Vantage VA2 Ashburn II: 96MW Northern Virginia Hyperscale Campus

Status: Operational / Active Campus Expansion   |   Location: 22435 Glenn Drive, Sterling, VA 20164, USA


Project Overview

Vantage Data Centers' Ashburn II (VA2) Campus is a 96 MW hyperscale data center campus located in Sterling/Ashburn, Loudoun County, Virginia, one of the world's leading data center markets. Spanning approximately 800,000 square feet across three multi-story facilities on an 18-acre campus, VA2 is purpose-built to support hyperscale cloud platforms, enterprise computing, and high-density artificial intelligence (AI) workloads with rack densities of up to 300 W/sq ft. Power is delivered through high-reliability dual transmission feeds from Dominion Energy, providing resilient and scalable electrical infrastructure for mission-critical operations. The campus features advanced closed-loop chilled water cooling systems with air-side economizers, enabling highly efficient operation with near-zero Water Utilization Efficiency (WUE) while maintaining N+2 mechanical redundancy for enhanced reliability. Located less than two miles from Vantage's VA1 campus and key regional internet peering exchanges, the carrier-neutral facility delivers exceptional network performance through six Meet-Me-Rooms (MMRs) and three subterranean Points of Entry (POEs), ensuring diverse fiber routing and low-latency connectivity. Combining scalable power, sustainable cooling technologies, robust network infrastructure, and proximity to the largest concentration of cloud and internet providers, the VA2 Campus is a premier destination for hyperscale, AI, and enterprise digital infrastructu


Quick Facts

FieldValue
Project NameVantage VA2 Ashburn II: 96MW Northern Virginia Hyperscale Campus
Location22435 Glenn Drive, Sterling, VA 20164, USA
StatusOperational / Active Campus Expansion
CommissioningOperational (Building 1 Live) / Active Expansion
Total IT Load96.0 MW
Total Capacity96.0 MW (Master-planned across 800,000 sq ft in 3 multi-story facilities on an 18-acre campus)
Tier LevelTier III Equivalent / ISO 27001, SOC 1, SOC 2, PCI DSS Certified Architecture
Project TypeGreenfield Hyperscale, Cloud & High-Density AI Computing Campus

City Profile

HeaderDetails
City NameSterling
Population~31,000
Urban Agglomeration~420,000 (part of the Washington metropolitan area)
City GDP~USD 18 billion (estimated local economy contribution)
Per Capita Income~USD 62,000 annually
City TierTier 3 City (major suburban commercial and technology center)
Key StrengthsProximity to Washington D.C., data centers, technology services, logistics, strong transportation access, Dulles International Airport connectivity, business parks, high household income

Companies Involved

HeaderDetails
Developer / Operator Vantage Data Centers
Strategic Infrastructure Partner Dominion Energy Virginia & Loudoun County Economic Development
Construction Contractor Leading Commercial Mission-Critical EPC Contracting Partners
MEP Engineering Vantage Global Technical Engineering Division
Network Connectivity Carrier-neutral site featuring six Meet-Me-Rooms (MMRs), three subterranean points of entry (POEs), and low-latency transit to Ashburn exchange hubs.
Power Infrastructure High-voltage transmission utility feeds operated by Dominion Energy, backed by N+1 static UPS modules and emergency diesel generator arrays.

Technical Specifications

HeaderDetails
Power Capacity96.0 MW total critical IT capacity
UPS RedundancyConcurrently maintainable N+1 UPS power topology supported by standby diesel generator arrays with bulk fuel storage.
Cooling System Closed-loop chilled water system with air-cooled chillers, integrated air-side economizers, and N+2 mechanical redundancy.
Connectivity Carrier-neutral design featuring 3 points of entry (POEs), 6 Meet-Me-Rooms, and access to all major regional fiber service providers.
PUE Target 1.20–1.25
Energy Mix Integrated grid power with options for 100% Renewable Energy Credits (RECs) and zero-water-evaporation cooling.

Milestones

HeaderDetails
Announcement 2021
Construction Start 2021
Phase 1 Go-Live 2022 (Building 1 Operational)
Full Buildout Active expansion across 3 campus buildings up to 96 MW

Investment Details

HeaderDetails
Total Investment$600,000,000+ USD
Funding Direct corporate capital expenditure & institutional growth debt facilities managed by Vantage Data Centers and DigitalBridge