STACK Infrastructure TOR01 Toronto: 56MW Canadian Hyperscale Campus

Status: Operational / Active Campus Expansion   |   Location: 3650 Danforth Ave, Scarborough, Toronto, ON M1N 2E8, Canada


Project Overview

STACK Infrastructure’s TOR01 Campus is a flagship 56 MW hyperscale data center development located in Scarborough, approximately six miles from downtown Toronto. Situated on a 19-acre site, the campus encompasses approximately 592,000 square feet of technical whitespace across three multi-story facilities, TOR01A, TOR01B, and TOR01C, and is purpose-built to support hyperscale cloud platforms, enterprise computing, and high-density artificial intelligence (AI) workloads. The campus is powered by 100% zero-carbon renewable energy supplied through contracted access with Toronto Hydro using three diverse substations, ensuring exceptional reliability and sustainability. Advanced cooling infrastructure includes closed-loop cooling systems and support for liquid-to-chip manifold cooling, enabling efficient operation of high-density AI and next-generation compute environments. The carrier-neutral campus provides diverse network connectivity with low-latency dark fiber links to Canada's primary carrier hotel at 151 Front Street, offering direct access to major regional, national, and international internet exchange points. Designed for scalability, resilience, and high performance, STACK Infrastructure’s TOR01 Campus combines renewable energy, advanced cooling technologies, and robust interconnection capabilities, making it one of Canada's premier destinations for cloud providers, AI deployments, and enterprise digital infrastructure.


Quick Facts

FieldValue
Project NameSTACK Infrastructure TOR01 Toronto: 56MW Canadian Hyperscale Campus
Location3650 Danforth Ave, Scarborough, Toronto, ON M1N 2E8, Canada
StatusOperational / Active Campus Expansion
CommissioningQ3 2023 (TOR01A Phase 1 Live) / Active Expansion (TOR01B & TOR01C)
Total IT Load56.0 MW
Total Capacity56.0 MW total capacity across 3 buildings (TOR01A: 8MW, TOR01B: 24MW, TOR01C: 24MW) totaling 592,000 sq ft on a 19-acre campus
Tier LevelTier III Equivalent / ISO 27001, SOC 1, SOC 2, PCI-DSS Certified Design
Project TypeGreenfield & Adaptive-Reuse Hyperscale, Cloud & AI Computing Campus

City Profile

HeaderDetails
City NameToronto (Greater Area)
Population~2.8 Million (City)
Urban Agglomeration~6.7 Million (GTA)
City GDP~$450 Billion CAD
Per Capita Income~$65,000 CAD
City TierGlobal Tier 1 Hub
Key StrengthsFinancial Capital, AI Research (Vector Institute), Tech Talent

Companies Involved

HeaderDetails
Developer / Operator STACK Infrastructure
Strategic Infrastructure Partner First Gulf (Development Partner) & Toronto Hydro
Construction Contractor Leading Commercial Canadian Mission-Critical EPC Contracting Partners
MEP Engineering STACK Global Technical Engineering Division
Network Connectivity Carrier-neutral campus featuring two Main Distribution Frames (MDFs), dual subterranean fiber entry paths, and direct cross-connects to 151 Front St.
Power Infrastructure High-voltage utility grid connection fed by 3 diverse Toronto Hydro substations, backed by standby diesel generator arrays.

Technical Specifications

HeaderDetails
Power Capacity56.0 MW critical IT capacity
UPS RedundancyN+1 / block redundant UPS power topology supported by standby diesel generator arrays with 24+ hours of on-site fuel capacity.
Cooling System Closed-loop water cooling systems and liquid-to-chip infrastructure supporting high-density AI rack configurations.
Connectivity Carrier-neutral design featuring dual fiber entry vaults, dual MDFs, and low-latency transit to 151 Front Street interconnect hubs.
PUE Target 1.20–1.25
Energy Mix 100% Zero-Carbon Renewable Energy via Toronto Hydro utility supply.

Milestones

HeaderDetails
Announcement September 2023
Construction Start 2022 (Phase 1 Renovation)
Phase 1 Go-Live September 2023 (TOR01A - 8MW Live)
Full Buildout 2026–2027 (Delivery of TOR01B and TOR01C 24MW phases)

Investment Details

HeaderDetails
Total Investment$450,000,000+ USD (~$600,000,000+ CAD)
Funding Direct corporate capital expenditure & green debt financing managed by STACK Infrastructure (I Squared Capital)

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.