Prologis Project Sail Data Center: 900MW Hyperscale AI Campus Coweta County Georgia
Status: Permitted / Site Preparation & Planning | Location: Sargent Road & Wagers Mill Road, Coweta County (near Newnan), GA 30263, Georgia, United States
Project Overview
Prologis Project Sail is a massive $17 billion hyperscale data center campus planned across an approximately 832-acre site in Coweta County, Georgia, roughly 45 miles south of Atlanta. Originally spearheaded by Atlas Development LLC and subsequently acquired by industrial real estate giant Prologis, the development represents a major expansion of the Atlanta region’s growing hyperscale and artificial intelligence infrastructure market. The campus is master-planned to provide up to 900 MW of capacity and is expected to comprise nine large-scale data center buildings with a combined footprint of approximately 4.34 million square feet of dedicated data center whitespace. Designed around the rapidly increasing power and computing requirements of next-generation digital workloads, Project Sail is being positioned to accommodate hyperscale cloud platforms, artificial intelligence applications, high-performance computing, machine learning, and large language model (LLM) training. A key strategic advantage of the development is its location adjacent to existing high-voltage transmission infrastructure, providing direct proximity to critical electrical resources required to support a campus of this scale. Access to substantial power capacity is particularly important for AI-oriented deployments, where dense GPU clusters can require significantly greater electrical and cooling capacity than conventional enterprise computing environments. The large land footprint also provides Prologis with sufficient space for phased construction, supporting the potential expansion of computing capacity as demand develops over time. Beyond electrical infrastructure, the campus is designed as an integrated hyperscale environment capable of accommodating the mechanical, networking, security, and support systems required for large-scale data center operations. Its location within Coweta County provides access to the broader Atlanta digital infrastructure ecosystem while offering a large development footprint outside the core metropolitan area. By combining substantial planned capacity, a large contiguous site, proximity to high-voltage transmission lines, and purpose-built facilities for AI and cloud workloads, Project Sail represents a significant evolution in Georgia’s data center market. The development demonstrates the growing scale of hyperscale campuses being planned specifically around the power density, computing performance, and expansion requirements of next-generation AI infrastructure.
Quick Facts
| Field | Value |
| Project Name | Prologis Project Sail Data Center: 900MW Hyperscale AI Campus Coweta County Georgia |
| Location | Sargent Road & Wagers Mill Road, Coweta County (near Newnan), GA 30263, Georgia, United States |
| Status | Permitted / Site Preparation & Planning |
| Commissioning | Phased Rollout Target (Phase 1 Target 2027–2028 / Multi-Year Buildout) |
| Total IT Load | 900.0 MW Critical IT Power Capacity Allocation |
| Total Capacity | ~403,200 m² (~4,340,000 sq ft) total floor area across 9 planned data center buildings on an 832-acre master site |
| Tier Level | Tier III / Tier IV Concurrently Maintainable Architecture |
| Project Type | Purpose-Built Master-Planned Hyperscale & AI Compute Campus |
City Profile
| Header | Details |
| City Name | Coweta |
| Population | ~10,000 |
| Urban Agglomeration | Part of the Tulsa metropolitan area, ~1.1 million |
| City GDP | Not separately reported; part of the Tulsa metropolitan economy |
| Per Capita Income | ~US$35,000–40,000 (estimated) |
| City Tier | Tier 3 – Emerging Industrial & Digital Infrastructure Location |
| Key Strengths | Proximity to Tulsa; access to U.S. Highway 51 and regional transportation networks; relatively affordable land and operating costs; access to Oklahoma's energy resources; growing industrial and logistics activity; proximity to regional fiber networks; access to the Tulsa-area workforce; suitable location for large-scale industrial and digital infrastructure development. |
Companies Involved
| Header | Details |
| Developer / Operator | Prologis, Inc. |
| Strategic Infrastructure Partner | Georgia Power (Southern Company), Coweta County Board of Commissioners & Development Authority |
| Construction Contractor | Specialized U.S. Mission-Critical Hyperscale EPC & General Contractors |
| MEP Engineering | Prologis Global Data Center Engineering & Mission-Critical Architecture Partners |
| Network Connectivity | Carrier-neutral ecosystem, dual path-diverse subterranean fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), and high-capacity dark fiber backbones linking Coweta County directly to Atlanta's primary internet exchanges and cloud routing centers. |
| Power Infrastructure | Direct connection to adjacent high-voltage utility grid transmission infrastructure, static 2N / N+1 uninterruptible power supply (UPS) modules, automated transfer switchgear (ATS), and multi-megawatt N+1 standby emergency diesel generator arrays with extensive on-site fuel reserve autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | ~1.0+ GVA Dedicated Utility Substation Grid Allocation |
| UPS Redundancy | 2N / N+1 Static UPS Architecture |
| Cooling System | Direct-to-Chip Liquid Cooling (DLC) readiness for ultra-high rack power densities, closed-loop waterless dry-cooler heat rejection systems, cold aisle containment, and real-time BMS environmental controls. |
| Connectivity | Sub-millisecond optical dark fiber routes connecting Project Sail to regional cloud availability zones and the broader Atlanta metro fiber ring. |
| PUE Target | < 1.25 Annualized Operational Design PUE |
| Energy Mix | High-efficiency operational design aligned with Georgia Power clean power procurement options and Prologis corporate net-zero sustainability goals. |
Milestones
| Header | Details |
| Announcement | 2024–2025 (Atlas Acquisition / Prologis Transition Q2 2025) |
| Construction Start | Target 2026 |
| Phase 1 Go-Live | Target 2027–2028 |
| Full Buildout | Multi-Phase 10-Year Master-Planned Hyperscale Buildout |
Investment Details
| Header | Details |
| Total Investment | Estimated $17,000,000,000 USD Total Campus Capital Investment |
| Funding | Corporate Capital Expenditure / Infrastructure Capital Investment (Prologis, Inc.) |