QTS Phoenix 2 DC1: 210MW High-Density AI & Hyperscale Hub in Arizona

Status: Fully Operational Hub   |   Location: 1200 N 40th Street, Phoenix, AZ 85008, United States


Project Overview

QTS Phoenix 2 DC1 is the inaugural facility within QTS’s 85-acre hyperscale data center campus located on North 40th Street in East Phoenix, Arizona. Delivering 42 MW of critical IT capacity, the facility is purpose-built to support hyperscale cloud providers, enterprise digital platforms, and next-generation artificial intelligence (AI) and high-performance computing (HPC) workloads. Engineered for high-density computing, DC1 accommodates rack power densities ranging from 40 kW to more than 100 kW per rack, making it suitable for GPU-intensive AI training clusters and advanced cloud infrastructure. The campus incorporates QTS’s innovative water-free cooling technology, significantly reducing water consumption and conserving millions of gallons annually in Arizona’s desert environment while maintaining high cooling efficiency. Powered by 100% renewable energy, the facility aligns with QTS’s sustainability objectives and helps customers meet their environmental commitments. DC1 is connected through path-diverse dark fiber routes to major Phoenix carrier hotels, internet exchanges, and cloud on-ramp services, providing low-latency, high-bandwidth connectivity for mission-critical applications. The facility also features block-redundant electrical distribution, resilient backup power infrastructure, comprehensive physical security, and automated building management through the QTS Service Delivery Platform (SDP), delivering real-time monitoring, operational visibility, and high availability for enterprise, cloud, and AI-driven deployments.


Quick Facts

FieldValue
Project NameQTS Phoenix 2 DC1: 210MW High-Density AI & Hyperscale Hub in Arizona
Location1200 N 40th Street, Phoenix, AZ 85008, United States
StatusFully Operational Hub
CommissioningOperational / Phased Expansion (2022–2026+)
Total IT Load42 MW Critical IT Power Capacity Allocation (DC1 Building Load)
Total Capacity42 MW Total IT Load across a ~350,000 sq ft (~32,500 m²) gross facility footprint (Campus total: 210+ MW across 1.8M sq ft / 85 acres)
Tier LevelTier III Certified Architecture / ISO 27001, ISO 14001, SOC 1 & 2 Type II, PCI-DSS, HIPAA Compliant
Project TypePurpose-Built Hyperscale, High-Density AI Colocation & Enterprise Cloud Hub

City Profile

HeaderDetails
City NamePhoenix
Populationapprox 28,184$
Urban Agglomeration$approx 198,651$
City GDP$approx $10.91$ Billion USD
Per Capita Income$48,362 USD.
City TierSecondary U.S. Data Center Market
Key StrengthsVibrant Economy:

Companies Involved

HeaderDetails
Developer / Operator QTS Data Centers
Strategic Infrastructure Partner SRP (Salt River Project) Utility Network & City of Phoenix Municipal Authorities
Construction Contractor Specialized US Mission-Critical EPC Contractors
MEP Engineering QTS In-House Global Critical Infrastructure Engineering Teams
Network Connectivity Carrier-neutral platform with dual subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct dark fiber backhaul linking to Phoenix IX, major regional carrier facilities, and national fiber backbones.
Power Infrastructure Dual dedicated 230kV high-voltage utility substations on-site, static distributed 2N / Block Redundant N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt standby diesel generators with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity42 MW Secured Utility Power Allocation (DC1 Building Allocation)
UPS RedundancyBlock Redundant / 2N Static UPS Architecture
Cooling System Closed-loop non-evaporative chilled-water systems, zero-water waste dissipation (WUE = 0.0), Direct-to-Chip Liquid Cooling (DLC) and Rear Door Heat Exchanger (RDHx) readiness for high-density AI clusters, and automated BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps (AWS, Azure, GCP via QTS SDP) and cross-connect options across North American fiber corridors.
PUE Target < 1.18 Annualized Operational Design PUE
Energy Mix 100% Certified Carbon-Free Renewable Energy integration via long-term solar/wind Power Purchase Agreements (PPAs) with Salt River Project.

Milestones

HeaderDetails
Announcement 2021
Construction Start 2021–2022
Phase 1 Go-Live Operational (2022–2023)
Full Buildout Operational Active Building

Investment Details

HeaderDetails
Total InvestmentEstimated $300,000,000 USD to $450,000,000 USD Building 1 Capital Expenditure
Funding Corporate Capital Expenditure & Private Equity Infrastructure Financing (Blackstone / QTS)