Vantage Santa Clara: 152MW Silicon Valley Hyperscale Campus Hub

Status: Operational / Active Expansion   |   Location: 2820 Northwestern Pkwy (CA1) & 737 Mathew Street (CA2), Santa Clara, CA 95051, USA


Project Overview

Vantage Data Centers’ Santa Clara Campus is the largest data center development in Silicon Valley, combining the flagship Santa Clara I (CA1) campus and the adjacent Santa Clara II (CA2) expansion campus. Together, the campuses deliver a combined 152 MW of critical IT capacity across a 30-acre site with nine multi-story buildings, providing mission-critical infrastructure for hyperscale cloud providers, technology enterprises, and high-density artificial intelligence (AI) computing platforms. Power is supplied by Silicon Valley Power (SVP), offering highly reliable service and competitive municipal utility rates supported by dedicated 50 MW on-site substations. The CA1 Campus is recognized as the largest LEED Platinum-certified data center campus in North America, reflecting Vantage’s commitment to sustainability and energy efficiency. The facilities utilize advanced closed-loop chilled water cooling systems with air-side economizers, supporting rack densities ranging from standard enterprise deployments to 35 kW per rack for demanding AI and high-performance computing workloads. As carrier-neutral campuses, CA1 and CA2 provide diverse fiber connectivity to major internet exchanges and network providers throughout Northern California, enabling low-latency, high-bandwidth connectivity. With its strategic Silicon Valley location, scalable power infrastructure, sustainable design, and exceptional network ecosystem, the Santa Clara Campus is a premier destination for cloud, AI, and enterprise digital infrastructure.


Quick Facts

FieldValue
Project NameVantage Santa Clara: 152MW Silicon Valley Hyperscale Campus Hub
Location2820 Northwestern Pkwy (CA1) & 737 Mathew Street (CA2), Santa Clara, CA 95051, USA
StatusOperational / Active Expansion
Commissioning2011 (CA1 Flagship) / 2021 (CA2 Expansion Go-Live)
Total IT Load152.0 MW
Total Capacity152.0 MW critical IT load across two campuses totaling 876,000+ sq ft across 9 multi-story facilities (CA1: 77MW across 335,000 sq ft; CA2: 75MW across 541,000 sq ft)
Tier LevelTier III Equivalent / LEED Platinum Certified (CA1) / ISO 27001, SOC 1, SOC 2, PCI DSS Certified
Project TypeGreenfield & Redevelopment Hyperscale, Cloud & High-Density AI Computing Campus

City Profile

HeaderDetails
City NameSanta Teresa
Population≈ 5,044 (2020 Census)
Urban Agglomeration~547,000
City GDPGDP figures are not published
Per Capita Income≈ $27,400
City TierIn U.S. terms, Santa Teresa would be categorized as a small community
Key StrengthsStrategic Border Location: Home to the Santa Teresa Port of Entry, making it important for international trade and logistics with Mexico.

Companies Involved

HeaderDetails
Developer / Operator Vantage Data Centers
Strategic Infrastructure Partner Silicon Valley Power (SVP) & City of Santa Clara
Construction Contractor Holder Construction (General Contractor) & Construction Testing Services (CTS)
MEP Engineering Vantage Global Technical Engineering Division & kW Mission Critical Engineering
Network Connectivity Carrier-neutral design featuring four Points of Entry (POEs), multiple Meet-Me-Rooms (MMRs) per building, and dark/lit fiber intersite pathways.
Power Infrastructure Multiple on-site 50 MW high-voltage substations fed by Silicon Valley Power (SVP), backed by 2N/N+1 UPS systems and standby generators.

Technical Specifications

HeaderDetails
Power Capacity152.0 MW total critical IT capacity (77MW CA1 + 75MW CA2)
UPS RedundancyConcurrently maintainable N+1 and 2N UPS power topology supported by standby diesel generator arrays.
Cooling System Closed-loop chilled water systems with air-side economization supporting high-density rack configurations exceeding 35 kW/rack.
Connectivity Carrier-neutral design featuring 4 POEs, dual dark fiber routes between CA1 and CA2, and direct access to regional cloud hubs.
PUE Target 1.20–1.25
Energy Mix Silicon Valley Power grid integration with renewable energy options and LEED Platinum sustainable campus design.

Milestones

HeaderDetails
Announcement 2010 (CA1) / 2019 (CA2 Expansion)
Construction Start 2010 (CA1 Groundbreaking) / 2020 (CA2 Construction)
Phase 1 Go-Live 2011 (CA11 Initial Building) / 2021 (CA2 Building 1 Live)
Full Buildout Operational (Phased expansions active across CA1 & CA2 facilities)

Investment Details

HeaderDetails
Total Investment$1,200,000,000+ USD
Funding Direct corporate capital expenditure, asset-backed securitizations, & growth debt managed by Vantage Data Centers and DigitalBridge