QTS Phoenix 2 DC2: 42MW High-Density AI & Hyperscale Hub in Arizona

Status: Fully Operational Hub   |   Location: 1250 N 40th St, Phoenix, AZ 85008, USA


Project Overview

QTS Phoenix 2 DC2 is the second major 42 MW hyperscale data center within QTS’s 85-acre Phoenix 2 campus located on North 40th Street in East Phoenix, Arizona. Designed to support the growing demands of hyperscale cloud providers, enterprise digital platforms, and artificial intelligence (AI) and high-performance computing (HPC) environments, the facility delivers scalable, high-performance infrastructure for mission-critical workloads. DC2 is engineered to accommodate high-density deployments with rack power capacities ranging from 40 kW to more than 100 kW per rack, making it well suited for GPU-intensive AI training clusters and next-generation cloud applications. The facility incorporates QTS’s advanced zero-water evaporation cooling technology, eliminating industrial water consumption while maintaining highly efficient thermal performance in Arizona’s arid Sonoran Desert climate. Powered entirely by 100% renewable electricity through Salt River Project (SRP) partnerships, DC2 supports sustainability goals while providing reliable energy for large-scale digital operations. The campus features block-redundant electrical distribution, resilient backup power systems, and path-diverse dark fiber connectivity to major North American carrier networks, internet exchanges, and cloud on-ramp services, ensuring low-latency and high-bandwidth communications. Combined with advanced physical security, automated infrastructure management, and scalable expansion capabilities, QTS Phoenix 2 DC2 provides a future-ready platform for hyperscale cloud, enterprise, and AI-driven digital infrastructure deployments.


Quick Facts

FieldValue
Project NameQTS Phoenix 2 DC2: 42MW High-Density AI & Hyperscale Hub in Arizona
Location1250 N 40th St, Phoenix, AZ 85008, USA
StatusFully Operational Hub
CommissioningPhase 1 Go-Live: Operational / Phased Expansion (2023–2026+)
Total IT Load42 MW Critical IT Power Capacity Allocation (DC2 Building Load)
Total Capacity42 MW Total IT Load across a ~350,000 sq ft (~32,500 m²) gross facility footprint (Campus total: 210+ MW across 1.8M sq ft / 85 acres)
Tier LevelTier III Certified Architecture / ISO 27001, ISO 14001, SOC 1 & 2 Type II, PCI-DSS, HIPAA Compliant
Project TypePurpose-Built Hyperscale, High-Density AI Colocation & Enterprise Cloud Hub

City Profile

HeaderDetails
City NamePhoenix
Populationapprox 28,184$
Urban Agglomeration$approx 198,651$
City GDP$approx $10.91$ Billion USD
Per Capita Income$48,362 USD.
City TierSecondary U.S. Data Center Market
Key StrengthsVibrant Economy:

Companies Involved

HeaderDetails
Developer / Operator QTS Data Centers
Strategic Infrastructure Partner SRP (Salt River Project) Utility Network & City of Phoenix Municipal Authorities
Construction Contractor Specialized US Mission-Critical EPC Contractors
MEP Engineering QTS In-House Global Critical Infrastructure Engineering Teams
Network Connectivity Carrier-neutral platform with dual subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct dark fiber backhaul linking to Phoenix IX, major regional carrier facilities, and national fiber backbones.
Power Infrastructure Dual dedicated 230kV high-voltage utility substations on-site, static distributed 2N / Block Redundant N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt standby diesel generators with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity42 MW Secured Utility Power Allocation (DC2 Building Allocation)
UPS RedundancyBlock Redundant / 2N Static UPS Architecture
Cooling System Closed-loop non-evaporative chilled-water systems, zero-water waste dissipation (WUE = 0.0), Direct-to-Chip Liquid Cooling (DLC) and Rear Door Heat Exchanger (RDHx) readiness for high-density AI clusters, and automated BMS environmental controls.
Connectivity Carrier-neutral host offering direct low-latency cloud express on-ramps (AWS, Azure, GCP via QTS SDP) and cross-connect options across North American fiber corridors.
PUE Target < 1.18 Annualized Operational Design PUE
Energy Mix 100% Certified Carbon-Free Renewable Energy integration via long-term solar/wind Power Purchase Agreements (PPAs) with Salt River Project.

Milestones

HeaderDetails
Announcement 2021
Construction Start 2022
Phase 1 Go-Live Operational (2023)
Full Buildout Operational Active Building

Investment Details

HeaderDetails
Total InvestmentEstimated $300,000,000 USD to $450,000,000 USD Building 2 Capital Expenditure
Funding Corporate Capital Expenditure & Private Equity Infrastructure Financing (Blackstone / QTS)