Ooredoo Muscat Data Center Campus: Tier III Cloud & Enterprise Hub in Oman

Status: Fully Operational Hub   |   Location: Ooredoo Campus, Phase 7, Way No. 7311, Al Wuttayah West, Bawshar, Muscat, Sultanate of Oman


Project Overview

Ooredoo’s Muscat Data Center Campus in Bawshar is a flagship three-story digital infrastructure facility developed to support Oman’s Vision 2040 digital transformation strategy. Located within Ooredoo Oman’s headquarters campus, the facility spans approximately 7,000 m² and delivers 2.5 MW of critical IT capacity through dedicated, isolated data halls serving both Ooredoo’s core telecommunications infrastructure and its cloud subsidiary, data2cloud. Designed to Tier III uptime standards, the campus provides 99.98% availability with resilient N+1 redundancy across power and cooling systems to ensure continuous operation for mission-critical applications. The data center functions as a sovereign cloud hub and secure data repository for enterprise, banking, government, and public sector organizations, supporting digital services, business continuity, and regulatory compliance within Oman. Integrated with Ooredoo’s nationwide 5G core network and high-capacity domestic and international fiber infrastructure, the campus delivers low-latency connectivity for cloud computing, content delivery, and digital transformation initiatives. Built with scalable infrastructure to accommodate future growth, the facility also offers advanced physical security, continuous environmental monitoring, and energy-efficient operational systems. As one of Oman’s key carrier-neutral digital infrastructure assets, the Muscat Data Center Campus strengthens the country’s cloud ecosystem while enabling secure, high-performance hosting and connectivity services for organizations accelerating their digital modernization efforts.


Quick Facts

FieldValue
Project NameOoredoo Muscat Data Center Campus: Tier III Cloud & Enterprise Hub in Oman
LocationOoredoo Campus, Phase 7, Way No. 7311, Al Wuttayah West, Bawshar, Muscat, Sultanate of Oman
StatusFully Operational Hub
CommissioningOperational / Phased Facility Upgrades (In Service since 2021)
Total IT Load2.5 MW Critical IT Power Capacity Allocation
Total Capacity2.5 MW Total IT Power Capacity across a 7,000 m² (~75,300 sq ft) 3-story facility footprint supporting 300+ racks
Tier LevelTier III Certified Standards / ISO 27001, ISO 9001, PCI-DSS
Project TypePurpose-Built High-Density Enterprise Colocation, Sovereign Cloud Gateway & Telecom Edge Hub

City Profile

HeaderDetails
City NameMuscat
Population~1.7 million (Greater Muscat)
Urban Agglomeration~1.8 million (Jeonbuk region estimate)
City GDP~USD 45 billion (estimated metropolitan economy)
Per Capita Income~USD 26,000
City TierTier 1 – Business, Logistics & Digital Infrastructure Hub
Key StrengthsCapital and largest metropolitan area of Oman; country's financial and administrative center; strategic location on the Arabian Sea; expanding hyperscale and carrier-neutral data center market; strong international subsea cable connectivity; modern ports and logistics infrastructure; growing cloud computing ecosystem; reliable fiber networks; government-led digital transformation under Oman Vision 2040; gateway to Middle East, Asia, and East Africa.

Companies Involved

HeaderDetails
Developer / Operator Ooredoo
Strategic Infrastructure Partner Nama Electricity Distribution Company & Oman Ministry of Transport, Communications and Information Technology
Construction Contractor Local Omani & Regional Mission-Critical EPC Contractors
MEP Engineering Ooredoo In-House Technical Infrastructure & Critical Facilities Engineering Teams
Network Connectivity Carrier-neutral platform with dual subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency optical dark fiber backhaul to local internet exchange points, domestic telco backbones, and international subsea cable landing gateways in Oman.
Power Infrastructure Dual high-voltage grid feeders supplied by Nama Electricity, static distributed N+1 uninterruptible power supply (UPS) modules, automated switchgear, and backup diesel generator plants with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity2.5 MW Secured Utility Power Allocation
UPS RedundancyN+1 Distributed Redundant Static UPS Architecture
Cooling System Precision chilled-water and DX air-conditioning units with N+1 thermal redundancy, hot/cold aisle containment, automated water leak detection systems, and BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps, 5G network integration, and cross-connect options across Middle Eastern fiber corridors.
PUE Target < 1.45 Annualized Operational Design PUE
Energy Mix High-reliability grid power integrated with energy-efficient facility controls and localized sustainability initiatives aligned with Oman Vision 2040.

Milestones

HeaderDetails
Announcement 2020
Construction Start 2020
Phase 1 Go-Live Operational (2021)
Full Buildout Operational Active Facility

Investment Details

HeaderDetails
Total InvestmentEstimated $15,000,000 USD to $25,000,000 USD Cumulative Facility Capital Expenditure
Funding Corporate Capital Expenditure & Infrastructure Financing by Ooredoo Group / Ooredoo Oman

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.