ODATA ST02 Santiago Data Center: 40.6MW Hyperscale Campus Chile

Status: Operational / Active Expansion   |   Location: San Bernardo, Metropolitan Region, Santiago, Chile


Project Overview

ODATA’s ST02 (SCL2) Data Center Campus in San Bernardo, Santiago, is one of the largest hyperscale digital infrastructure facilities in southern Santiago, strategically positioned to support Chile’s rapidly expanding cloud and digital services market. Delivering up to 40.6 MW of critical IT capacity within a purpose-built 366,000-square-foot facility, the campus is designed to accommodate hyperscale cloud providers, enterprise colocation customers, artificial intelligence (AI), machine learning, and high-performance computing (HPC) workloads. Its scalable architecture enables customers to deploy large-scale, mission-critical infrastructure while maintaining the flexibility required for future expansion and increasing compute demands. A key feature of ST02 is its dedicated 60 MVA on-site electrical substation with dual utility feeds, providing resilient, high-capacity power infrastructure capable of supporting continuous operations and high-density computing environments. The facility also incorporates Aligned’s proprietary Delta³ cooling technology, delivering highly efficient thermal management while supporting high rack power densities required for next-generation GPU clusters and AI applications. This advanced cooling system enhances energy efficiency, improves operational performance, and enables customers to deploy increasingly power-intensive workloads without compromising reliability. Designed with resilient power systems, enterprise-grade physical security, and modern network infrastructure, ST02 offers a highly available platform for cloud, enterprise, and data-intensive applications. Its strategic location within the Santiago metropolitan region also provides excellent connectivity to Chile’s national telecommunications networks and international digital infrastructure, making ODATA’s ST02 a future-ready hyperscale campus that supports digital transformation, cloud adoption, and AI-driven innovation across Chile and the wider South American market.


Quick Facts

FieldValue
Project NameODATA ST02 Santiago Data Center: 40.6MW Hyperscale Campus Chile
LocationSan Bernardo, Metropolitan Region, Santiago, Chile
StatusOperational / Active Expansion
CommissioningLaunched: November 2023 / Operational
Total IT Load40.6 MW Critical IT Load
Total Capacity40.6 MW IT Power across 34,000 m² (~366,000 sq ft) of building area on a 70,000 m² site
Tier LevelTier III Certified Design & Facility Standards (ISO 27001, ISO 14001, PCI-DSS Certified)
Project TypeGreenfield Hyperscale, Cloud Gateway & High-Density Enterprise Campus

City Profile

HeaderDetails
City NameSantiago
Populationapprox 6.9 million (Metropolitan Area)
Urban Agglomerationapprox 7.2 million
City GDP$117.1 billion
Per Capita Income$17,000
City TierTier I
Key StrengthsStable Economy, Excellent Renewables Grid (Hydro/Solar), Pacific Subsea Cable Hub, Streamlined Permitting, Highly-skilled workforce

Companies Involved

HeaderDetails
Developer / Operator Aligned Data Centers
Strategic Infrastructure Partner Enel Distribución Chile & Local Electrical Transmission Authorities
Construction Contractor Specialized Latin American Mission-Critical EPC & General Contractors
MEP Engineering ODATA Global Technical Infrastructure & Aligned Data Centers Engineering Teams
Network Connectivity Carrier-neutral platform with dual dedicated underground fiber lead-in vaults, dual Meet-Me-Rooms (MMRs), direct interconnectivity to ODATA ST01 (Lampa), and access to major regional fiber backbones and subsea landing points in Valparaíso.
Power Infrastructure Dedicated on-site electrical substation providing 60 MVA of utility capacity via dual high-voltage feeds, 2N / N+1 static uninterruptible power supply (UPS) architecture, and standby diesel backup generators with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity40.6 MW Critical IT Load / 60 MVA Utility Substation Connection
UPS Redundancy2N / N+1 Static Uninterruptible Power Supply (UPS) Configuration
Cooling System Aligned Delta³ (Delta Cube) proprietary cooling technology, offering direct heat removal at the source with support for up to 50 kW per rack, zero water utilization efficiency (WUE), and hot/cold aisle containment.
Connectivity Carrier-neutral platform with high-speed fiber cross-connects and low-latency cloud interconnect gateways.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix 100% renewable energy supply backed by regional Chilean solar and wind power purchase agreements (PPAs).

Milestones

HeaderDetails
Announcement Q4 2022
Construction Start Late 2022
Phase 1 Go-Live November 2023
Full Buildout Operational / Active Expansion Phases

Investment Details

HeaderDetails
Total InvestmentEstimated $200,000,000 USD to $300,000,000 USD
Funding Corporate Capital Expenditure by ODATA / Aligned Data Centers