital platforms. Designed with Tier IV fault-tolerant architecture, the facility incorporates fully redundant power and cooling systems, concurrent maintainability, multiple independent distribution paths, advanced fire detection and suppression technologies, intelligent building management systems, and multi-layer physical security with continuous monitoring to ensure exceptional levels of availability and operational resilience. P2 is optimized for high-density rack deployments and future-ready liquid cooling integration, enabling organizations to efficiently support GPU-intensive AI and high-performance computing environments. As Western Australia's premier international connectivity hub, the facility serves as a key landing point for major subsea cable systems, including INDIGO-Central, Australia Singapore Cable (ASC), and the Oman Australia Cable (OAC), providing low-latency connectivity between Australia, Asia, the Middle East, and Europe. Through NEXTDC's AXON platform, customers gain direct, private access to leading cloud providers, including AWS Direct Connect, Microsoft Azure ExpressRoute, Google Cloud Interconnect, and other major cloud ecosystems, while benefiting from a rich carrier-neutral environment with multiple telecommunications providers and internet exchanges. The combination of resilient Tier IV infrastructure, global network connectivity, scalable power capacity, cloud enablement, and AI-ready design positions NEXTDC P2 as a critical digital gateway for Western Australia, supporting enterprise digital transformation, international business operations, and the region's rapidly growing demand for secure, high-performance, and globally connected data center infrastructure.


Quick Facts

FieldValue
Project NameNEXTDC P2 Perth Data Center: 20MW Hyperscale & AI Cloud Campus Western Australia
Location20 Leeder Street, East Perth, WA 6004, Australia
StatusFully Operational Hyperscale & AI Infrastructure Hub
CommissioningOperational (Commissioned Q4 2020)
Total IT Load20.0 MW Total Critical IT Power Capacity
Total Capacity~20,000 m² (~215,000 sq ft) gross building footprint across 8 levels / ~12,000 m² technical whitespace
Tier LevelTier IV Certified Design and Constructed Facility (Uptime Institute) / Gold Operational Sustainability Certified / NABERS 5-Star Energy Rated / ISO 27001
Project TypePurpose-Built Master-Planned Hyperscale, High-Density Colocation & Subsea Cable Gateway

City Profile

HeaderDetails
City NamePerth
Population~2.4 million
Urban Agglomeration~2.4 million (Greater Perth)
City GDP~AUD 220 billion (≈ USD 145 billion)
Per Capita Income~AUD 90,000
City TierTier 1 – Global Mining, Energy & Technology Hub
Key StrengthsCapital of Western Australia; strong mining and energy sector; growing technology and digital infrastructure market; excellent international connectivity; business-friendly environment; highly skilled workforce; abundant renewable energy potential; expanding hyperscale and colocation data center market; strategic gateway to Asia-Pacific; high quality of life.

Companies Involved

HeaderDetails
Developer / Operator NEXTDC
Strategic Infrastructure Partner Western Power Utility Distribution Network & City of Vincent / City of Perth
Construction Contractor Multiplex (General Main Contractor)
MEP Engineering Aurecon / NEXTDC In-House Technical Infrastructure & Design Engineering Teams
Network Connectivity Highly connected carrier-neutral facility, 80+ telecommunications carriers and service providers, dual path-diverse subterranean fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), direct interconnects to IX Australia, and direct landfalls for major subsea cable backhauls.
Power Infrastructure Dual high-voltage grid utility feeds, static 2N fault-tolerant uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt N+2 standby emergency diesel generator arrays with 48 hours on-site fuel reserve autonomy at full load.

Technical Specifications

HeaderDetails
Power Capacity~25.0 MVA Primary Grid Utility Connection Power Allocation
UPS Redundancy2N Fault-Tolerant Static UPS Architecture
Cooling System High-efficiency dry-cooling and chilled water plants with 2N system redundancy, cold aisle containment, Direct-to-Chip Liquid Cooling (DLC) readiness for high-density AI racks, zero water evaporation cooling, and real-time BMS controls.
Connectivity Ultra-low latency dark fiber corridors linking P2 directly to NEXTDC’s P1 Malaga campus, central Perth enterprise hubs, and international subsea landing stations.
PUE Target < 1.28 Annualized Operational Design PUE
Energy Mix 100% GreenPower renewable energy options available backed by NEXTDC's corporate carbon-neutral commitments.

Milestones

HeaderDetails
Announcement 2018
Construction Start 2019
Phase 1 Go-Live Operational (October 2020)
Full Buildout Fully Operational Active Facility

Investment Details

HeaderDetails
Total InvestmentEstimated $200,000,000 AUD to $250,000,000 AUD Total Capital Investment
Funding Public Corporate Capital Expenditure (NEXTDC Limited - ASX: NXT)