Status: Proposed / Zoning Ordinance Review & Public Hearing Phase | Location: Harts Mill Road & 400th Avenue (1,100-Acre Assembly), Clinton, IA 52732, USA
The QTS Clinton Data Center Campus is a proposed $10.0 billion hyperscale data center development spanning approximately 1,100 acres near Harts Mill Road and 400th Avenue in Clinton, Iowa, positioning it as a major planned digital infrastructure investment in the U.S. Midwest. Developed by Blackstone-backed QTS Data Centers, the master-planned campus is designed to accommodate up to six large-scale data center facilities, designated DC1 through DC6, providing a long-term platform for expanding cloud and AI computing capacity. The scale of the site allows the development to progress through multiple phases rather than relying on a single facility, creating flexibility to align future construction with demand for accelerated computing and high-density workloads. The campus is engineered to support ultra-high-density accelerated computing, machine learning, and hyperscale cloud infrastructure, reflecting the rapidly increasing infrastructure requirements associated with artificial intelligence and data-intensive applications. A major infrastructure advantage is the project's planned access to dedicated high-voltage utility infrastructure from Alliant Energy, providing the substantial electrical capacity required to operate multiple large-scale computing facilities. Power availability is particularly important for AI-oriented data centers, where dense accelerator deployments can significantly increase both electrical and thermal loads. To address these cooling requirements, the campus incorporates closed-loop liquid cooling systems, designed to eliminate continuous municipal water draw while providing thermal management suitable for high-density computing environments. This approach can reduce dependence on conventional water-intensive cooling infrastructure and support more efficient operation at higher rack densities. With approximately 1,100 acres of developable land, dedicated high-voltage power infrastructure, a six-building master plan and liquid cooling designed for advanced computing, the QTS Clinton campus is positioned as a significant hyperscale development platform. The project could substantially expand Iowa's data center capacity while supporting the growing demand for AI, machine learning, cloud computing, and other next-generation digital workloads.
| Field | Value |
|---|---|
| Project Name | QTS Clinton Data Center Campus Iowa 10B Hyperscale Park |
| Location | Harts Mill Road & 400th Avenue (1,100-Acre Assembly), Clinton, IA 52732, USA |
| Status | Proposed / Zoning Ordinance Review & Public Hearing Phase |
| Project Type | Master-Planned Greenfield Hyperscale & AI Supercomputing Campus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Clinton |
| Population | 50,000 (Example placeholder) |
| Urban Agglomeration | 300,000 (Example placeholder) |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.